The program which was commenced on
BK1-46-22 - 51.2m (from 42.2m) at 22.61%, including 21m (from 43.7m) at 30.09%, and including 12.1m (from 75.3m) at 28.52%
BK1-47-22 - 45.95m (from 66.05m) at 17.58%, including 9.05m (from 67.55m) at 26.26%, and including 10.5m (from 100.7m) at 29.96%
BK1-50-22 - 36.1m (from 72.9m) at 18.46%, including 10.5m (from 75.9m) at 31.73%
BK1-51-22 - 62m (from 47m) at 16.37%, including 9m (from 48.5m) at 29.71%, and including 12m (from 69.5m) at 27.68%
BK1-52-22 - 58m (from 50m) at 11.44%, including 9m (from 51.5m) at 28.85%
BK1-54-22 - 42.5m (from 43m) at 14.74% including 13m (from 44.5m) at 24.07%
BK1-55-22 - 46.5m (from 56m) at 21.97% including 19.5m (from 80m) at 35.52%
Table1: Summary of Zone 1 graphite enrichment intersections
Hole ID | From (m) | To (m) | Interval (m) | Grade (% TCG) | Cut Off |
BK1-46-22 | 9 | 9.74 | 0.74 | 21.91 | |
and | 10.19 | 11.05 | 0.86 | 16.86 | |
and | 11.28 | 12.24 | 0.96 | 16.56 | |
and | 17.7 | 18.95 | 1.25 | 5.14 | |
and | 30.67 | 32.32 | 1.65 | 20.00 | |
and | 37.1 | 39.5 | 2.40 | 20.80 | |
and | 42.2 | 93.4 | 51.20 | 22.61 | |
including | 42.2 | 63.2 | 21.00 | 30.09 | 20% |
and including | 75.3 | 87.4 | 12.10 | 28.52 | 20% |
BK1-47-22 | 8.6 | 14.6 | 6.00 | 27.77 | |
and | 36.55 | 39.84 | 3.29 | 7.21 | |
and | 42.84 | 44.85 | 2.01 | 9.68 | |
and | 66.05 | 112 | 45.95 | 17.58 | |
including | 66.05 | 75.1 | 9.05 | 26.26 | 20% |
and including | 100.7 | 111.2 | 10.50 | 29.96 | 20% |
BK1-48-22 | 84.2 | 85.56 | 1.36 | 6.12 | |
and | 98.3 | 100.2 | 1.90 | 29.64 | 20% |
and | 109.5 | 112.5 | 3.00 | 4.27 | |
BK1-49-22 | 4.7 | 7 | 2.30 | 12.73 | |
and | 13.7 | 14.15 | 0.45 | 1.16 | |
and | 22.6 | 24.65 | 2.05 | 1.45 | |
and | 33.2 | 33.8 | 0.60 | 6.22 | |
and | 48.38 | 48.9 | 0.52 | 9.01 | |
BK1-50-22 | 7.32 | 7.58 | 0.26 | 16.90 | |
and | 72.9 | 109 | 36.10 | 18.46 | |
and including | 75.9 | 86.4 | 10.50 | 31.73 | 20% |
BK1-51-22 | 9.7 | 11.4 | 1.70 | 32.68 | 20% |
and | 47 | 109 | 62.00 | 16.37 | |
including | 47 | 56 | 9.00 | 29.71 | |
and including | 69.5 | 81.5 | 12.00 | 27.68 | |
BK1-52-22 | 14.5 | 45 | 30.50 | 8.02 | |
and | 50 | 108 | 58.00 | 11.44 | |
including | 51.5 | 60.5 | 9.00 | 28.85 | 20% |
BK1-53-22 | 21.5 | 26 | 4.50 | 1.76 | |
and | 35.5 | 37.5 | 2.00 | 2.69 | |
and | 43 | 89 | 46.00 | 8.72 | |
and | 99.5 | 102.5 | 3.00 | 14.19 | |
BK1-54-22 | 19.5 | 25.5 | 6.00 | 1.80 | |
and | 43 | 85.5 | 42.50 | 14.74 | |
including | 43 | 56 | 13.00 | 24.07 | 20% |
and | 95 | 96 | 1.00 | 3.75 | |
and | 108 | 109 | 1.00 | 10.40 | |
BK1-55-22 | 8.25 | 10.75 | 2.50 | 4.98 | |
and | 28.75 | 29.3 | 0.55 | 31.60 | 20% |
and | 56 | 102.5 | 46.50 | 21.97 | |
including | 80 | 99.5 | 19.50 | 35.52 | 20% |
BK1-56-22 | 18 | 21 | 3.00 | 7.28 | |
and | 77 | 81 | 4.00 | 4.80 | |
and | 92 | 96 | 4.00 | 10.78 |
The above intervals are drilling lengths, not true widths, because the true orientation of the enrichment horizons is highly deformed and folded and has not yet accurately been established.
