As part of this order, GTT will design the tanks of the vessels, which will each offer a capacity of 174,000 m3. The LNGC tanks will be fitted with the GTTMark III Flexmembrane containment system.
Deliveries of the vessels will take place between late 2024 and early 2025.
Media contact:
press@gtt.fr
Investor Relations contact:
information-financiere@gtt.fr/ + 33 (0)1 30 23 20 87
>Download in .pdf
[1]Liquefied Natural Gas Carrier
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
GTT – Gaztransport & Technigaz SA published this content on 14 December 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 14 December 2021 17:37:05 UTC.