Northstar Gold Corp preliminary drill results at Miller Gold Property reveals high-grade results
November 17, 2023 at 12:41 pm EST
Share
(via NewsDirect)
Northstar Gold Corp's CEO, Brian Fowler joined Steve Darling from Proactive to share the latest advancements in the company's mining operations, notably the completion of an extensive drilling project at the Cam Copper Mine.
The mine, which is conveniently accessible by road, is recognized as a satellite high-grade volcanogenic massive sulphide (VMS) copper system, located approximately 2.4 kilometers southwest of the Allied Gold Zone where Northstar is conducting active exploration.
Northstar has reported that all four of the diamond drill holes completed, covering a total of 720 meters, encountered significant lenses of copper-rich VMS deposits. Notably, between the depths of 116.55 meters and 119 meters in Zone 2, the drilling cut through massive and stringer chalcopyrite formations over a 2.45-meter section.
While the analytical results from these drills are still forthcoming, they are anticipated in the near future.
Fowler expressed to Proactive that the initial sampling and Phase I drill outcomes from the 2023 explorations solidly confirm the existence of a significant, multi-layered high-grade copper VMS system within the Cam Copper Mine. This system shows remarkable potential for expansion.
With the necessary permits already secured, Northstar is strategically positioned to proceed with the exploration of the southeastern strike and the down-plunge extensions of the Cam Copper massive sulphide zones in the upcoming Phase II of their drilling program. This next phase is set to delve deeper into the geological structure, aiming to uncover the full extent and richness of the copper deposits present.
Contact Details
Proactive Investors
+1 604-688-8158
na-editorial@proactiveinvestors.com
Copyright (c) 2023 TheNewswire - All rights reserved.
Copyright (c) 2023 TheNewswire - All rights reserved., source Press Releases
Northstar Gold Corp is a Canada-based company, which is focused on the exploration, development, and acquisition of exploration properties in the prolific Abitibi Greenstone Belt. The Company's projects include Miller Gold project, Searles Property, Bryce Project, Temagami-Milestone, Rosegrove and Britcanna project. The 1100 hectare Miller Gold project is located approximately 18 kilometers (km) south of Kirkland Lake Goldâs Macassa Mine Complex. The 64-hectare Searles Property is located approximately 18 km southeast of Kirkland Lake. The 4,650-hectare Bryce project is situated on the western extension of the Ridout Break, 65 km east of the Juby Gold Project and 35 kilometers south of the Company's Miller Gold Property. The Temagami-Milestone project is located in Strathcona Township in Northeastern Ontario. The 1,200-hectare Rosegrove Property is situated 0.5 km from the Miller Gold Property. The Britcanna project is situated in south Kirkland Lake, Ontario.