Metal Hawk Limited provided an update on exploration drilling activities at the Kanowna East Project, situated 25 kilometres north-east of Kalgoorlie and 8 kilometres from Northern Star's Kanowna Belle gold mine (+5 Moz Au). Assay results have been received for approximately half of the recently completed aircore (AC) drilling at Kanowna East. A total of 240 AC holes for 15,520m have been drilled, with results pending for 121 holes. Best results from composite samples received to date include: 4m at 7.11g/t Au from 55m in KEAC180; 5m at 2.24g/t Au from 65m in KEAC006 (to end of hole); 6m at 1.54g/t Au from 54m in KEAC051; 6m at 1.19g/t Au from 57m in KEAC053; 5m at 0.89g/t Au from 56m in KEAC183; 5m at 0.75g/t Au from 65m in KEAC008; 6m at 0.70g/t Au from 64m in KEAC005; 6m at 0.57g/t Au from 60m in KEAC035. Aircore drilling has confirmed historical mineralisation at Little Lake, where a single aircore traverse in 2005 intersected 18m at 1.2 g/t Au (from 60m to end-of-hole). Metal Hawk's drilling has intersected highly anomalous gold in multiple aircore holes over a broad area up to 400m north of this historical intersection. Highlights include: 4m at 7.1g/t Au from 55m in KEAC180; 5m at 2.24g/t Au from 65m (to end of hole) in KEAC006; 5m at 0.89g/t Au from 56m in KEAC183. Drilling at the Western Tiger prospect has identified a number of gold anomalies situated near the western side of tenement E27/596 and within close proximity to a number of historical gold intersections from RAB drilling. Best results include: 6m at 1.54g/t Au from 54m in KEAC051; 6m at 1.19g/t Au from 57m in KEAC053; 6m at 0.57g/t Au from 60m in KEAC035. The Company will design follow-up work as Stage-1 drilling is completed and assay results are received. Stage-2 drilling is expected to commence in Q2-2021 and will include infill and extensional aircore as well as deeper RC drilling in order to further test the bedrock. Multi-element analysis will be carried out on end-of-hole samples which The Company will use to help interpret the bedrock geology and mineralisation. Additionally, PoW (Programme of Work) approval has been granted for further exploration drilling to the north of Little Lake. A broad zone of structural complexity presents as a priority untested gold target and additional drilling will be conducted as part of Metal Hawk's Stage-2 exploration program. While the Company is focused on exploring for gold at Kanowna East, the project is also highly prospective for nickel sulphides. Metal Hawk has a Farm-in and Joint Venture Agreement with Western Areas Limited which includes the Kanowna East Project. WSA can earn a joint venture interest in all commodities other than gold and are managing nickel exploration on the project.