JOHANNESBURG. 8 November 2019:Gold Fields Limited (NYSE & JSE: GFI) is pleased to provide an operational update for the quarter ended 30 September 2019. Detailed financial and operational results are provided on a six-monthly basis i.e. at the end of June and December.
Key Statistics
United States Dollars | ||||||||||
Quarter | ||||||||||
Figures are in millions unless otherwise stated | September | June | September | |||||||
2019 | 2019 | 2018 | ||||||||
Gold produced* | oz (000) | 523 | 541 | 533 | ||||||
Tonnes milled/treated | 000 | 9,850 | 9,037 | 8,878 | ||||||
Revenue (excluding Asanko) | US$/oz | 1,469 | 1,297 | 1,184 | ||||||
Cost of sales before gold inventory change | ||||||||||
and amortisation and depreciation | ||||||||||
(excluding Asanko) | US$/tonne | 44 | 42 | 41 | ||||||
All-in sustaining costs - original interpretation | US$/oz | 1,018 | 985 | 977 | ||||||
All-in sustaining costs - revised interpretation | ||||||||||
guidance WGC | US$/oz | 947 | 910 | - | ||||||
Total all-in cost | US$/oz | 1,084 | 1,132 | 1,140 | ||||||
Net debt (Pre - IFRS16) | US$m | 1,401 | 1,498 | 1,564 | ||||||
Net debt (Post - IFRS16) | US$m | 1,735 | 1,794 | - |
*Gold produced in this table is attributable and includes Gold Fields share of 45 per cent in Asanko.
All of the key statistics are managed figures.
All operations are wholly owned except for Tarkwa and Damang in Ghana (90.0 per cent), Cerro Corona in Peru (99.5 per cent), Gruyere JV (50 per cent) and Asanko JV (45 per cent equity share).
Gold produced (and sold) throughout this report includes copper gold equivalents of approximately 7 per cent of Group production.
Figures may not add as they are rounded independently.
STOCK DATA FOR THE 3 MONTHS ENDED 30 SEPTEMBER 2019
Number of shares in issue
- at end September 2019 | 828,632,707 |
- average for the quarter | 828,632,707 |
Free Float | 100 per cent |
ADR Ratio | 1:1 |
Bloomberg/Reuters | GFISJ/GFLJ.J |
NYSE - (GFI)
Range - Quarter | US$4.53 - US$6.14 |
Average Volume - Quarter | 9,054,853 shares/day |
JSE LIMITED - (GFI) | |
Range - Quarter | ZAR66.49 - ZAR95.79 |
Average Volume - Quarter | 3,466,471 shares/day |
Gold Fields 2019Operating Update September Quarter | 2 |
Statement by Nick Holland,
Chief Executive Officer of Gold Fields
Q3 2019 performance
Attributable equivalent gold production for the quarter was 2% lower YoY (3% lower QoQ) at 523koz. Production for the quarter was impacted by an unusually high lock up of gold in circuit at two of the Australian operations; lower grade at Damang as the mine transitions into the main pit; as well as lower grades mined and the lower price factor at Cerro Corona. South Deep delivered another improved quarter, with production increasing 6% QoQ.
All-in sustaining costs (AISC), on the original interpretation, were 4% higher YoY (3% higher QoQ) at US$1,018/oz, AISC, on the revised interpretation for Q3 2019 was US$947/oz, 4% higher QoQ. All-in costs (AIC) were 5% lower YoY (4% lower QoQ) at US$1,084/oz.
The net debt balance (pre-IFRS16) decreased by US$97m to US$1,401m from US$1,498m at 30 June 2019. Apart from the cash generated by the operations, there were a number of components that impacted the net debt during the quarter including: US$92m inflow from the sale of the Gold Road and Hummingbird stakes; US$34m outflow for the interim dividend; US$10m paid to Asanko as part of the deferred purchase consideration.
minimum total process plant throughput rate of 70% of nameplate capacity, and a minimum average gold recovery of 85% of expected life of mine metallurgical recovery) were achieved at Gruyere at the end of the September quarter, slightly ahead of schedule. Given the fact that throughput rates and gold recoveries have been above expectations during the ramp up, gold production for 2019 is expected to be at the upper end of guidance of 75koz - 100koz (100% basis). The final forecast capital cost is now estimated at A$607m (100% basis, +/- 1%).
Damang
Production at Damang decreased 9% QoQ to 49.7koz from 54.6koz in the June quarter, driven predominantly by lower yield. Ore tonnes mined decreased by 25% QoQ due to completion of mining of the Amoanda pit ahead of plan together with a higher proportion of mining at the west end of the Damang pit complex which has a higher strip ratio. At the end of the September quarter, 33 months into the Damang Reinvestment Project, total material mined amounted to 111Mt (17% ahead of the project schedule) while gold produced was 486koz (21% above plan of 401koz). Project capital spent to date is US$339m compared to plan of US$300m, largely driven by the additional capital waste tonnes mined.
Regional operational performance
The Australian region produced 210koz for the quarter, down 6% YoY (up 2% QoQ), with Gruyere contributing for the first time. Production for the quarter was impacted by a build-up of gold in circuit at the end of the quarter at both St Ives and Gruyere, amounting to approximately 7koz in total which was recovered shortly after quarter-end. AIC for the region was A$1,538/oz (US$1,054/oz), up 16% YoY (down 14% QoQ) as the project capex at Gruyere comes to an end.
Production in Ghana for Q3 2019 was 205koz, up 5% YoY (down 5% QoQ), with AIC of US$1,067/oz, largely flat YoY (up 3% QoQ). As the reinvestment project at Damang progresses, the mine is currently transitioning through the anticipated lower (more variable) grade Huni sandstone lithology, which impacted production in the quarter.
Gold equivalent production at Cerro Corona was down 22% YoY (down 19% QoQ) at 65koz, due to lower grades mined (as per mining sequence) and the lower price factor. Consequently, AIC for the quarter was US$929 per equivalent ounce, up 34% YoY (up 29% QoQ).
Production at South Deep increased again in Q3 2019 to 1,897kg (61koz), up 23% YoY (up 6% QoQ). Encouragingly, AIC for the quarter decreased to R588,855/kg (US$1,258/oz), which enabled the mine to be cash positive for Q3 2019, being the second consecutive quarter. There was continued QoQ improvement in a number of enabling activities at the mine including, destress mining, long hole stoping and placement of backfill. South Deep is expected to exceed its production guidance for the year by between 5% and 10%. The AIC guidance is expected to be achieved.
Update on projects
Gruyere
Gruyere produced 29koz (100% basis) during Q3 2019. Encouragingly, commercial levels of production (defined as a
Salares Norte
The EIA process is progressing well and we expect it to be granted before the middle of 2020. We continue to work on a financing plan and have commenced a process to evaluate the possibility of bringing in a partner for the project. Detailed engineering continues and was 47% complete at the end of Q3 2019.
Guidance unchanged
Gold Fields expects to end 2019 on a strong footing and we expect to achieve previous production and all-in cost guidance for the year. This provides us with a solid base to grow production and reduce all-in costs into 2020, enabling the group to generate strong free cash flow.
Attributable equivalent gold production for the Group for 2019 is now expected to be at the upper end of the previously announced range of 2.13Moz to 2.18Moz. AISC is expected to be between US$980/oz and US$995/oz based on the original WGC interpretation. AIC is planned to be between US$1,075/oz and US$1,095/oz. These expectations assume exchange rates of R/US$:14.50 and A$/US$:0.69.
Hedging
As reported in August 2019, Gold Fields entered into select tactical hedges for 2020 during H1 2019. The hedges were entered into in order to underwrite real net debt reduction of US$300-400m by the end of 2020. We do not plan to undertake any other hedging activity for 2020 or beyond. However, in line with our hedging policy, we could look at hedging production at Salares Norte (not the rest of the Group) in order to underwrite the payback for the project.
