The following discussion and analysis of our financial condition and results of
operations should be read in conjunction with our unaudited financial statements
and related notes appearing elsewhere in this Quarterly Report. In addition to
historical financial information, the following discussion includes certain
forward-looking statements that reflect our plans, estimates and our current
views with respect to future events and financial performance. Forward-looking
statements are often identified by words like: believe, expect, estimate,
anticipate, intend, project and similar expressions, or words which, by their
nature, refer to future events. You should not place undue certainty on these
forward-looking statements, which apply only as of the date of this report.
Except as required by applicable law, including the securities laws of the
United States, we do not intend to update any of the forward-looking statements
to conform these statements to actual results



Mineral Property Interest



Further to a Mineral Option Agreement (the "Option Agreement") dated October 4,
2014, on December 5, 2014, we entered into a subscription agreement (the
"Subscription Agreement") with Lode-Star Gold INC., a private Nevada corporation
("LSG") in which we agreed to issue 35,000,000 shares of our common stock,
valued at $230,180, to LSG in exchange for an initial 20% undivided beneficial
interest in and to LSG's Goldfield property (the "Acquisition"), which made LSG
our largest and controlling shareholder.



LSG's Goldfield Bonanza property is comprised of 31 patented mineral claims owned 100% by LSG, located on approximately 460 acres in the district of Goldfield in the state of Nevada (the "Property"). The Property is clear titled, with a 1% Net Smelter Royalty ("NSR") existing in the favor of the original property owner.





LSG was incorporated in the State of Nevada on March 13, 1998 for the purpose of
acquiring exploration stage mineral properties. It currently has one
shareholder, Lonnie Humphries, who is the spouse of Mark Walmesley, our
President and Chief Financial Officer. Mr. Walmesley is also the Director of
Operations and a director of LSG.



The execution of the Subscription Agreement was one of the closing conditions of
the Option Agreement, pursuant to which we acquired the sole and exclusive
option to earn up to an 80% undivided interest in and to the Property. To earn
the additional 60% interest in the Property, we are required to fund all
expenditures on the Property and pay LSG an aggregate of $5 million in cash from
the Property's mineral production proceeds in the form of an NSR. Until we have
earned the additional 60% interest, the NSR will be split 79.2% to LSG, 19.8% to
us and 1% to the former Property owner.



The Option Agreement can be found as Exhibit 10.1 to our report filed on Form
8-K on October 9, 2014 and is incorporated herein by reference. The Subscription
Agreement can be found as Exhibit 10.7 to our report filed on Form 10-K/A on
January 11, 2017 and is incorporated by reference.



If we fail to make any cash payments to LSG within one year of October 4, 2014,
we are required to pay LSG an additional $100,000, and in any subsequent years
in which we fail to complete the payment of the entire $5 million described
above, we must make quarterly cash payments to LSG of $25,000 until we have
earned the additional 60% interest in the Property.



LSG granted us a series of deferrals of the payments, with the most recent being
granted on January 11, 2017. LSG agreed on that date to defer payment of all
amounts due in accordance with the Option Agreement until further notice. On
January 17, 2017, the Company and LSG agreed that as of January 1, 2017, all
outstanding balances shall carry a compound interest rate of 5% per annum. It
was further agreed that the ongoing payment deferral shall apply to interest and
principal.



LSG acquired the leases to the Property in 1997 and became the registered and
beneficial owner of the Property on September 19, 2009. Since the earlier of
those dates, it has conducted contract exploration work on the Property but has
not determined whether it contains mineral reserves that are economically
recoverable. LSG is an exploration stage company and has not generated any
revenues since its inception. The Property represents its only material asset.



