Paris - June 28th, 2022. GTT announces that it has received an order fromits partner the Korean shipyard Samsung Heavy Industries for the tank designof two new LNGC[1], on behalf of an European ship owner.

These two LNG carrierswill havea total LNG tank capacity of 174,000 m3 per shipand will be fitted with theMark III Flexmembrane containmentsystem, developed by GTT.

Deliveries of the vessels are scheduled for the last quarter of 2024 and the first quarter of 2026.

Media contact:
press@gtt.fr/ +33 1 30 23 48 45

Investor Relations contact:
information-financiere@gtt.fr/ + 33 (0)1 30 23 20 87

>Download in .pdf

[1]Liquefied Natural Gas Carrier

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

GTT – Gaztransport & Technigaz SA published this content on 28 June 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 30 June 2022 16:02:08 UTC.