Make The World

More Sustainable

[Provisional Translation Only]

This English translation of the original Japanese document is provided solely for information purposes. Should there be any discrepancies between this translation and the Japanese original, the latter shall prevail.

April 5, 2021

Issuer

Ichigo Green Infrastructure Investment Corporation ("Ichigo Green," 9282) 1-1-1Uchisaiwaicho, Chiyoda-ku,Tokyo

Representative: Mami Nagasaki, Executive Director

www.ichigo-green.co.jp/en

Asset Management Company

Ichigo Investment Advisors Co., Ltd.

Representative: Hiroshi Iwai, President

Inquiries: Takao Nitta, Head of Ichigo Green

Tel: +81-3-3502-4854

Solar Power Generation and CO2 Reduction Data - March 2021

FY21/6

No. of

Panel

Forecast

Actual

CO2

Solar

Power

Power

Difference

Output

Reduction

Power

Generation

Generation

(B) - (A)

Plants

(MW)

(kWh) (A)1

(kWh) (B)

(kg-CO2)2

July

15

29.43

3,383,411

3,052,570

-330,841

2,014,696

August

15

29.43

3,443,166

3,633,464

+190,298

2,398,086

September

15

29.43

3,002,621

2,655,633

-346,988

1,752,717

October

15

29.43

2,836,321

2,983,698

+147,377

1,969,241

November

15

29.43

2,151,937

2,281,592

+129,655

1,505,850

December

15

29.43

1,973,047

1,818,512

-154,535

1,200,218

January

15

29.43

2,089,543

1,852,450

-237,093

1,222,617

February

15

29.43

2,353,133

2,409,514

+56,381

1,590,279

March

15

29.43

3,096,326

3,196,015

+99,689

2,109,370

April

-

-

3,293,619

-

-

-

May

-

-

3,424,332

-

-

-

June

-

-

3,075,040

-

-

-

Full Year

-

-

34,122,504

-

-

-

March solar power generation was 3,196,015kWh, 3% above forecast.1

  1. Forecast Power Generation is a 50% probability mean annual production forecast (P50 forecast), calculated by an independent, third-party technical consulting firm, that serves as the base forecast for each solar power plant's operating plan.
  2. CO2 reduction is calculated as 0.66kg CO2 per kWh.

1

Power Generation by Solar Power Plant

March 2021

Panel

Forecast Power

Actual Power

Difference

Solar Power Plant

Output

Generation

Generation

(kWh)

(MW)

(kWh) (A)

(kWh) (B)

(B) - (A)

Ichigo Kiryu Okuzawa

1.33

156,155

163,152

+6,997

Ichigo Motomombetsu

1.40

159,056

153,148

-5,908

Ichigo Muroran Hatchodaira

1.24

147,901

150,447

+2,546

Ichigo Engaru Kiyokawa

1.12

122,110

127,861

+5,751

Ichigo Iyo Nakayamacho Izubuchi

1.23

129,270

133,208

+3,938

Ichigo

Nakashibetsu Midorigaoka

1.93

235,313

223,628

-11,685

Ichigo

Abira Toasa

1.16

137,896

137,267

-629

Ichigo

Toyokoro

1.02

145,885

120,473

-25,412

Ichigo Nago Futami

8.44

720,258

807,615

+87,357

Ichigo Engaru Higashimachi

1.24

131,061

132,330

+1,269

Ichigo Takamatsu Kokubunjicho Nii

2.43

269,529

300,684

+31,155

Ichigo Miyakonojo Yasuhisacho1

1.44

151,339

114,143

-37,196

Ichigo Toyokawa Mitocho Sawakihama

1.80

204,801

201,360

-3,441

Ichigo Yamaguchi Aionishi

1.24

131,235

140,938

+9,703

Ichigo Yamaguchi Sayama

2.35

254,512

289,755

+35,243

Total

29.43

3,096,326

3,196,015

+99,689

1 The Ichigo Miyakonojo Yasuhisacho ECO Power Plant temporarily stopped power production on March 17, 25, 26, 27, 29, and 31 in response to Kyushu Electric's suspension of renewable energy purchases. The table below shows the number of suspended days during the current period (April 2020 to March 2021).

Year

2020

2021

Month

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Suspended Days

8

5

-

-

-

-

-

-

-

-

3

6

Ichigo Green discloses realtime solar power production and CO2 reduction data for each Ichigo Green solar power plant at www.ichigo-green.co.jp/en/portfolio.

2

Attachments

  • Original document
  • Permalink

Disclaimer

Ichigo Green Infrastructure Investment Corporation published this content on 05 April 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 05 April 2021 06:03:01 UTC.