Nick Holland
Chief Executive Officer
8 November 2019
3
Gold Fields 2019Operating Update September Quarter
SALIENT FEATURE AND COST BENCHMARKS
Figures in millions unless otherwise stated
Total | Total | ||
Mine | Mine | ||
Operations | Operations | ||
Including | Excluding | ||
Equity | Equity | ||
accounted | accounted | ||
Joint Venture | Joint Venture | ||
South Africa
Region
South |
Deep |
South | ||
West Africa | America | |
Region | Region | |
Ghana | Peru |
Total | Tarkwa | Damang | Asanko* | Cerro | ||||
45% | Corona | |||||||
Operating Results | Sept 2019 | 9,850 | |||
Ore milled/treated Օ | June 2019 | 9,037 | |||
(000 tonnes) | Sept 2018 | 8,878 | |||
Yield | Sept 2019 | 1.8 | |||
(grams per tonne) Օ | June 2019 | 1.9 | |||
Sept 2018 | 2.0 | ||||
Gold produced | Sept 2019 | 540.7 | |||
(000 managed equivalent ounces) | June 2019 | 559.9 | |||
Sept 2018 | 550.7 | ||||
Gold sold | Sept 2019 | 523.2 | |||
(000 managed equivalent ounces) | June 2019 | 565.6 | |||
Sept 2018 | 545.6 | ||||
Cost of sales before amortisation | Sept 2019 | (374.8) | |||
and depreciation | June 2019 | (379.5) | |||
(million) | Sept 2018 | (352.2) | |||
Cost of sales before gold inventory | Sept 2019 | 46 | |||
change and amortisation and | June 2019 | 42 | |||
depreciation (dollar per tonne) | Sept 2018 | 41 | |||
Sustaining capital | Sept 2019 | (114.4) | |||
(million) | June 2019 | (129.5) | |||
(original interpretation) | Sept 2018 | (142.5) | |||
Non-sustaining capital | Sept 2019 | (20.6) | |||
(million) | June 2019 | (66.3) | |||
(original interpretation) | Sept 2018 | (36.3) | |||
Total capital expenditure | Sept 2019 | (134.8) | |||
(million) | June 2019 | (195.8) | |||
Sept 2018 | (178.8) | ||||
All-in-sustaining costs | Sept 2019 | 1,011 | |||
(dollar per ounce) | June 2019 | 970 | |||
(original interpretation) | Sept 2018 | 966 | |||
All-in-sustaining costs | Sept 2019 | 940 | |||
(dollar per ounce) | June 2019 | 895 | |||
(revised interpretation) | Sept 2018 | ||||
Total all-in-cost | Sept 2019 | 1,057 | |||
(dollar per ounce) | June 2019 | 1,096 | |||
Sept 2018 | 1,038 |
9,202 | 563 |
8,418 | 282 |
8,491 | 387 |
1.7 | 3.4 Օ |
1.9 | 6.3 Օ |
2.0 | 4.0 Օ |
512.6 | 61.0 |
532.0 | 57.3 |
533.1 | 49.5 |
494.9 | 58.4 |
535.7 | 58.6 |
527.5 | 47.3 |
(350.7) | (64.2) |
(358.1) | (65.1) |
(338.7) | (66.1) |
44 | 120 |
42 | 222 |
41 | 178 |
(109.5) | (8.0) |
(118.4) | (8.3) |
(139.0) | (10.5) |
(19.5) | - |
(64.7) | - |
(35.9) | (4.8) |
(128.8) | (8.0) |
(183.1) | (8.3) |
(174.9) | (15.3) |
1,000 | 1,258 |
958 | 1,275 |
960 | 1,663 |
925 | 1,258 |
878 | 1,275 |
1,042 | 1,258 |
1,087 | 1,275 |
1,034 | 1,764 |
5,242 | 3,437 | 1,158 | 648 | 1,648 | ||||
5,227 | 3,441 | 1,167 | 619 | 1,652 | ||||
4,914 | 3,450 | 1,077 | 387 | 1,712 | ||||
1.2 | 1.2 | 1.3 | 1.3 | 1.2 | ||||
1.3 | 1.2 | 1.5 | 1.4 | 1.5 | ||||
1.2 | 1.1 | 1.6 | 1.4 | 1.5 | ||||
205.1 | 127.3 | 49.7 | 28.1 | 64.8 | ||||
216.8 | 134.2 | 54.6 | 27.9 | 80.3 | ||||
195.5 | 126.5 | 51.3 | 17.6 | 83.2 | ||||
205.4 | 127.3 | 49.7 | 28.4 | 65.6 | ||||
218.7 | 134.2 | 54.6 | 29.9 | 76.9 | ||||
195.9 | 126.5 | 51.3 | 18.1 | 80.0 | ||||
(141.2) | (82.7) | (34.5) | (24.0) | (39.3) | ||||
(138.2) | (86.5) | (30.3) | (21.4) | (38.7) | ||||
(118.6) | (76.0) | (29.1) | (13.5) | (38.9) | ||||
28 | 25 | 34 | 32 | 25 | ||||
27 | 26 | 28 | 32 | 24 | ||||
26 | 21 | 34 | 41 | 23 | ||||
(33.9) | (27.1) | (1.9) | (4.9)& | (15.5) | ||||
(42.3) | (29.7) | (1.5) | (11.0)& | (9.5) | ||||
(45.3) | (38.3) | (3.5) | (3.5) | (10.7) | ||||
(18.2) | - | (17.1) # | (1.1) | - | ||||
(24.9) | - | (23.2) # | (1.7) | − | ||||
(31.5) | − | (31.1) # | (0.4) | − | ||||
(52.1) | (27.1) | (18.9) | (6.1) | (15.5) | ||||
(67.2) | (29.7) | (24.7) | (12.7) | (9.5) | ||||
(76.8) | (38.3) | (34.6) | (3.9) | (10.7) | ||||
967 | 969 | 842 | 1,179 | 698 | ||||
917 | 958 | 673 | 1,180 | 381 | ||||
900 | 972 | 682 | 1,018 | 443 | ||||
967 | 969 | 842 | 1,179 | 604 | ||||
917 | 958 | 673 | 1,180 | 364 | ||||
1,067 | 969 | 1,185 | 1,301 | 698 | ||||
1,032 | 958 | 1,097 | 1,247 | 381 | ||||
1,061 | 972 | 1,288 | 1,039 | 443 | ||||
South African | ||||||
United States Dollars | Australian Dollars | Rand | ||||
Australia | Australia | South Africa | ||||
Region | Region | Region | ||||
Australia | Australia | |||||||||
Total | St Ives | Agnew | Granny | Gruyere | Total | St Ives | Agnew | Granny | Gruyere | South |
Smith | 50% | Smith | 50% | Deep | ||||||
Operating Results | Sept 2019 | 2,396 | 1,070 | 307 | 464 | 555 | 2,396 | 1,070 | 307 | 464 | 555 | 563 | ||||||||
Ore milled/treated | June 2019 | 1,877 | 1,152 | 305 | 420 | - | 1,877 | 1,152 | 305 | 420 | - | 282 | ||||||||
(000 tonnes) | Sept 2018 | 1,866 | 1,077 | 310 | 479 | - | 1,866 | 1,077 | 310 | 479 | - | 387 | ||||||||
Yield | Sept 2019 | 2.7 | 2.2 | 5.1 | 4.7 | 0.8 | 2.7 | 2.2 | 5.1 | 4.7 | 0.8 | 3.4 Օ | ||||||||
(grams per tonne) | June 2019 | 3.3 | 2.3 | 5.8 | 4.8 | - | 3.3 | 2.3 | 5.8 | 4.8 | - | 6.3 Օ | ||||||||
Sept 2018 | 3.7 | 2.6 | 6.2 | 4.7 | - | 3.7 | 2.6 | 6.2 | 4.7 | - | 4.0 Օ | |||||||||
Gold produced | Sept 2019 | 209.8 | 75.2 | 50.4 | 69.7 | 14.6 | 209.8 | 75.2 | 50.4 | 69.7 | 14.6 | 1,897 | ||||||||
(000 managed equivalent ounces) | June 2019 | 205.6 | 84.6 | 56.4 | 64.7 | - | 205.6 | 84.6 | 56.4 | 64.7 | - | 1,782 | ||||||||
Sept 2018 | 222.6 | 89.2 | 61.3 | 72.1 | - | 222.6 | 89.2 | 61.3 | 72.1 | - | 1,539 | |||||||||
Gold sold | Sept 2019 | 193.7 | 78.2 | 45.7 | 69.8 | - | 193.7 | 78.2 | 45.7 | 69.8 | - | 1,818 | ||||||||
(000 managed equivalent ounces) | June 2019 | 211.5 | 90.2 | 56.5 | 64.8 | - | 211.5 | 90.2 | 56.5 | 64.8 | - | 1,822 | ||||||||
Sept 2018 | 222.1 | 88.9 | 61.4 | 71.8 | - | 222.1 | 88.9 | 61.4 | 71.8 | - | 1,472 | |||||||||
Cost of sales before amortisation | Sept 2019 | (130.1) | (53.2) | (36.2) | (40.7) | - | (189.6) | (77.6) | (52.8) | (59.2) | - | (936.5) | ||||||||
and depreciation | June 2019 | (137.5) | (60.7) | (39.3) | (37.5) | - | (196.2) | (86.7) | (56.1) | (53.4) | - | (934.7) | ||||||||
(million) | Sept 2018 | (128.6) | (47.5) | (37.6) | (43.6) | - | (176.1) | (64.6) | (51.8) | (59.7) | - | (941.0) | ||||||||
Cost of sales before gold inventory | Sept 2019 | 78 | 57 | 140 | 88 | - | 114 | 82 | 203 | 127 | - | 1,742 | ||||||||
change and amortisation and | June 2019 | 70 | 49 | 135 | 90 | - | 99 | 69 | 192 | 129 | - | 3,189 | ||||||||
depreciation (dollar per tonne) | Sept 2018 | 68 | 43 | 122 | 87 | - | 93 | 60 | 168 | 120 | - | 2,494 | ||||||||
Sustaining capital | Sept 2019 | (56.8) | (23.8) | (15.3) | (17.7) | - | (82.9) | (34.6) | (22.5) | (25.8) | - | (117.1) | ||||||||
(million) | June 2019 | (69.4) | (25.9) | (26.2) | (17.3) | - | (99.0) | (36.9) | (37.4) | (24.7) | - | (119.2) | ||||||||
(original interpretation) | Sept 2018 | (76.0) | (36.4) | (17.7) | (21.9) | - | (103.9) | (49.6) | (24.2) | (30.0) | - | (145.7) | ||||||||
Non-sustaining capital | Sept 2019 | (2.5) | − | − | − | (2.5) | (3.7) | − | − | − | (3.7) | − | ||||||||
(million) | June 2019 | (41.5) | − | − | − | (41.5) | (59.0) | − | − | − | (59.0) | − | ||||||||
(original interpretation) | Sept 2018 | − | − | − | − | - | − | − | − | − | - | (68.7) | ||||||||
Total capital expenditure | Sept 2019 | (59.2) | (23.8) | (15.3) | (17.7) | (2.5) | (86.7) | (34.6) | (22.5) | (25.8) | (3.7) | (117.1) | ||||||||
(million) | June 2019 | (110.9) | (25.9) | (26.2) | (17.4) | (41.5) | (158.0) | (36.9) | (37.4) | (24.7) | (59.0) | (119.2) | ||||||||
Sept 2018 | (76.0) | (36.4) | (17.7) | (21.9) | - | (103.9) | (49.6) | (24.2) | (30.0) | - | (214.4) | |||||||||
All-in-sustaining costs | Sept 2019 | 1,041 | 1,050 | 1,200 | 927 | - | 1,519 | 1,533 | 1,756 | 1,347 | − | 588,855 | ||||||||
(dollar per ounce) | June 2019 | 1,052 | 1,029 | 1,224 | 936 | - | 1,502 | 1,468 | 1,747 | 1,335 | - | 590,492 | ||||||||
(original interpretation) | Sept 2018 | 969 | 993 | 945 | 957 | - | 1,325 | 1,355 | 1,300 | 1,311 | - | 758,304 | ||||||||
All-in-sustaining costs | Sept 2019 | 878 | 873 | 1,061 | 763 | - | 1,280 | 1,275 | 1,548 | 1,109 | − | 588,855 | ||||||||
(dollar per ounce) | June 2019 | 868 | 873 | 983 | 760 | - | 1,238 | 1,245 | 1,402 | 1,085 | - | 590,492 | ||||||||
(revised interpretation) | Sept 2018 | − | − | − | − | - | − | − | − | − | - | - | ||||||||
Total all-in-cost | Sept 2019 | 1,054 ø | 1,050 | 1,200 | 927 | - | 1,538 ø | 1,533 | 1,756 | 1,347 | − | 588,855 | ||||||||
(dollar per ounce) | June 2019 | 1,249 ø | 1,029 | 1,224 | 936 | - | 1,781 ø | 1,468 | 1,747 | 1,335 | - | 590,492 | ||||||||
Sept 2018 | 969 | 993 | 945 | 957 | - | 1,325 | 1,355 | 1,300 | 1,311 | - | 804,998 |
Average exchange rates were US$1 = R14.63, US$1 = R14.40 and US$1 = R14.03 for the September 2019, June 2019 and September 2018 quarters, respectively.
