Northstar Gold announces strong assay results from three drill holes at Miller gold property
November 23, 2023 at 01:38 pm EST
Share
(via NewsDirect)
Northstar Gold Corp CEO Brian Fowler joined Steve Darling from Proactive to discuss the promising results from the last three Phase I diamond drill holes at the Cam Copper Mine, located within the Miller Copper-Gold Property in Ontario.
Fowler reported that Northstar completed 720 meters of drilling across four diamond drill holes. Each of these holes intersected lenses of copper-rich volcanogenic massive sulphides (VMS). Notably, drill hole CC03-23 yielded high-grade copper, grading 14.8% Cu over a 2.45-meter span from 116.55 to 119 meters within Zone 2, as illustrated in the provided photos.
This particular find is considered significant as it represents an increase in the thickness of Zone 2 and suggests the potential for expansion down-plunge to the southeast.
Additionally, Zones 1, 3, and 4 also exhibit potential for further discovery along their strike and at greater depths.
With the necessary permits in place, Fowler emphasized Northstar's readiness to advance its exploration efforts. The company is set to explore the extensions along the strike and down-plunge of the Cam Copper Mine's massive sulphide zones in the upcoming Phase II drilling program.
Contact Details
Proactive Investors
+1 604-688-8158
na-editorial@proactiveinvestors.com
Copyright (c) 2023 TheNewswire - All rights reserved.
Copyright (c) 2023 TheNewswire - All rights reserved., source Press Releases
Northstar Gold Corp is a Canada-based company, which is focused on the exploration, development, and acquisition of exploration properties in the prolific Abitibi Greenstone Belt. The Company's projects include Miller Gold project, Searles Property, Bryce Project, Temagami-Milestone, Rosegrove and Britcanna project. The 1100 hectare Miller Gold project is located approximately 18 kilometers (km) south of Kirkland Lake Goldâs Macassa Mine Complex. The 64-hectare Searles Property is located approximately 18 km southeast of Kirkland Lake. The 4,650-hectare Bryce project is situated on the western extension of the Ridout Break, 65 km east of the Juby Gold Project and 35 kilometers south of the Company's Miller Gold Property. The Temagami-Milestone project is located in Strathcona Township in Northeastern Ontario. The 1,200-hectare Rosegrove Property is situated 0.5 km from the Miller Gold Property. The Britcanna project is situated in south Kirkland Lake, Ontario.