The infill drilling focused on the core of the syncline at the west of the deposit area, infilling at the ‘nose’ of the syncline continued to produce wide intersection in, and adjacent to areas of known graphite enrichment. Step out drilling along the southern limb of the of the interpreted fold structure was completed and graphite enrichment encountered suggest additional structural controls disrupt the continuity of the enrichment horizon to the east. This distribution is broadly coincident with the magnetic anomaly.
QA / QC Comments
A total of 347 diamond drill core samples of ½ cut core were collected, individual sample lengths vary from 0.3 to 1.50 m depending upon geological and mineralogical constraints. Every tenth sample was submitted as a standard, blank, or duplicate. The standard used was OREAS 723; a certified reference material containing 5.87% TGC (Total Graphitic Carbon).
Samples were delivered to MSALABS in
All sub-sample pulps were analysed for both Total Carbon + Total Sulphur (SPM-512) and
Click Image To View Full Size
Figure 1: Zone 1 Drill hole locations and down-hole traces.
Table2: Summary of drill hole locations and down hole specifications.
HOLE-ID | EASTING | NORTHING | ELEVATION | LENGTH | AZIMUTH | DIP |
(UTM NAD 83) | (UTM NAD 83) | (m AMSL) | (m) | (degree) | (degree) | |
BK1-46-22 | 493189 | 5655689 | 626 | 100 | 0/360 | -65 |
BK1-47-22 | 493117 | 5655668 | 665 | 112 | 0/360 | -50 |
BK1-48-22 | 493285 | 5655688 | 656 | 121 | 0/360 | -50 |
BK1-49-22 | 493384 | 5655742 | 637 | 109 | 0/360 | -50 |
BK1-50-22 | 493074 | 5655677 | 662 | 109 | 0/360 | -50 |
BK1-51-22 | 493074 | 5655677 | 662 | 109 | 0/360 | -75 |
BK1-52-22 | 493019 | 5655699 | 651 | 109 | 45 | -50 |
BK1-53-22 | 493025 | 5655694 | 631 | 110 | 60 | -70 |
BK1-54-22 | 493063 | 5655711 | 641 | 55 | 0/360 | -75 |
BK1-55-22 | 493153 | 5655671 | 642 | 109 | 0/360 | 50 |
BK1-56-22 | 493239 | 5655684 | 659 | 109 | 0/360 | -50 |
About the
The current mineral resource at the
Table3: In-pit Resource at
Click Image To View Full Size
The mineral resource estimates above are described in the technical report entitled, NI 43-101 Technical Report Mineral Resource Estimate on the Lac Gueret South Graphite Property,
https://greenbatteryminerals.com/wp-content/uploads/ReportFINAL_compressed.pdf
Qualified Person:
About the Company:
On Behalf of the Board of Directors
‘Thomas Yingling‘
President, CEO & Director
FOR MORE INFORMATION, PLEASE CONTACT:
Investor Relations:
or 1-604-343-7740
info@greenbatteryminerals.com www.greenbatteryminerals.com
Disclaimer for Forward-Looking Information:
Certain statements in this document which are not purely historical are forward-looking statements, including any statements regarding beliefs, plans, expectations or intentions regarding the future. Forward looking statements in this news release include that the Company will carry out the drill program described in this news release, conduct the Offering and expend funds on
Neither
Copyright (c) 2022 TheNewswire - All rights reserved.
Copyright (c) 2022 TheNewswire - All rights reserved., source