The Australian/US dollar exchange rates were A$1 = US$0.69, A$1 = US$0.70 and A$1 = US$0.73 for the September 2019, June 2019 and September 2018 quarters, respectively. Figures may not add as they are rounded independently.
-
Relates tonon-sustaining capital expenditure for Damang re-investment project. * Equity accounted Joint Venture.
&Includes Gold Fields 45 per cent share of deferred stripping of US$10.2 million and US$20.5 million for the September 2019 and June 2019 quarters, respectively.
ՕYield includes underground reef yield of 5.78g/t (321,100t) and surface yield of 0.17g/t (234,000t) in the September quarter compared with 6.33g/t (269,000t) and 3.97g/t (1,400t), respectively, in the June quarter.
Includes underground cost of US$204/t and surface cost of US$2/t in the September quarter compared with US$222/t and US$71/t, respectively, in the June quarter. øIncludes Gruyere capital expenditure with no ounces sold reported due to commercial levels of production not achieved until end September.
4 | Gold Fields 2019Operating Update September Quarter | ||||||||
Review of Operations | decreased by 96 per cent from 3.97 grams per tonne to 0.17 | ||||||||
grams per tonne due to treating 1,400 tonnes of industrial waste | |||||||||
Quarter ended 30 September compared | material in the June quarter compared with 234,000 tonnes treated | ||||||||
in the September quarter comprising of 4,000 tonnes industrial | |||||||||
with quarter ended 30 June 2019 | waste and 230,000 tonnes tailings reclamation. | ||||||||
South Africa region | Destress mining increased by 31 per cent from 6,310 square | ||||||||
metres in the June quarter to 8,291 square metres in the | |||||||||
South Deep Project | |||||||||
September quarter. The increase is due to improved operational | |||||||||
Sept | June | ||||||||
efficiency as a result of the mine business improvement programs | |||||||||
2019 | 2019 | ||||||||
and the reallocation of resources to destress mining as new | |||||||||
Gold produced | 000'oz | 61.0 | 57.3 | ||||||
destress cuts became available. | |||||||||
kg | 1,897 | 1,782 | |||||||
Gold sold | 000'oz | 58.4 | 58.6 | Longhole stoping increased by 46 per cent from 137,500 tonnes | |||||
kg | 1,818 | 1,822 | |||||||
Yield - underground reef | g/t | 5.78 | 6.60 | to 200,400 tonnes. Development decreased by 10 per cent from | |||||
Surface yield | g/t | 0.17 | 3.97 | 1,133 metres in the June quarter to 1,015 metres in the September | |||||
Total yield | g/t | 3.37 | 6.33 | quarter. Development in the current mine areas increased by 7 | |||||
AISC- original interpretation | R/kg | 588,855 | 590,492 | per cent from 261 metres in the June quarter to 280 metres in the | |||||
US$/oz | 1,258 | 1,275 | |||||||
September quarter. Development North of Wrench decreased by | |||||||||
AISC - revised interpretation | |||||||||
16 per cent from 872 metres in the June quarter to 735 metres in | |||||||||
guidance (WGC November | |||||||||
the September quarter due to resources allocated to destress | |||||||||
2018) | R/kg | 588,855 | 590,492 | ||||||
mining and due to development being significantly ahead of | |||||||||
US$/oz | 1,258 | 1,275 | |||||||
requirement. | |||||||||
AIC | R/kg | 588,855 | 590,492 | ||||||
US$/oz | 1,258 | 1,275 |
Gold production increased by 6 per cent from 1,782 kilograms (57,306 ounces) in the June quarter to 1,897 kilograms (60,990 ounces) in the September quarter in line with the 2019 ramp up plan post the restructuring process concluded at the end of 2018.
Total underground tonnes mined increased by 26 per cent from 270,100 tonnes in the June quarter to 339,400 tonnes in the September quarter. Ore tonnes mined increased by 29 per cent from 253,700 tonnes to 328,300 tonnes, while underground waste mined decreased by 32 per cent from 16,400 tonnes to 11,100 tonnes. Underground reef grade mined decreased by 9 per cent from 6.29 grams per tonne to 5.70 grams per tonne. Total gold mined from underground increased by 17 per cent from 1,596 kilograms (51,300 ounces) in the June quarter to 1,872 kilograms (60,200 ounces) in the September quarter.
Total tonnes milled increased by 100 per cent from 281,500 tonnes in the June quarter to 562,700 tonnes in the September quarter. Underground reef tonnes milled increased by 19 per cent from 269,000 tonnes in the June quarter to 321,100 tonnes in the September quarter mainly due to increased stoping volume as a result of improved stope availability. In the September quarter 18 stopes were mined compared with 12 stopes in the June quarter. Underground reef yield decreased by 12 per cent from 6.60 grams per tonne to 5.78 grams per tonne due to mining in lower grade areas.
Surface tailings material treated increased substantially from 1,400 tonnes in the June quarter to 234,300 tonnes in the September quarter mainly due to increased backfill placement capability, enabled by the new CIL circuit being commissioned. In the June quarter re-mining tonnes were not processed for gold recovery but instead were pumped directly underground for backfill (not declared as surface treatment). Post commissioning of the new CIL circuit (which allows for the separating out of underground treatment and surface treatment) re-mining tonnes were again treated for gold recovery prior to being pumped underground for backfill.
Gold recovered from underground amounted to 1,857 kilograms (59,703 ounces). In addition, 40 kilograms (1,286 ounces) were recovered from the treatment of surface material. Surface yield
The current mine contributed 38 per cent of the total ore tonnes in the September quarter compared with 45 per cent of the total ore tonnes in the June quarter. The North of Wrench contributed 62 per cent of the total ore tonnes in the September quarter compared with 55 per cent in the June quarter. The tonnage contribution from longhole stoping increased by 8 per cent from 51 per cent in the June quarter to 59 per cent in the September quarter.
Cost of sales before amortisation and depreciation was similar at R937 million (US$64 million). Cost of sales before gold inventory change and amortisation and depreciation increased by 9 per cent from R898 million (US$62 million) in the June quarter to R981 million (US$67 million) in the September quarter mainly due to increased utilities, contractors and consumable costs in the September quarter due to increased production and two months winter electricity tariffs. This was offset by a gold-in-process credit to cost of R44 million (US$3 million) in the September quarter compared with a charge to cost of R37 million (US$3 million) in the June quarter. The net gold-in-process movement was R81 million (US$6 million).
Capital expenditure decreased by 2 per cent from R119 million (US$8 million) in the June quarter to R117 million (US$8 million) in the September quarter.
Sustaining capital expenditure decreased by 2 per cent from R119 million (US$8 million) in the June quarter to R117 million (US$8 million) in the September quarter due to a decrease in major component and rebuild costs for the mine's fleet. No growth capital expenditure was incurred for the June and September 2019 quarters in line with the operational plan.
All-in sustaining costs and all-in costs decreased marginally from R590,492 per kilogram (US$1,275 per ounce) in the June quarter to R588,855 per kilogram (US$1,258 per ounce) in the September quarter mainly due to higher gold sold, lower sustaining capital expenditure, partially offset by marginally higher cost of sales before amortisation and depreciation.
