P.I.D.C. House, Dr. Ziauddin Ahmed Road,

P. O. Box 3942, Karachi-75530, Pakistan

Tel: 92-21-35232998,92-21-35681391-95

UAN: 92-21-111-568-568

Fax: 92-21-35680005 & 92-21-35682125

Website: https://www.ppl.com.pk/

Our reference: CS/PSX-0159

Your reference:

Date: 6th October 2023

Mr. Syed Ahmad Abbas

Chief Listing Officer

Listing Department

Pakistan Stock Exchange Limited

Stock Exchange Building

Stock Exchange Road, Karachi

Dear Sir,

Re: Production Enhancement

The Company is pleased to inform that being a major stakeholder in Pakistan's Energy Outlook, its management remains committed to secure energy future of the country by exploiting all available resources at its disposal to maximize domestic hydrocarbon production. With many of the Company's producing fields maturing and on their natural decline, it becomes imperative that the decline is arrested by realization of enhancement opportunities through existing resources. Multiple potentials candidates (wells) for production enhancement were selected using state of the art techniques ensuring no additional expenditures and production loss for their maturation.

Rigless production enhancement campaign was completed from June to September 2023 which resulted in significant production gain of approximately 13 MMscfd of gas and 90 barrels per day of condensate from the existing wells potential.

Production Enhancement (June- September 2023)

Sr#

Production Enhancement

Wells

Field/

Gain in Production

Gas

Condensate

Job

Block

(MMscfd)

(BPD)

1

Sui - 100

0.7

-

2

Acid Stimulation

Sui - 67

1.3

-

3

Sui - 93

0.2

-

4

Sui-115

Sui

2.0

5

Sui-96

1.7

-

6

Sui-7

1.3

-

7

Additional Perforations

Sui - 36

0.7

-

8

Sui - 104

0.5

-

9

Sharf-3

Gambat

1.4

10

10

Kabir X-1

South

0.7

80

11

Surface De-Bottle Necking

Sui-108

Sui

2.0

-

Total Gain in Production

12.5

90

12

Scale Clean out for Well

Revival

Fazl X-1

Hala

7.5

10

An ISO 9001, ISO 14001 & ISO 45001 certified company

Following are the significant milestones / achievements of the campaign.

  • Additional Perforations:Added ~6MMscfd gas and ~90 BPD condensate production in Sui and Gambat South fields from six wells i.e Sui-7,Sui-96,Sui-36,Sui-104,Sharf-3 (Gambat South) and doubled the production in Kabir X-1 (Gambat South) by adding perforations in relatively less depleted zones.
  • Acid Stimulation:~5MMscfd gas production increased in Sui Field from four wells (Sui- 115, Sui-67,Sui-93,Sui-100) by successful removal of near wellbore damage.
  • Surface De-Bottlenecking:Enhanced ~2MMscfd gas production from Sui-108 (Sui Field) by optimizing wellhead surface fittings and chemical inhibition strategy.
  • Scale Clean Out:Fazl X-1 (Hala block) was caught up with sharp production decline and ceased to flow due to suspected Scale deposition in the wellbore. Timely diagnosis and remedial job were performed and revived at its optimum potential i.e 7.5MMscfd gas and 10 BPD Condensate.

This additional hydrocarbon production will contribute in reducing the energy demand and supply gap, and will save significant foreign exchange for the country through indigenous hydrocarbon production. The Company will continue exploring new production enhancement opportunities through rigless and other new techniques as well as short rig work overs in near future.

The foregoing information is submitted in compliance of Section 96 of the Securities Act, 2015 and Clause 5.6.1(a) of PSX Regulations, for dissemination amongst your members.

Yours truly,

Ali Jaffar

Company Secretary

Copy: Executive Director/HOD, Offsite-II Department, Supervision Division, SECP, Islamabad.

An ISO 9001, ISO 14001 & ISO 45001 certified company

2

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Pakistan Petroleum Limited published this content on 06 October 2023 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 06 October 2023 10:57:09 UTC.