Kalo Gold Holdings Corp. provided an update on exploration and drilling activities at the Vatu Aurum Gold Project. The Company has completed the first four holes of the Phase 1 work program at Qiriyaga Hill. Results of the first 2 holes were previously released and included KGD-01, which recorded multiple-thick gold intersections starting at surface, recording an average intersection of 101 m averaging 0.94 g/t Au with several higher-grade intervals, including 16 m at 2.08 g/t Au. The epithermal type mineralization associated with silicification, quartz veining and hydrothermal breccia was similar to those from historical drilling, which have documented numerous high-grade zones to date, with historical selective drill intersections including: 8.75 m at 36.02 g/t Au (61.25 to 80m) and 10 m at 27.18 g/t Au (76-86 m) including 120 g/t Au between 80-83m in drill hole KCD-17. Holes KGD-03 and KGD-04 were recently completed and both intersected hydrothermal breccias. KGD-03 was drilled 135m northwest of KGD-01 and intersected an 18m interval of hydrothermal breccia, 130 m vertically from KGD-01. KGD-03 represents the deepest drill hole in Qiriyaga Hill to date. KGD-04 was drilled in the northern part of the Qiriyaga Zone, intersecting an 10m interval of hydrothermal breccia. Samples from both holes are at the ALS laboratory in Brisbane, Australia and the Company is awaiting results.