Log in
E-mail
Password
Show password
Remember
Forgot password ?
Become a member for free
Sign up
Sign up
New member
Sign up for FREE
New customer
Discover our services
Settings
Settings
Dynamic quotes 
OFFON

JAPAN PETROLEUM EXPLORATION CO., LTD.

(1662)
  Report
SummaryQuotesChartsNewsRatingsCalendarCompanyFinancialsConsensusRevisions 
SummaryMost relevantAll NewsOther languagesPress ReleasesOfficial PublicationsSector news

Japan Petroleum Exploration : Construction of a Coastal Limestone Carrier with a Hybrid Propulsion System using a Gas-Only Engine and a Battery

09/30/2021 | 02:22am EST
2021.9.30

Nippon Steel Corporation
Nippon Steel Cement Co., Ltd.
NS United Naiko Kaiun Kaisha, Ltd.
Japan Petroleum Exploration Co., Ltd.
Tsuneishi Shipbuilding Co., Ltd.
Kawasaki Heavy Industries, Ltd.

NS United Naiko Kaiun Kaisha, Ltd. (President and Representative Director: Kazushi Fukuda, Head Office: Chiyoda-ku, Tokyo hereinafter called "NSU Naiko"), Nippon Steel Corporation (President: Eiji Hashimoto, Head Office: Chiyoda-ku, Tokyo), Nippon Steel Cement Co., Ltd. (President: Yasuhiro Hashimoto, Head Office: Muroran City, Hokkaido), Japan Petroleum Exploration Co., Ltd. (Representative Director and President: Masahiro Fujita, Head Office: Chiyoda-ku, Tokyo), Tsuneishi Shipbuilding Co., Ltd. (President: Sachio Okumura, Head Office: Fukuyama City, Hiroshima Prefecture), and Kawasaki Heavy Industries, Ltd. (Representative Director, President & Chief Executive Officer: Yasuhiko Hashimoto, Tokyo Head Office: Minato-ku, Tokyo) have agreed to construct a vessel with a hybrid propulsion system combining a gas-only engine and a battery (hereinafter called "this Vessel") as the replacement of the limestone carrier "Shimokita Maru" owned by NSU Naiko, and have today signed" Memorandum of Transportation contract," "Shipbuilding contract," "Gas-only engine and battery propulsion system sales contract," and "Liquefied natural gas for marine fuel sales contract."

This Vessel is scheduled to start the operation in February 2024, and will be equipped with Japan's first gas-only engine and total 2,847 kWh lithium-ion battery. The LNG fuel tank is planned to use 7% nickel steel plate developed by Nippon Steel Corporation for the first time as a marine tank. The propulsion power and the onboard electric power during the sailing are generated by the gas-only engine developed by Kawasaki Heavy Industries, Ltd. Only natural gas will be used for high power, long distance, and long duration navigation. The propulsion power and the onboard power during entering, leaving and berthing ports will be provided from the battery to achieve zero-emission operation.

The CO2 emission reduction effect of introducing the propulsion system of this vessel is 23.56% (about 30% at normal load operation) compared to the conventional vessels of the same type, and the exhaust gas of the gas-only engine contains almost no SOx, and NOx emissions is far below the TierⅢ standards.

In addition, on its main routes, the loading port, Shiriyamisaki(Aomori Prefecture) and the unloading port, Muroran (Hokkaido), the zero-emission operations that are friendly to the environment will be carried out.

The construction of this Vessel was adopted by the Global Environment Bureau of the Japanese Ministry of the Environment and the Maritime Bureau of the Japanese Ministry of Land, Infrastructure, Transport and Tourism for the "Projects to promote the introduction of advanced technologies that will simultaneously achieve social innovation and the decarbonization of logistics (Projects to promote the introduction of LNG fuel systems, etc.)" FY2021 Subsidy for the expenses in projects for measures to suppress carbon dioxide emissions.

Overview of the successor ship to the Shimokita Maru
  • Deadweight tonnage (DWT): approximately 5,560 tons
  • Total length: approximately 93.8 m
  • Molded breadth: approximately 18.2 m
  • Molded depth: approximately 9.9 m
  • Scheduled Delivery: Early February 2024
  • Propulsion system: Hybrid system of gas-only engine (8L30KG) and battery
  • Shipyard: Tsuneishi Shipbuilding
  • Liquefied natural gas supplier: Japan Petroleum Exploration
  • Main route/Cargo: Shiriyamisaki - Muroran /Limestone
Roles of each company
  • Shipcharterer:Nippon Steel Corporation and Nippon Steel Cement
  • Shipowner/Operator: NS United Naiko Kaiun Kaisha, Ltd.
  • Propulsion system: Kawasaki Heavy Industries
  • Shipyard: Tsuneishi Shipbuilding
  • Liquefied natural gas supplier: Japan Petroleum Exploration

Please note that the information in the news is as of the announcement date and may be subject to change without notice.

Disclaimer

JAPEX - Japan Petroleum Exploration Co. Ltd. published this content on 30 September 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 30 September 2021 06:21:05 UTC.


ę Publicnow 2021
All news about JAPAN PETROLEUM EXPLORATION CO., LTD.
01/18ASIANOIL : Inpex unveils offshore exploration plans
AQ
01/18Inpex to conduct exploratory gas drilling off west Japan
RE
01/11Japan Petroleum Exploration Co., Ltd. signed an agreement to acquire an unknown minorit..
CI
01/10JAPAN PETROLEUM EXPLORATION : JAPEX to Participate in the Northern Vietnam LNG Terminal Pr..
PU
01/05Tranche Update on Japan Petroleum Exploration Co., Ltd.'s Equity Buyback Plan announced..
CI
2021Tranche Update on Inpex Corporation's Equity Buyback Plan announced on November 5, 2021..
CI
2021JAPAN PETROLEUM EXPLORATION : (訂正)Integrated Report 2021
PU
2021Inpex Corporation's Equity Buyback announced on November 5, 2021, has expired with 73,6..
CI
2021JAPAN PETROLEUM EXPLORATION : Notice of Executive Appointment(54.4 KB)
PU
2021Japan Petroleum Exploration Co., Ltd. - Notice Regarding Application for Listing on 'Pr..
AQ
More news
Financials
Sales 2022 242 B 2 128 M 2 128 M
Net income 2022 -68 450 M -602 M -602 M
Net cash 2022 135 B 1 190 M 1 190 M
P/E ratio 2022 -2,17x
Yield 2022 1,90%
Capitalization 149 B 1 309 M 1 310 M
EV / Sales 2022 0,06x
EV / Sales 2023 0,04x
Nbr of Employees 2 078
Free-Float 55,0%
Chart JAPAN PETROLEUM EXPLORATION CO., LTD.
Duration : Period :
Japan Petroleum Exploration Co., Ltd. Technical Analysis Chart | MarketScreener
Full-screen chart
Technical analysis trends JAPAN PETROLEUM EXPLORATION CO., LTD.
Short TermMid-TermLong Term
TrendsNeutralBullishBullish
Income Statement Evolution
Consensus
Sell
Buy
Mean consensus OUTPERFORM
Number of Analysts 5
Last Close Price 2 635,00 JPY
Average target price 2 518,00 JPY
Spread / Average Target -4,44%
EPS Revisions
Managers and Directors
Masahiro Fujita President & Representative Director
Osamu Watanabe Representative Director & Vice President
Yasushi Hamada Managing Executive Officer & GM-Technology
Yoshihiko Motoyama Executive Officer, Head-Information System & Legal
Akira Kojima Independent Outside Director
Sector and Competitors