5 | Gold Fields 2019Operating Update September Quarter | |||||||||||
West Africa region | Total tonnes mined, including capital stripping, remained similar at | |||||||||||
Ghana | 8.4 million tonnes. | |||||||||||
Tarkwa | ||||||||||||
Sept | June | Ore tonnes mined, decreased by 25 per cent from 1.34 million | ||||||||||
2019 | 2019 | tonnes in the June quarter to 1.00 million tonnes in the September | ||||||||||
Gold produced | 000'oz | 127.3 | 134.2 | quarter due to Amoanda pit completion ahead of schedule and an | ||||||||
Gold sold | 000'oz | 127.3 | 134.2 | increase in mining at the west end of Damang pit complex (DPC) | ||||||||
Yield | g/t | 1.15 | 1.21 | |||||||||
with a relatively high strip ratio. Total waste tonnes mined | ||||||||||||
AISC - original interpretation | US$/oz | 969 | 958 | |||||||||
increased by 4 per cent from 7.1 million tonnes to 7.4 million | ||||||||||||
AISC - revised interpretation | ||||||||||||
tonnes due to higher productivity at the DPC. Capital waste | ||||||||||||
guidance (WGC November | ||||||||||||
tonnes, included in total waste tonnes, decreased by 31 per cent | ||||||||||||
2018) | US$/oz | 969 | 958 | |||||||||
from 5.8 million tonnes to 4.0 million tonnes due to geotechnical | ||||||||||||
AIC | US$/oz | 969 | 958 | |||||||||
works at the east wall of Damang Pit Cutback. These works | ||||||||||||
Gold production decreased by 5 per cent from 134,200 ounces in | included installation of geotechnical rock fall barriers (fencing) | |||||||||||
which included drilling and installation of base plates, mounting of | ||||||||||||
the June quarter to 127,300 ounces in the September quarter | ||||||||||||
posts and attachment of mesh to the posts. | ||||||||||||
mainly due to lower feed grade in line with the mining plan. | ||||||||||||
Total tonnes mined, including capital waste stripping, increased | Operational waste tonnes mined increased by 162 per cent from | |||||||||||
1.3 million tonnes to 3.4 million tonnes due to high volumes mined | ||||||||||||
by 3 per cent from 23.4 million tonnes in the June quarter to 24.0 | ||||||||||||
from the west end of DPC which has a relatively higher strip ratio. | ||||||||||||
million tonnes in the September quarter. | Ore | tonnes mined | ||||||||||
In the September quarter total tonnes mined at Amoanda pit were | ||||||||||||
decreased by 8 per cent from 4.0 million tonnes to 3.7 million | ||||||||||||
0.1 million tonnes, at Saddle 1.3 million tonnes and at Damang Pit | ||||||||||||
tonnes in line with the plan. | ||||||||||||
Cutback (DPCB) 7.0 million tonnes. | ||||||||||||
Operational waste tonnes mined increased by 6 per cent from 11.5 | Grade mined increased by 1 per cent from 1.57 grams per tonne | |||||||||||
million tonnes to 12.2 million tonnes due to higher operational | ||||||||||||
to 1.59 grams per tonne due to higher grade material mined from | ||||||||||||
waste stripping required | to expose ore in | line | with the plan. | |||||||||
Saddle pit. Gold mined decreased by 24 per cent from 67,500 | ||||||||||||
Capital waste tonnes mined increased by 3 per cent from 7.9 | ||||||||||||
ounces to 51,300 ounces due to lower tonnes mined as a result of | ||||||||||||
million tonnes to 8.1 million tonnes. Mined grade decreased by 3 | ||||||||||||
the end of life of the Amoanda pit. The strip ratio increased from | ||||||||||||
per cent from 1.25 grams per tonne to 1.21 grams per tonne due | ||||||||||||
5.3 to 7.4 due to more waste tonnes mined from the West of DPC. | ||||||||||||
to lower grade ore mined at Akontansi pit. Gold mined decreased | ||||||||||||
by 10 per cent from 159,000 ounces to 143,100 ounces as a result | Tonnes processed decreased by 1 per cent from 1.17 million | |||||||||||
of decreased ore tonnes | and grade mined. | The strip ratio | ||||||||||
tonnes in the June quarter to 1.16 million tonnes in the September | ||||||||||||
increased from 4.9 to 5.5 due to higher stripping at Teberebie pit. | ||||||||||||
quarter. Yield decreased by 8 per cent from 1.46 grams per tonne | ||||||||||||
The CIL plant throughput was similar at 3.4 million tonnes.Yield | to 1.34 grams per tonne due to lower feed grade. The lower feed | |||||||||||
decreased by 5 per cent from 1.21 grams per tonne to 1.15 grams | grade is mainly due to lower stockpile grade fed to supplement | |||||||||||
per tonne mainly due to lower grade ore mined and fed. | ore tonnes mined. In the September quarter, tonnes milled were |
sourced as follows: 0.72 million tonnes at 1.70 grams per tonne | |
Cost of sales before amortisation and depreciation decreased by | from the pits and 0.44 million tonnes at 1.33 grams per tonne from |
stockpiles. This compared with 0.96 million tonnes at 1.68 grams | |
5 per cent from US$87 million to US$83 million mainly due to lower | |
per tonne from the pits and 0.21 million tonnes at 1.53 grams per | |
operational costs and a gold-in-process credit to cost of US$5 | |
tonne from stockpiles in the June quarter. | |
million in both quarters. | |
Capital expenditure decreased by 10 per cent from US$30 million | Cost of sales before amortisation and depreciation increased by |
17 per cent from US$30 million in the June quarter to US$35 | |
to US$27 million due to lower capital waste stripping and timing | |
million in the September quarter, mainly due to higher operating | |
of tailings storage construction. | |
tonnes mined. | |
All-in sustaining costs and total all-in cost increased by 1 per cent | Capital expenditure decreased by 24 per cent from US$25 million |
from US$958 per ounce in the June quarter to US$969 per ounce | |
in the June quarter to US$19 million in the September quarter due | |
in the September quarter due to lower gold sold, partially offset by | |
to lower capital waste tonnes mined. | |
lower cost of sales before amortisation and depreciation and lower | |
capital expenditure. |
Damang
Sept June
2019 2019
Sustaining capital expenditure was similar at US$2 million. Non- sustaining capital expenditure decreased by 26 per cent from US$23 million to US$17 million mainly due to lower capital waste mined.
Gold produced | 000'oz | 49.7 | 54.6 | ||
Gold sold | 000'oz | 49.7 | 54.6 | All-in sustaining costs increased by 25 per cent from US$673 per | |
Yield | g/t | 1.34 | 1.46 | ounce in the June quarter to US$842 per ounce in the September | |
AISC - original interpretation | US$/oz | 842 | 673 | quarter mainly due to lower gold sold and higher cost of sales | |
AISC - revised interpretation | before amortisation and depreciation. | ||||
guidance (WGC November | |||||
2018) | US$/oz | 842 | 673 | All-in costs increased by 8 per cent from US$1,097 per ounce in | |
AIC | US$/oz | 1,185 | 1,097 | ||
the June quarter to US$1,185 per ounce in the September quarter | |||||
Gold production decreased by 9 per cent from 54,600 ounces in | due to lower gold sold and higher cost of sales before amortisation | ||||
and depreciation, partially offset by lower non-sustaining capital | |||||
the June quarter to 49,700 ounces in | the September | quarter | |||
expenditure. | |||||
mainly due to lower yield.
Gold Fields 2019Operating Update September Quarter | 6 |
At the end of the September 2019 quarter, 33 months into the Damang Reinvestment Project (DRP 40m), total material mined amounts to 111 million tonnes, 17 per cent ahead of the project schedule. Gold produced for the same period was 485,930 ounces, 21 per cent above the DRP ounces of 401,230.The project capital spent to date is US$339 million versus the DRP to date of US$300million, largely driven by the additional capital waste tonnes mined.
Asanko (Equity accounted Joint Venture)
Sept | June | ||||||
2019 | 2019 | ||||||
Gold produced | 000'oz | 62.4 | 62.1 | ||||
Gold sold | 000'oz | 63.0 | 66.3 | ||||
Yield | g/t | 1.34 | 1.39 | ||||
AISC - original interpretation | US$/oz | 1,179 | 1,180 | ||||
AISC - revised interpretation | |||||||
guidance (WGC November | |||||||
2018) | US$/oz | 1,179 | 1,180 | ||||
AIC | US$/oz | 1,301 | 1,247 |
All figures in table on a 100 per cent basis
Gold production increased by 1 per cent from 62,100 ounces in the June quarter to 62,400 ounces in the September quarter.
Total tonnes mined decreased by 16 per cent from 8.9 million tonnes in the June quarter to 7.5 million tonnes in the September quarter. Ore tonnes mined was similar at 1.1 million tonnes. Grade mined decreased by 5 per cent from 1.55 grams per tonne in the June quarter to 1.47 grams per tonne in the September quarter.
Total waste tonnes mined decreased by 18 per cent from 7.8 million tonnes in the June quarter to 6.4 million tonnes in the September quarter. The strip ratio decreased by 22 per cent from
7.4 in the June quarter to 5.8 in the September quarter. The decrease in strip ratio and waste tonnes mined in the September quarter was mainly due to waste mining from the Cut 2 pushback at Nkran nearing completion in the September quarter.
Operating waste tonnes mined increased by 46 per cent from 2.8 million tonnes in the June quarter to 4.1 million tonnes in the September quarter. Capital waste tonnes mined decreased by 54 per cent from 5.0 million tonnes in the June quarter to 2.3 million tonnes in the September quarter.
The plant throughput was similar at 1.4 million tonnes. Yield decreased by 4 per cent from 1.39 grams per tonne in the June quarter to 1.34 grams per tonne in the September quarter. In the September quarter, total tonnes processed exceeded the ore tonnes mined. Total tonnes processed included 345,000 tonnes fed from the ROM stockpile at an average grade of 1.35 grams per tonne and 1 094 000 tonnes from the pits at a grade of 1.44 grams per tonne. This compared with 319,000 tonnes that were fed from the ROM stockpile at an average grade of 1.31 grams per tonne and 1 056 000 tonnes from the pits at a grade of 1.55 grams per tonne in the June quarter.
Gold Fields' 45 per cent share of gold produced and gold sold amounted to 28,100 ounces and 28,400 ounces for the September quarter, respectively and 27,900 ounces and 29,900 ounces for the June quarter.
Cost of sales before amortisation and depreciation increased by
13 per cent from US$47 million in the June quarter to US$53 million in the September quarter mainly due to higher operational waste tonnes mined of 1.3 million tonnes in the September quarter.