The Property is located in west-central Nevada, in the Goldfield Mining District
at Latitude 37° 42', and Longitude 117° 14'. The claims comprising the Property
are located in surveyed sections 35 and 36, Township 2 South, Range 42 East, and
in sections 1, 2, 11, and 12, Township 3 South, Range 42 East, in Esmeralda
County, Nevada. The Property is accessible by traveling approximately one-half
mile northeast of the community of Goldfield, along a county-maintained road
that originates at U.S. Highway 95, which runs through "downtown" Goldfield. The
town of Goldfield, which is the Esmeralda county seat (population 300), is
approximately 200 air miles south of Reno and 180 air miles north of Las Vegas.
Surface access on the Property is excellent and the relief is low, at an
elevation of approximately 6,000 feet. Vegetation is sparse, consisting largely
of sagebrush, rabbitbrush, Joshua trees and grasses. Water, electricity and
other sundry needs such as restaurants, lodging, minor medical needs, fire
station, and police are within 1 mile of the property.



All properties, claims, buildings, equipment, and supplies are owned by LSG and
we have free access to utilize and manage all those items. Operations are
managed from a 6,000 sq. ft. office and warehouse facility complete with showers
and laundry amenities. Two residential trailer sites are immediately adjacent to
this building for crew needs.

                                       12


ITEM 2. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS


        OF OPERATIONS (continued)




The Property has one working shaft, the February Premier, which has access to
the 300 ft level, with approximately 1/2 mile of ventilated drift. Underground
work has identified 2 high-grade gold-bearing zones which the company plans to
further explore. The program that we envision undertaking includes the mining of
approximately 10,000 tons of non-NI 43-101 compliant gold mineralization at an
approximate grade of 0.9 ounces per ton. The estimated grade is based on
historic drilling work done by LSG, for which the 1.5-inch core samples were
consumed by assay requirements. In order to provide adequate sample weights to
the assaying lab, the entire core was processed for individual samples.



While we have encountered several additional high-grade drill anomalies
throughout the property, it is important to note that we have no proven and/or
probable reserves at the present time and therefore the program is exploratory
in nature. Much of the property remains under-explored and it is our belief that
the district's high-grade, million-ounce ore zones repeat themselves. Further
surface and underground exploration work need to be executed.



The Property has two operating water monitoring wells that were mandatory for us
to receive a water pollution control permit. Part of the permitting application
is for the allowance of the company to store its waste rock underground. The
property has no milling onsite and we must rely on a third party to receive our
mineralized material and tombstone our tailings.



Amendment to Option Agreement


On October 31, 2019, we entered into an amendment (the "Amendment") to the Option Agreement with LSG.





Under the Amendment, the exercise of the 60% option was restructured into two
separate 30% options, such that we may now earn a 30% interest in the Property
(for a total of 50%) (the "Second Option") by completing the following actions:



? paying LSG $5 million in cash from the Property's mineral production proceeds

in the form of an NSR royalty (the "Initial Payment");

? paying LSG all accrued and unpaid penalty payments under the Option Agreement;

? repaying to LSG (i) all loans, advances or other payments made by LSG to the

Company and (ii) all expenditures on the Property funded by or on behalf of LSG

until the date on which the Initial Payment has been completed; and

? funding all expenditures on the Property until the date on which the Initial


   Payment has been completed.



Following the exercise of the Second Option, we may earn an additional 30% interest in the Property (for a total of 80%) (the "Third Option") by completing the following actions:

? paying LSG a further $5 million in cash from the Property's mineral production

proceeds in the form of a NSR royalty (the "Final Payment"); and

? funding all expenditures on the Property from the date on which the Second


   Option is exercised until the date on which the Final Payment has been
   completed.




The primary effect of the Amendment is therefore to increase to the purchase
price for the additional 60% interest in the Property from $5 million to $10
million, while at the same time separating it into tranches.



The foregoing description of the Amendment includes a summary of all the material provisions but is qualified in its entirety by reference to the complete text of the Amendment included as Exhibit 10.8 to our report filed on Form 8-K on November 6, 2019 and incorporated herein by reference.





We agreed with LSG that upon the successful completion of a toll milling
agreement after permitting is achieved, there will be a basis to form a joint
management committee to outline work programs and budgets, as contemplated in
the Option Agreement and for us to act as the operator of the Property. To the
date of this report LSG has borne all costs in connection with operations on the
Property. We expect the first work program, entailing Property-related costs for
which we will be responsible, to be approved in 2021.