Capital expenditure decreased by 50 per cent from US$28 million in the June quarter to US$14 million in the September quarter and included deferred stripping of US$20 million and US$10 million, respectively. Capital expenditure decreased due to a decrease in deferred stripping as a result of the Cut 2 pushback at Nkran nearing completion as well as lower expenditure on the tailings storage lift during the September quarter.
Sustaining capital decreased by 54 per cent from US$25 million in the June quarter to US$11 million in the September quarter. Non- sustaining capital was similar at US$3 million.
Gold Fields share of cost of sales before amortisation and depreciation increased by 14 per cent from US$21 million to US$24 million. Gold Fields share of capital expenditure decreased by 54 per cent from US$13 million in the June quarter to US$6 million in the September quarter. Gold Fields share of sustaining capital decreased by 55 per cent from US$11 million in the June quarter to US$5 million in the September quarter. Gold Fields share of non-sustaining capital decreased from US$2 million in the June quarter to US$1 million in the September quarter.
All-in sustaining costs decreased marginally from US$1,180 per ounce in the June quarter to US$1,179 per ounce in the September quarter.
All-in costs increased by 4 per cent from US$1,247 per ounce in the June quarter to US$1,301 per ounce in the September quarter mainly due to lower gold sold and higher cost of sales before amortisation and depreciation, partially offset by lower capital expenditure.
South America region
Peru
Cerro Corona
Sept | June | |||||||
2019 | 2019 | |||||||
Gold produced | 000'oz | 35.0 | 40.9 | |||||
Copper produced | tonnes | 7,488 | 8,357 | |||||
Total equivalent gold produced | 000'eq oz | 64.8 | 80.3 | |||||
Total equivalent gold sold | 000'eq oz | 65.6 | 76.9 | |||||
Yield | - gold | g/t | 0.69 | 0.80 | ||||
- copper | per cent | 0.47 | 0.53 | |||||
- combined | eq g/t | 1.22 | 1.51 | |||||
AISC - original interpretation | US$/oz | 698 | 381 | |||||
AISC | US$/eq oz | 929 | 719 | |||||
AISC - revised interpretation | ||||||||
guidance (WGC November | ||||||||
2018) | US$/oz | 604 | 364 | |||||
US$/eq oz | 877 | 710 | ||||||
AIC | US$/oz | 698 | 381 | |||||
AIC | US$/eq oz | 929 | 719 | |||||
Gold price* | US$/oz | 1,466 | 1,301 | |||||
Copper price* | US$/t | 5,819 | 6,146 |
- Average daily spot price for the period used to calculate total equivalent gold ounces produced.
Gold production decreased by 14 per cent from 40,900 ounces in the June quarter to 35,000 ounces in the September quarter due to lower grades mined and processed and lower recovery. Copper production decreased by 10 per cent from 8,357 tonnes to 7,488 tonnes due to lower grade mined and processed. Equivalent gold production decreased by 19 per cent from 80,300 ounces to 64,800 ounces mainly due to lower grade processed in line with the mining sequence and lower price factor.
Gold head grade decreased by 10 per cent from 1.22 grams per tonne to 1.10 grams per tonne and gold recoveries decreased from 65.7 per cent to 62.8 per cent mainly due to the elevated but
7
Gold Fields 2019Operating Update September Quarter
localised arsenic content. Copper head grade decreased by 8 per cent from 0.59 per cent to 0.54 per cent in line with the mining sequence and copper recoveries decreased from 89.5 per cent to
88.3 per cent. As a result of the above, gold yield decreased by 14 per cent from 0.80 grams per tonne to 0.69 grams per tonne. Copper yield decreased by 11 per cent from 0.53 per cent to 0.47 per cent.
In the September quarter, concentrate with a payable content of 36,372 ounces of gold was sold at an average price of US$1,480 per ounce and 7,475 tonnes of copper was sold at an average price of US$4,948 per tonne, net of treatment and refining charges. This compared with 39,901 ounces of gold that was sold at an average price of US$1,292 per ounce and 8,017 tonnes of copper that was sold at an average price of US$5,289 per tonne, net of treatment and refining charges, in the June quarter.
Total tonnes mined increased by 16 per cent from 5.45 million tonnes in the June quarter to 6.31 million tonnes in the September quarter mainly due to higher ore and waste mined in line with the mining sequence. Ore mined increased by 18 per cent from 1.76 million tonnes to 2.07 million tonnes. Operational waste tonnes mined increased by 15 per cent from 3.69 million tonnes to 4.24 million tonnes in line with the mining plan. The strip ratio decreased from 2.10 to 2.05.
Ore processed was similar at 1.65 million tonnes.
Cost of sales before amortisation and depreciation was similar at US$39 million. The gold-in-process credit to cost of US$2 million in the September quarter compared with a credit to cost of US$1 million in the June quarter due to a higher amount of low grade ore stockpiled in the September quarter.
Capital expenditure increased by 60 per cent from US$10 million to US$16 million due to an increase in construction activities at the tailings dam and waste storage facilities during the dry season.
All-in cost per gold ounce increased by 83 per cent from US$381 per ounce in the June quarter to US$698 per ounce in the September quarter mainly due to higher capital expenditure, lower by-product credit due to lower copper price received and lower gold sold. All-in cost per equivalent ounce increased by 29 per cent from US$719 per equivalent ounce to US$929 per equivalent ounce due to higher capital expenditure and lower equivalent ounces sold.
Australia region
St Ives
Sept | June | |||||||
2019 | 2019 | |||||||
Gold produced | 000'oz | 75.2 | 84.6 | |||||
Gold sold | 000'oz | 78.2 | 90.2 | |||||
Yield | - underground | g/t | 3.35 | 3.44 | ||||
- surface | g/t | 1.58 | 1.80 | |||||
- combined | g/t | 2.19 | 2.28 | |||||
AISC - original interpretation | A$/oz | 1,533 | 1,468 | |||||
US$/oz | 1,050 | 1,029 | ||||||
AISC - revised interpretation | ||||||||
guidance (WGC November | 1,275 | 1,245 | ||||||
2018) | A$/oz | |||||||
US$/oz | 873 | 873 | ||||||
AIC | A$/oz | 1,533 | 1,468 | |||||
US$/oz | 1,050 | 1,029 |
Gold production decreased by 11 per cent from 84,600 ounces in the June quarter to 75,200 ounces in the September quarter due
to reduced ore tonnes processed as a result of a seven-day mill maintenance shutdown as well as lower grades of ore processed.
Total ore tonnes mined increased by 8 per cent from 1.3 million tonnes in the June quarter to 1.4 million tonnes in the September quarter.
Total underground ore tonnes mined decreased by 3 per cent from 311,200 tonnes in the June quarter to 301,800 tonnes in the September quarter. Grade mined increased by 7 per cent from
- grams per tonne to 3.90 grams per tonne and resultant gold mined increased by 4 per cent from 36,500 ounces in the June quarter to 37,800 ounces in the September quarter. In the September quarter tonnes mined were sourced as follows: 243,600 tonnes at 3.9 grams per tonne from Invincible, 54,600 tonnes at 4.1 grams per tonne from Cave Rocks and 3,600 tonnes at 2.2 grams per tonne from Hamlet. This compared with 243,900 tonnes at 3.8 grams per tonne from Invincible, 50,600 tonnes at
- grams per tonne from Cave Rocks and 16,700 tonnes at 2.9 grams per tonne from Hamlet in the June quarter.
At the Hamlet underground operation, mining of the main ore body is winding up with mine activities to be concluded by the end of 2019. Simultaneously the higher-grade Hamlet North ore body is being developed with first production ore expected during the March 2020 quarter. Remnant mining of lower levels at the Cave Rocks underground mine continued in the September quarter with mining activities at Cave Rocks to be concluded by the end of 2019.
Total tonnes mined at the open pits, decreased by 9 per cent from
3.4 million tonnes in the June quarter to 3.1 million tonnes in the September quarter.
At the open pit operations, ore tonnes mined increased by 10 per cent from 1.0 million tonnes in the June quarter to 1.1 million tonnes in the September quarter. Grade mined from open pits
decreased by 5 per cent from 1.67 grams per tonne to 1.59 grams per tonne reflecting the lower grade ore mined from Neptune pit in
the September quarter. Gold mined from the open pits increased by 10 per cent from 51,900 ounces to 56,900 ounces. In the September quarter, tonnes mined were sourced as follows: 0.7 million tonnes at 1.24 grams per tonne from Neptune and 0.4 million tonnes at 2.11 grams per tonne from Invincible. This compared with 0.6 million tonnes at 1.32 grams per tonne from Neptune and 0.4 million tonnes at 2.16 grams per tonne from Invincible in the June quarter.
Operational waste tonnes mined increased by 125 per cent from
0.8 million tonnes in the June quarter to 1.8 million tonnes in the September quarter with Neptune stage 5 moving to operational waste stripping and capital waste tonnes mined decreased by 88 per cent from 1.6 million tonnes to 0.2 million tonnes with lower capital waste mining at Neptune stage 5. The strip ratio decreased from 2.5 to 1.8 with lower waste mining at Neptune.
Ounces mined at the total St Ives complex increased by 7 per cent from 88,300 ounces in the June quarter to 94,700 ounces in the September quarter. At the end of the September quarter, stockpiled Neptune high-grade oxide material amounted to 1,075,800 tonnes at 1.21 grams per tonne, Invincible amounted to
133,300 tonnes at 2.12 grams per tonne and A5 amounted to 173,600 tonnes at 1.41 grams per tonne. This compared with
Neptune high-grade oxide material that amounted to 663,200 tonnes at 1.23 grams per tonne, Invincible that amounted to 191,900 tonnes at 2.91 grams per tonne and A5 that amounted to 174,000 tonnes at 1.46 grams per tonne at the end of the June
Gold Fields 2019Operating Update September Quarter | 8 |
quarter. Currently, Lefroy mill can only sustain a 25 per cent oxide material blend. The excess Neptune oxide material is stockpiled and fed to the mill so as to maintain the optimum blend.
Throughput at the Lefroy mill decreased by 7 per cent from 1.15 million tonnes in the June quarter to 1.07 million tonnes in the September quarter mainly due to a seven-day maintenance shutdown to perform mill relining work. Yield decreased by 4 per cent from 2.28 grams per tonne to 2.19 grams per tonne due to lower grade of ore mined in the blend and approximately 4,000 ounces left within the circuit at the end of the September quarter 2019 which will be produced in the next quarter.
Cost of sales before amortisation and depreciation decreased by
10 per cent from A$87 million (US$62 million) in the June quarter to A$78 million (US$53 million) in the September quarter. The gold inventory credit to cost of A$11 million (US$7 million) in the September quarter compared with a charge to cost of A$7 million (US$5 million) in the June quarter, partially offset by increased mining cost of A$8 million (US$5 million) due to increased ore and operational waste mined at the open pits in the September quarter.
Capital expenditure decreased by 5 per cent from A$37 million (US$26 million) to A$35 million (US$24 million) due to decreased capital development in the September quarter.
All-in cost increased by 4 per cent from A$1,468 per ounce (US$1,029 per ounce) in the June quarter to A$1,533 per ounce (US$1,050 per ounce) in the September quarter due to lower gold sold, partially offset by lower cost of sales before amortisation and depreciation and lower capital expenditure.
Agnew
Sept | June | ||||||
2019 | 2019 | ||||||
Gold produced | 000'oz | 50.4 | 56.4 | ||||
Gold sold | 000'oz | 45.7 | 56.4 | ||||
Yield | g/t | 5.10 | 5.75 | ||||
AISC - original interpretation | A$/oz | 1,756 | 1,747 | ||||
US$/oz | 1,200 | 1,224 | |||||
AISC - revised interpretation | |||||||
guidance (WGC November | 1,548 | 1,402 | |||||
2018) | A$/oz | ||||||
US$/oz | 1,061 | 983 | |||||
AIC | A$/oz | 1,756 | 1,747 | ||||
US$/oz | 1,200 | 1,224 |
Gold production decreased by 11 per cent from 56,400 ounces in the June quarter to 50,400 ounces in the September quarter due to lower grades mined and processed.
Ore mined from underground increased by 20 per cent from 299,100 tonnes in the June quarter to 360,200 tonnes in the September quarter. Mined grade decreased by 23 per cent from
6.38 grams per tonnes to 4.90 grams per tonne due to increased material mined from the lower grade portion of Waroonga North area.
Deteriorating ground conditions in the FBH ore body during the June quarter 2019, precipitated a change in mining plans to expand production from the Waroonga North ore body. Certain areas of the Waroonga North area ore body were associated with lower grades which had the effect of reducing the overall mining grades. Due to the FBH conditions, the mining rate of FBH slowed down with additional development to allow 'just in time' stoping activities.
The delay in FBH and the resequencing of Waroonga North had a negative impact on the September quarter ounce production. Additional development was also undertaken at New Holland to assist in opening up additional mining fronts.
Gold mined decreased by 8 per cent from 61,300 ounces in the June quarter to 56,700 ounces in the September quarter. In the September quarter tonnes mined were sourced as follows: 206,800 tonnes at 5.7 grams per tonne from Waroonga and 153,400 tonnes at 3.8 grams per tonne from New Holland. This compared with 168,200 tonnes at 8.2 grams per tonne from Waroonga and 130,900 tonnes at 4.0 grams per tonne from New Holland in the June quarter. The decline in the Waroonga grade is mainly due to lower grade and ore tonnes from the Bengal ore body in line with the mining sequence and due to lower grades in the early stages of Waroonga North.
Tonnes processed increased by 1 per cent from 304,600 tonnes in the June quarter to 307,000 tonnes in the September quarter. The combined yield decreased by 11 per cent from 5.75 grams per tonne to 5.10 grams per tonne due to lower grade ore mined.
Cost of sales before amortisation and depreciation decreased by
- per cent from A$56 million (US$39 million) in the June quarter to A$53 million (US$36 million) in the September quarter. The decrease was due to a gold inventory credit to cost of A$10 million (US$7 million) in the September quarter compared with A$2 million (US$2 million) in the June quarter and a decrease of A$2 million (US$1 million) in the cost of employee accommodation following the commissioning of the new accommodation village on site. These decreases were partially offset by an increase in mining cost of A$6 million (US$4 million) due to increased ore mined.
Capital expenditure decreased by 38 per cent from A$37 million (US$26 million) to A$23 million (US$15 million) mainly due to the completion of the new accommodation village and lower capital development at Waroonga in the September quarter.
All-in cost increased by 1 per cent from A$1,747 per ounce (US$1,224 per ounce) in the June quarter to A$1,756 per ounce (US$1,200 per ounce) in the September quarter due to lower gold sold, partially offset by lower cost of sales before amortisation and depreciation and lower capital expenditure.
Granny Smith
Sept | June | ||||||
2019 | 2019 | ||||||
Gold produced | 000'oz | 69.7 | 64.7 | ||||
Gold sold | 000'oz | 69.8 | 64.8 | ||||
Yield | g/t | 4.67 | 4.79 | ||||
AISC - original interpretation | A$/oz | 1,347 | 1,335 | ||||
US$/oz | 927 | 936 | |||||
AISC - revised interpretation | |||||||
guidance (WGC November | 1,109 | 1,085 | |||||
2018) | A$/oz | ||||||
US$/oz | 763 | 760 | |||||
AIC | A$/oz | 1,347 | 1,335 | ||||
US$/oz | 927 | 936 |
Gold production increased by 8 per cent from 64,700 ounces in the June quarter to 69,700 ounces in the September quarter mainly due to increased ore processed.
Ore mined from underground increased by 6 per cent from 425,600 tonnes to 450,900 tonnes due to increased ore development in the September quarter resulting in increased flexibility and availability of production stoping fronts. Grade mined decreased by 1 per cent from 5.16 grams per tonne in the
9
Gold Fields 2019Operating Update September Quarter
June quarter to 5.12 grams per tonne in the September quarter in line with the mining sequence. As a result, overall ounces mined increased by 5 per cent from 70,700 ounces in the June quarter to 74,300 ounces in the September quarter.
Tonnes processed increased by 11 per cent from 419,900 tonnes in the June quarter to 464,100 tonnes in the September quarter due to increased ore availability. The yield decreased by 3 per cent from 4.79 grams per tonne to 4.67 grams per tonne due to lower grade mined.
Cost of sales before amortisation and depreciation increased by
11 per cent from A$53 million (US$38 million) in the June quarter to A$59 million (US$41 million) in the September quarter due to increased ore tonnes mined and a major relining of the SAG Mill in the September quarter.
Capital expenditure increased by 4 per cent from A$25 million (US$17 million) in the June quarter to A$26 million (US$18 million) in the September quarter mainly due to increased exploration expenditure.
All-in cost increased by 1 per cent from A$1,335 per ounce (US$936 per ounce) in the June quarter to A$1,347 per ounce (US$927 per ounce) in the September quarter due to higher cost of sales before amortisation and depreciation and higher capital expenditure, partially offset by and higher gold sold.
Gruyere
Sept | June | ||||||
2019 | 2019 | ||||||
Gold produced | 000'oz | 29.1 | - | ||||
Gold sold* | 000'oz | 28.6 | - | ||||
Yield | g/t | 0.82 | - |
All figures in table on a 100 per cent basis
* Gold sold was credited to capital prior to commercial levels of production being achieved
Gold production commenced in the September quarter with 29,100 ounces produced in the September quarter. Approximately 3,000 ounces were left within the circuit and will be produced in the next quarter. Commercial levels of production were achieved at the end of the September quarter.
Commissioning of the final components at the process plant was achieved in the September quarter with the SAG and ball mills operating steadily. Plant availability for the September quarter was at 73.4 per cent (82.4 per cent for the September month), while the percentage of nameplate capacity (8.2 million tonnes per annum) achieved for the September quarter was 55.6 per cent (75 per cent in the September month).
The final forecast capital cost (FFC) is estimated at A$607 million (level of accuracy range + 1 per cent/-1 per cent).
In accordance with the Joint Venture agreement entered into at the time of the acquisition, Gold Fields will fund up to 10 per cent of costs overruns, excluding scope changes and force majeure costs. Consequently, Gold Fields share of the estimated FFC of A$607 million (+/- 1 per cent) is approximately A$329 million. This has all been incurred by the end of September 2019.
Ore mined from the Gruyere open pit increased by 24 per cent from 1.7 million tonnes in the June quarter to 2.1 million tonnes in the September quarter with additional low-grade material of 400,000 tonnes mined within the pit shell contributing to the ore tonnes and grade. Grade mined increased by 5 per cent from 0.84 grams per tonne in the June quarter to 0.88 grams per tonne in the
September quarter and resultant ounces mined increased by 30 per cent from 46,000 ounces in the June quarter to 59,700 ounces in the September quarter.
Grade control drilling has identified additional ore above the cutoff grade but below the average life of mine grade. This additional ore is still within the existing pit shell and would otherwise be categorised as waste. The strategy is to stockpile the lower grade ore above the cut-off grade and to preferentially process the high- grade ore.
At the end of the September quarter stockpiled material amounted to 84,100 ounces (3.3 million tonnes at 0.79 grams per tonne) compared with 64,000 ounces (2.5 million tonnes at 0.82 grams per tonne) in the June quarter.
Ore tonnes processed in the September quarter were 1.1 million tonnes and yield was at 0.82 grams per tonne with total production of 29,100 ounces. The reduced yield was due to preferential treatment of low grade ore during the start-up in order to test the integrity of the circuit as well as building up a baseline of gold-in- circuit.