                                       13



ITEM 2. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS


        OF OPERATIONS (continued)



Property - Previous Exploration Work, Mineralization and State of Exploration


The Property is wholly owned by LSG, our largest shareholder, and is clear
titled. A 1% net smelter royalty exists in the favor of the original property
owner. The property consists of 31 patented claims on approximately 460 acres.
LSG, over the past 15 years and continuing, has spent close to $8 million on
underground rehab of approximately 1/2 mile of drift at the 300ft sub-surface
level. LSG also executed 22 surface core drill holes for a total of 10,400ft and
152 underground core drill holes for a total of 23,000ft.



It is important to note the following sample preparation and quality controls used by LSG and by ICN, a previous operator of the Property:

Lode-Star Gold drill hole core sampling and analytical protocol


All drill core samples were prepared and delivered to ALS Minerals in Reno by
Tom Temkin, our COO. Individual sampled intervals varied from one to five-foot
lengths, based on geologic parameters, and included 100% of core intervals. No
core splitting was conducted. No duplicate samples or standards were introduced
other than those inserted and utilized by ALS for their internal quality
control. Lab preparation of individual samples included crushing and grinding to
minus 200 mesh, followed by a 1-ton assay for gold. All samples that initially
assayed over 1.0 opt Au were systematically re-assayed.



ICN drill hole core and Rotary RC sampling and analytical protocol


All drill core samples were prepared by ICN personnel and either delivered to
the assay lab or were picked up on-site by lab personnel. Rotary RC chip
drilling samples were collected on-site and transported to Reno by the
respective labs. The labs used included ALS Minerals and American Assay Lab.
Core was sawn by ALS Minerals and/or ICN personnel. Individual core sampled
intervals varied from one to five-foot lengths, based on geologic parameters,
and included one-half of the original core material. Rotary RC samples were
taken at five-foot intervals entirely. Quality control for all samples included
a protocol of inserting duplicate samples, blanks, and known standards, at
repeating intervals to maintain .08% check sampling. Lab preparation of
Individual samples included crushing and grinding to minus 200 mesh, followed by
a 1-ton assay for gold. All samples that initially assayed over 1.0 opt Au

were
systematically re-assayed.



Third Party Assay Data Audit



Mine Development Associates (MDA Reno), a highly regarded third party NI 43-101
service provider, has audited our drill hole database and performed a
comparative QA/QC check assay analysis on selected drilling and determined no
inconsistencies to exist and assays were repeatable.



NI 43-101 Update Status



We filed an independent Technical Report written in accordance with National
Instrument 43-101 - Standards of Disclosure for Mineral Projects (NI 43-101) on
our property located in Goldfield, Nevada. Although not required for OTC
listing, we had this report prepared under NI 43-101 guidelines to provide a
summary of the Goldfield Bonanza Project. This NI 43-101 is required
documentation for future possible business transactions and listings on Canadian
exchanges. The Technical Report titled "Technical Report on the Goldfield
Bonanza Project Esmeralda County Nevada U.S.A." dated January 15, 2020 has been
prepared by Mr. Robert M. Hatch, SME Registered Geologist.



The report is available for review on EDGAR (https://www.sec.gov/edgar/searchedgar/companysearch.html) and SEDAR (https://www.sedar.com/) under Lode-Star Mining's issuer profile.





Metallurgy Reports



To date we have had three metallurgy reports prepared. In order they are: Kappes
Cassady & Associates located in Reno, NV dated July 10,2006, Newmont Mining
located in Carlin, NV dated May 27, 2010, and McClelland Laboratories, Inc.
located in Reno, NV dated January 26, 2016. Indications are that we can expect
at a minimum, an 85% AU recovery from floatation milling. Better recovery is
achieved by Agitated Leach processing, which show results closer to +90%. The
best recovery results, +95%, due to the high sulphide content of the ore, is
achieved through roasting. An additional lab report was generated by Kappes
Cassady & Associates to determine ore compatibility for processing at Scorpio
Gold's milling circuit.

                                       14


ITEM 2. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS


        OF OPERATIONS (continued)




Key Developments



On November 20, 2018 we were issued Water Pollution Control Permit NEV2017109
from the Nevada Department of Environmental Protection (NDEP) regarding
production at the property. This Permit authorizes the construction, operation,
and closure of approved mining facilities in Esmeralda County, Nevada. The
Permit is effective for 5 years until November 20, 2023 and authorizes the
processing of 10,000 tons of ore per year from Lode-Star's underground
operations. 100% of the permitting cost has been borne by our largest
shareholder, Lode-Star Gold INC.



Unique to our production permit, the Nevada Department of Environmental
Protection has endorsed the Company's intensions to temporarily store waste rock
underground. Once stockpiled, waste rock is brought to the surface to backfill
and remediate our historic abandoned mine shafts. This will save us the
significant time and expense of having to permit and build a surface waste

containment facility.



Mine Development:



LSG is developing its Red Hills zone and raising in its Church zone. The raise
in the Church Zone is expected to become the Project's secondary escape-way and
a vertical pathway to access gold ore identified in the ICN's Church zone
drilling.



Step Out Drilling and Exploration:


Drilling is underway on the property. The Company is currently waiting for
assays from its first hole. The plan will be to drill approximately twelve holes
at a rate of two to three holes per month. This conservative drilling rate will
give us time to assay each hole before we methodically drill the next. The
objective is to understand the geometry of this gold bearing zone and to
identify additional cross cutting features.



The immediate target area, as described in our most recent NI 43-101, is the
high-grade area referred to as the Church Vein Zone. This zone measures up to 40
feet in width and trends at least 600 feet north-northeasterly, immediately west
of the Church shaft. Drilling by ICN in 2011 included 19 core holes with varying
results. Some holes did not hit the intended target and will be re-drilled to
better test the target. As drilling progressed into the vein area, marginal gold
was identified. Three holes, ICN-003, ICN-013 and ICN-014 (results below) hit
solid high- grade intercepts which need further drilling to define. (Grams

per
Metric Tonne = 34.2857).



Hole ICN-003: included 9.5 ft (2.90 m) weighted averaged assays of 40.79 oz/ton
(1398.6 g/t) gold. Hole ICN-013: included 4.5 ft (1.37 m) with 51.46 oz/ton
(1764.2 g/t) gold. Hole ICN-014: included 3.5 ft (1.00 m) with 68.02 oz/ton
(2332.0 g/t) gold. Hole ICN-001 included 3.0 ft (0.90 m) with averaged assays of
6.29 oz/ton (215.7 g/t) gold and ICN-023 included 4.0 ft (1.22 m) with averaged
assays of 1.44 oz/ton (49.35 g/t) gold.



Most recently LSG has completed its Phase One 1500ft of surface core drilling in
the Church Zone and awaiting completion of its assay results of its 6 holes.
Phase Two is scheduled to commence once the assays of Phase One have been
reviewed.



Mine Development - Drilling the Northeast Corridor


For technical details, see our report filed on Form 10-K for the year ended
December 31, 2020. The Property's Red Hills and Church zones can support mine
development utilizing the Company's current infrastructure. Underground mining
in the Red Hills area will extract ore on the 300-level. We plan to initially
mine 10,000 tons of material per year at a rate of approximately 50 tons per
day.



We have a $5.0 million exploration and mine development program that is focused
on defining the Property's existing and mineable gold mineralization; to advance
the geologic modeling in preparation for mining; and bulk sampling of the
Project's current underground workings as well as for working capital purposes.



Details of the development program are as follows:





Item Major Categories                               Cost
1.   Equipment & Mining Materials                  $275,000
2.   Secondary Escape & Second Production Shaft  $1 million
3.   Red Hills/Stope & Decline Vein Zones Mining   $860,000
4.   Drilling the Northeast Corridor             $2 million
5.   Corporate & General Admin.                    $865,000
     Total                                       $5 million


                                       15


ITEM 2. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS


        OF OPERATIONS (continued)



Line items 1, 2, 3 and 5 above, totaling $3.0 million are required for bulk sampling of the Property's current workings.

Line item 4 accounts for the Development Drilling totaling $2.0 million required to fully assess the Northeast Corridor.





The estimates above are for planning purposes only. No information contained
herein should be considered an official corporate offering. The application of
funds shown above is an estimate and may not exactly match the actual future
costs.