Gold Fields 2019Operating Update September Quarter | 10 |
UNDERGROUND AND SURFACE
United States Dollars
Imperial ounces with metric tonnes and grade
Total Mine | South | West | ||
Operations | Africa | Africa | ||
Including | Region | Region | ||
Equity | Ghana | |||
accounted | ||||
South | Asanko | |||
Joint | Total | Tarkwa Damang | ||
Venture | Deep | 45% | ||
South |
America |
Region |
Peru |
Cerro
Corona
Australia
Region
Australia | ||||
Total | St Ives | Agnew/ | Granny | Gruyere |
Lawlers | Smith | 50% |
Tonnes mined | Sept 2019 | 1,441 | 328 | - | - | - | - | 1,113 | 302 | 360 | 451 | - | |
(000 tonnes)* | June 2019 | 1,290 | 254 | - | - | - | - | - | 1,036 | 311 | 299 | 426 | - |
- underground ore | Sept 2018 | 1,314 | 277 | - | - | - | - | - | 1,037 | 275 | 302 | 461 | - |
Sept 2019 | 572 | 11 | - | - | - | - | - | 561 | 225 | 161 | 175 | - | |
- underground waste | June 2019 | 623 | 16 | - | - | - | - | - | 607 | 217 | 214 | 175 | - |
Sept 2018 | 42 | 42 | - | - | - | - | - | - | - | - | - | - | |
Sept 2019 | 9,403 | - | 5,163 | 3,666 | 1,000 | 497 | 2,070 | 2,170 | 1,115 | - | - | 1,055 | |
- surface ore | June 2019 | 9,341 | - | 5,766 | 3,951 | 1,340 | 475 | 1,760 | 1,815 | 966 | - | - | 849 |
Sept 2018 | 7,645 | - | 5,352 | 3,511 | 1,317 | 525 | 1741 | 552 | 552 | - | - | - | |
Sept 2019 | 11,416 | 339 | 5,163 | 3,666 | 1,000 | 497 | 2,070 | 3,844 | 1,642 | 521 | 626 | 1,055 | |
- total | June 2019 | 11,254 | 270 | 5,766 | 3,951 | 1,340 | 475 | 1,760 | 3,458 | 1,494 | 513 | 601 | 849 |
Sept 2018 | 9,000 | 319 | 5,352 | 3,511 | 1,317 | 525 | 1,741 | 1,589 | 827 | 302 | 461 | - | |
Grade mined | Sept 2019 | 4.9 | 5.7 | - | - | - | - | - | 4.7 | 3.9 | 4.9 | 5.1 | - |
(grams per tonne) | June 2019 | 5.3 | 6.3 | - | - | - | - | - | 5.1 | 3.6 | 6.4 | 5.2 | - |
- underground ore | Sept 2018 | 5.6 | 6.1 | - | - | - | - | - | 5.3 | 3.9 | 7.0 | 4.9 | - |
Sept 2019 | - | - | - | - | - | - | - | - | - | - | - | - | |
- underground waste | June 2019 | - | - | - | - | - | - | - | - | - | - | - | - |
Sept 2018 | - | - | - | - | - | - | - | - | - | - | - | - | |
Sept 2019 | 1.2 | - | 1.3 | 1.2 | 1.6 | 1.5 | 1.0 | 1.2 | 1.6 | - | - | 0.9 | |
- surface ore | June 2019 | 1.3 | - | 1.3 | 1.3 | 1.6 | 1.6 | 1.2 | 1.3 | 1.7 | - | - | 0.8 |
Sept 2018 | 1.4 | - | 1.4 | 1.2 | 1.7 | 1.5 | 1.1 | 2.3 | 2.3 | - | - | - | |
Sept 2019 | 1.6 | 5.5 | 1.3 | 1.2 | 1.6 | 1.5 | 1.0 | 2.4 | 2.1 | 4.9 | 5.1 | 0.9 | |
- total | June 2019 | 1.8 | 5.9 | 1.3 | 1.3 | 1.6 | 1.6 | 1.2 | 2.7 | 2.2 | 6.4 | 5.2 | 0.8 |
Sept 2018 | 2.0 | 5.3 | 1.4 | 1.2 | 1.7 | 1.5 | 1.1 | 4.3 | 2.9 | 7.0 | 4.9 | - | |
Gold mined | Sept 2019 | 229.0 | 60.2 | - | - | - | - | - | 168.8 | 37.8 | 56.7 | 74.3 | - |
(000 ounces)* | June 2019 | 219.8 | 51.3 | - | - | - | - | - | 168.5 | 36.5 | 61.3 | 70.7 | - |
- underground ore | Sept 2018 | 230.2 | 54.6 | - | - | - | - | - | 175.6 | 34.8 | 67.7 | 73.2 | - |
Sept 2019 | - | - | - | - | - | - | - | - | - | - | - | - | |
- underground waste | June 2019 | - | - | - | - | - | - | - | - | - | - | - | - |
Sept 2018 | - | - | - | - | - | - | - | - | - | - | - | - | |
Sept 2019 | 371.3 | - | 217.8 | 143.1 | 51.3 | 23.5 | 66.8 | 86.7 | 56.9 | - | - | 29.8 | |
- surface ore | June 2019 | 391.5 | - | 250.2 | 159.0 | 67.5 | 23.7 | 66.4 | 74.9 | 51.9 | - | - | 23.0 |
Sept 2018 | 339.6 | 0.4 | 233.7 | 136.4 | 72.7 | 24.7 | 64.0 | 41.6 | 41.6 | - | - | - | |
Sept 2019 | 600.3 | 60.2 | 217.8 | 143.1 | 51.3 | 23.5 | 66.8 | 255.5 | 94.7 | 56.7 | 74.3 | 29.8 | |
- total | June 2019 | 611.2 | 51.3 | 250.2 | 159.0 | 67.5 | 23.7 | 66.4 | 243.3 | 88.3 | 61.3 | 70.7 | 23.0 |
Sept 2018 | 569.9 | 54.9 | 233.7 | 136.4 | 72.7 | 24.7 | 64.0 | 217.3 | 76.5 | 67.7 | 73.2 | - | |
Ore milled/treated | Sept 2019 | 1,458 | 321 | - | - | - | - | - | 1,137 | 366 | 307 | 464 | - |
(000 tonnes) | June 2019 | 1,331 | 269 | - | - | - | - | - | 1,062 | 338 | 305 | 420 | - |
- underground ore | Sept 2018 | 1,264 | 271 | - | - | - | - | - | 993 | 204 | 310 | 479 | - |
Sept 2019 | 7 | 7 | - | - | - | - | - | - | - | - | - | - | |
- underground waste | June 2019 | 11 | 11 | - | - | - | - | - | - | - | - | - | - |
Sept 2018 | 42 | 42 | - | - | - | - | - | - | - | - | - | - | |
Sept 2019 | 8,384 | 234 | 5,242 | 3,437 | 1,158 | 648 | 1,648 | 1,259 | 704 | - | - | 555 | |
- surface ore | June 2019 | 7,753 | 1 | 5,227 | 3,441 | 1,167 | 619 | 1,652 | 873 | 815 | - | - | 58 |
Sept 2018 | 7,572 | 73 | 4,914 | 3,450 | 1,077 | 387 | 1,712 | 873 | 873 | - | - | - | |
Sept 2019 | 9,850 | 563 | 5,242 | 3,437 | 1,158 | 648 | 1,648 | 2,396 | 1,070 | 307 | 464 | 555 | |
- total | June 2019 | 9,095 | 282 | 5,227 | 3,441 | 1,167 | 619 | 1,652 | 1,935 | 1,152 | 305 | 420 | 58 |
Sept 2018 | 8,878 | 387 | 4,914 | 3,450 | 1,077 | 387 | 1,712 | 1,866 | 1,077 | 310 | 479 | - | |
Yield | Sept 2019 | 4.7 | 5.8 | - | - | - | - | - | 4.4 | 3.3 | 5.1 | 4.7 | - |
(grams per tonne) | June 2019 | 5.0 | 6.6 | - | - | - | - | - | 4.6 | 3.4 | 5.8 | 4.8 | - |
- underground ore | Sept 2018 | 4.9 | 5.6 | - | - | - | - | - | 4.9 | 3.7 | 6.2 | 4.7 | - |
Sept 2019 | - | - | - | - | - | - | - | - | - | - | - | - | |
- underground waste | June 2019 | - | - | - | - | - | - | - | - | - | - | - | - |
Sept 2018 | - | - | - | - | - | - | - | - | - | - | - | - | |
Sept 2019 | 1.2 | 0.2 | 1.2 | 1.2 | 1.3 | 1.3 | 1.2 | 1.2 | 1.6 | - | - | 0.8 | |
- surface ore | June 2019 | 1.4 | 4.0 | 1.3 | 1.2 | 1.5 | 1.4 | 1.5 | 1.7 | 1.8 | - | - | - |
Sept 2018 | 1.5 | 0.1 | 1.2 | 1.1 | 1.6 | 1.4 | 1.5 | 2.3 | 2.3 | - | - | - | |
Sept 2019 | 1.7 | 3.4 | 1.2 | 1.2 | 1.3 | 1.3 | 1.2 | 2.7 | 2.2 | 5.1 | 4.7 | 0.8 | |
- combined | June 2019 | 1.9 | 6.3 | 1.3 | 1.2 | 1.5 | 1.4 | 1.5 | 3.3 | 2.3 | 5.8 | 4.8 | - |
Sept 2018 | 2.0 | 4.0 | 1.2 | 1.1 | 1.6 | 1.4 | 1.5 | 3.7 | 2.6 | 6.2 | 4.7 | - | |
Gold produced | Sept 2019 | 219.2 | 59.7 | - | - | - | - | - | 159.5 | 39.4 | 50.4 | 69.7 | - |
(000 ounces) | June 2019 | 215.5 | 57.1 | - | - | - | - | - | 158.4 | 37.3 | 56.4 | 64.7 | - |
- underground ore | Sept 2018 | 207.1 | 49.2 | - | - | - | - | - | 157.9 | 24.5 | 61.3 | 72.1 | - |
Sept 2019 | - | - | - | - | - | - | - | - | - | - | - | - | |
- underground waste | June 2019 | - | - | - | - | - | - | - | - | - | - | - | - |
Sept 2018 | - | - | - | - | - | - | - | - | - | - | - | - | |
Sept 2019 | 321.5 | 1.3 | 205.1 | 127.3 | 49.7 | 28.1 | 64.8 | 50.3 | 35.7 | - | - | 14.6 | |
- surface ore | June 2019 | 344.4 | 0.2 | 216.7 | 134.2 | 54.6 | 27.9 | 80.3 | 47.2 | 47.2 | - | - | - |
Sept 2018 | 343.8 | 0.3 | 195.5 | 126.5 | 51.3 | 17.6 | 83.2 | 64.7 | 64.7 | - | - | - | |
Sept 2019 | 540.7 | 61.0 | 205.1 | 127.3 | 49.7 | 28.1 | 64.8 | 209.8 | 75.2 | 50.4 | 69.7 | 14.6 | |
- total | June 2019 | 559.9 | 57.3 | 216.7 | 134.2 | 54.6 | 27.9 | 80.3 | 205.6 | 84.6 | 56.4 | 64.7 | - |
Sept 2018 | 550.7 | 49.5 | 195.5 | 126.5 | 51.3 | 17.6 | 83.2 | 222.6 | 89.2 | 61.3 | 72.1 | - | |
Cost of sales before gold | |||||||||||||
inventory change and | |||||||||||||
amortisation and | |||||||||||||
depreciation | Sept 2019 | 125 | 204 | - | - | - | - | - | 103 | 90 | 140 | 88 | - |
(dollar per tonne) | June 2019 | 130 | 222 | - | - | - | - | - | 106 | 98 | 135 | 90 | - |
- underground | Sept 2018 | 131 | 221 | - | - | - | - | - | 86 | 30 | 122 | 87 | - |
Sept 2019 | 28 | 2 | 29 | 25 | 34 | 35 | 25 | 39 | 39 | - | - | - | |
- surface | June 2019 | 26 | 71 | 27 | 26 | 28 | 32 | 24 | 26 | 28 | - | - | - |
Sept 2018 | 26 | 2 | 26 | 21 | 34 | 41 | 23 | 47 | 47 | - | - | - | |