Funding



All of our ongoing operations, since the inception of our Mineral Option
Agreement on October 4, 2014, have been funded by monies advanced to us by
Lode-Star Gold INC. (LSG) our largest shareholder. We do not currently have
enough funds to carry out our entire plan of operations, so we intend to meet
the balance of our cash requirements for the next 12 months through a
combination of debt financing and equity financing through private placements.
There is no assurance that we will be successful in completing any such
financings



If we are unsuccessful in obtaining sufficient funds through our capital raising
efforts, we may review other financing options, although we cannot provide any
assurance that any such options will be available to us or on terms reasonably
acceptable to us. Further, if we are unable to secure any additional financing
then we plan to reduce the amount that we spend on our operations, including our
management-related consulting fees and other general expenses, so as not to
exceed the capital resources available to us. Regardless, our current cash
reserves and working capital will not be sufficient for us to sustain our
business for the next 12 months, even if we decide to scale back our operations.



Personnel



We have no employees. Apart from quarterly consulting fees, our president and
CEO, Mark Walmesley, receives no compensation for his services. We expect to
continue to use outside consultants, advisors, attorneys and accountants as
necessary.



Our Chief Operating Officer, Thomas Temkin, who is also a director, is a
Certified Professional Geologist and a Qualified Person under National
Instrument (NI) 43101, with more than 40 years of experience in the mining
industry, primarily in exploration in the Western United States. He is currently
a consulting geologist working with LSG. Mr. Temkin has been associated with LSG
and the Property for over 20 years and has been instrumental through its entire
exploration program to date.


Our Corporate Secretary, Pam Walters, has been associated with the mining industry for over 25 years and has managed the corporate finance and business operations of LSG and its owners.





Going Concern



Our auditors have issued a going concern opinion. This means that there is
substantial doubt that we can continue as an on-going business for the next
twelve months unless we obtain additional capital to pay our expenses. This is
because we have not generated any revenues to-date and we cannot currently
estimate the timing of any possible future revenues. Our only source of cash at
this time is from loans or investments by others in our common stock.



Results of Operations


The following summary of our results of operations should be read in conjunction with our financial statements for the period ended March 31, 2021 which are included above in Part I, Item 1.





                           Three Months Ended March 31                 Change
                              2021               2020          Amount       Percentage
                               $                   $              $
Revenue                               -                 -             -               -
Operating Expenses              104,130           114,579       (10,449 )          (9%)
Operating Loss                 (104,130 )        (114,579 )      10,449            (9%)
Other Income (Expense)          (22,750 )         (18,929 )      (3,821 )           20%
Net Loss                       (126,880 )        (133,508 )       6,628            (5%)


                                       16


ITEM 2. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS


        OF OPERATIONS (continued)




Revenues



We had no operating revenues during the three-months ended March 31, 2021 and
2020. We recorded a net loss of $126,880 for the current quarter and have an
accumulated deficit of $3,621,781. The possibility and timing of revenue being
generated from our mineral property interest remains uncertain



Expenses



Notable year over year differences in expenses for the first quarter are as
follows:



                                          Three Months Ended March 31             Increase/(Decrease)
                                           2021                 2020            Amount        Percentage
                                            $                    $                 $
Consulting services                           31,188               65,850        (34,662 )         (53%)
Exploration and evaluation                     7,531                    -          7,531               -
Professional fees                             19,831                2,270         17,561            774%

Interest, bank and finance charges            22,750               18,929  

       3,821             20%




Consulting services expense was higher in the first quarter of 2020 primarily
due to that quarter including approximately $34,000 that was paid to an advisory
firm for assistance in exploring fund raising opportunities, with no equivalent
expense in Q1 of 2021.


Exploration and evaluation expense in the current quarter was for assay costs. No such costs were incurred in Q1 of 2020.





Professional fees in the first quarter of 2021 included accounting and audit
costs for the 2020 year-end, whereas the equivalent of those costs for the 2019
year-end had not been invoiced yet in the first quarter of 2020.



Interest, bank and finance charges were higher primarily due to the ongoing increase in loans from LSG.