Sept 2019 | 43 | 120 | 29 | 25 | 34 | 35 | 25 | 78 | 57 | 140 | 88 | - | |
- total | June 2019 | 42 | 222 | 27 | 26 | 28 | 32 | 24 | 70 | 49 | 135 | 90 | - |
Sept 2018 | 41 | 178 | 26 | 21 | 34 | 41 | 23 | 68 | 43 | 122 | 87 | - |
* Excludes surface material at South Deep.
11
Gold Fields 2019Operating Update September Quarter
CERTAIN FORWARD LOOKING STATEMENTS
This report contains forward-looking statements within the meaning of Section 27A of the U.S. Securities Act of 1933, as amended, or the Securities Act, and Section 21E of the U.S. Securities Exchange Act of 1934, as amended, or the Exchange Act, with respect to Gold Fields' financial condition, results of operations, business strategies, operating efficiencies, competitive position, growth opportunities for existing services, plans and objectives of management, markets for stock and other matters. Such forward-looking statements can be identified by the use of forward-looking terminology, including the terms "believes", "estimates", "plans", "anticipates", "aims", "continues", "expects", "hopes", "may", "will", "would" or "could" or, in each case, their negative or other various or comparable terminology.
These forward-looking statements, including, among others, those relating to the future business prospects, revenues and income of Gold Fields, wherever they may occur in this report, are necessarily estimates reflecting the best judgment of the senior management of Gold Fields and involve a number of risks and uncertainties that could cause actual results to differ materially from those suggested by the forward-looking statements. As a consequence, these forward-looking statements should be considered in light of various important factors, including those set forth in this report. Important factors that could cause actual results to differ materially from estimates or projections contained in the forward-looking statements include, without limitation:
- overall economic and business conditions in South Africa, Ghana, Australia, Peru and elsewhere;
- changes in assumptions underlying Gold Fields' mineral reserve estimates;
- the ability of the Group to achieve anticipated efficiencies and other cost savings in connection with past and future acquisitions or joint ventures;
- the ability of the Group to achieve anticipated efficiencies and other cost savings as a result of measures such as retrenchments;
- the ability of the Group to achieve anticipated production cost estimates at existing operations, projects or joint ventures as outlined in this report or as otherwise disclosed;
- the success of the Group's business strategy, development activities and other initiatives;
- the ability of the Group to comply with requirements that it operate in a sustainable manner and provide benefits to affected communities;
- decreases in the market price of gold or copper;
- the occurrence of hazards associated with underground and surface gold mining or contagious diseases at Gold Fields' operations, projects or joint ventures;
- the occurrence of work stoppages related to health and safety incidents at Gold Fields' operations, projects or joint ventures;
- the Group's loss of senior management or inability to hire or retain employees;
- fluctuations in exchange rates, currency devaluations and othermacro-economic monetary policies;
- ongoing or future labour disruptions and industrial actions at Gold Fields' operations, projects or joint ventures;
- power cost increases as well as power stoppages, fluctuations and usage constraints;
- supply chain shortages and increases in the prices of production imports;
- the ability to manage and maintain access to current and future sources of liquidity, capital and credit, including the terms and conditions of Gold Fields' facilities and Gold Fields' overall cost of funding;
- the adequacy of the Group's insurance coverage;
- the manner, amount and timing of capital expenditures made by Gold Fields on both existing and new mines, mining projects, exploration project or other initiatives;
- changes in relevant government regulations, particularly labour, environmental, tax, royalty, health and safety, water, regulations and potential new legislation affecting Gold Fields' mining and mineral rights;
- fraud, bribery or corruption at Gold Fields' operations, projects or joint ventures that leads to censure, penalties or negative reputational impacts; and
- political instability in South Africa, Ghana, Peru or regionally in Africa or South America.
Gold Fields undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after the date of this report or to reflect the occurrence of unanticipated events.
Gold Fields 2019Operating Update September Quarter | 12 |
ADMINISTRATION AND CORPORATE INFORMATION
Corporate Secretary
Taryn Harmse
Tel: +27 11 562 9719
Fax: +27 11 562 9829
e-mail: taryn.harmse@goldfields.com
Gold Fields Limited
Incorporated in the Republic of South Africa Registration number 1968/004880/06 Share code: GFI
Issuer code: GOGOF ISIN - ZAE 000018123
Registered office
Johannesburg Gold Fields Limited 150 Helen Road Sandown Sandton
2196
Postnet Suite 252 Private Bag X30500 Houghton
2041
Tel: +27 11 562 9700
Fax: +27 11 562 9829
Office of the United Kingdom secretaries
London
St James's Corporate Services Limited
Suite 31, Second Floor
107 Cheapside London EC2V 6DN United Kingdom
Tel: +44 20 7796 8644
Fax: +44 20 7796 8645
e-mail: general@corpserv.co.uk
American depository receipts transfer agent
Shareholder correspondence should be mailed to: BNY Mellon Shareowner Services
P O Box 30170
College Station, TX 77842-3170
Overnight correspondence should be sent to: BNY Mellon Shareowner Services
211 Quality Circle, Suite 210 College Station, TX 77845
e-mail: shrrelations@cpushareownerservices.com
Phone numbers
Tel: 888 269 2377 Domestic
Tel: 201 680 6825 Foreign
Sponsor
J.P. Morgan Equities South Africa (Pty) Ltd
Investor enquiries
Avishkar Nagaser
Tel: +27 11 562 9775
Mobile: +27 82 312 8692
e-mail: avishkar.nagaser@goldfields.com
Thomas Mengel Tel: +27 11 562 9849 Mobile: +27 72 493 5170
e-mail: thomas.mengel@goldfields.com
Media enquiries
Sven Lunsche
Tel: +27 11 562 9763
Mobile: +27 83 260 9279
e-mail: sven.lunsche@goldfields.com
Transfer secretaries
South Africa
Computershare Investor Services (Proprietary) Limited Rosebank Towers
15 Biermann Avenue Rosebank Johannesburg 2196
P O Box 61051
Marshalltown 2107
Tel: +27 11 370 5000
Fax: +27 11 688 5248
United Kingdom
Link Asset Services The Registry
34 Beckenham Road Beckenham
Kent BR3 4TU England
Tel: 0871 664 0300
Calls cost 12p per minute plus your phone company's access charge.
If you are outside the United Kingdom, please call +44 371 664 0300.
Calls outside the United Kingdom will be charged at the applicable international rate.
The helpline is open between 9:00am - 5:30pm. Monday to Friday excluding public holidays in England and Wales. e-mail:enquires@linkgroup.co.uk
Website | |
WWW.GOLDFIELDS.COM | |
Listings | |
JSE / NYSE / GFI | |
SWX: GOLI | |
CA Carolus° (Chair) | RP Menell° (Deputy Chair) NJ Holland*●(Chief Executive Officer) PA Schmidt●(Chief Financial Officer) |
A Andani#° | PJ Bacchus° TP Goodlace° C Lettonˆ° P Mahanyele-Dabengwa●SP Reidˆ° YGH Suleman° |
ˆ Australian * British #Ghanaian | |
° Independent Director ●Non-independent Director |
Attachments
- Original document
- Permalink
Disclaimer
Gold Fields Ltd. published this content on 08 November 2019 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 08 November 2019 14:29:06 UTC