Patel Engineering Limited has been awarded the Letter of Acceptance (LOA) from City and Industrial Development Corporation (CIDCO) for the construction of a 6.70 km long treated water tunnel and associated works from Sai Village to Vindhane Village in Raigad District, Maharashtra. The water tunnel project worth INR 519.50 million is going to be executed without any joint venture partnership.
Market Closed -
Other stock markets
|
5-day change | 1st Jan Change | ||
55.96 INR | +1.63% | -5.55% | -6.95% |
EPS Revisions
1st Jan change | Capi. | |
---|---|---|
-6.95% | 566M | |
+1.60% | 9.18B | |
+50.78% | 4.53B | |
+46.56% | 3.98B | |
+27.39% | 2.93B | |
+16.28% | 1.54B | |
+18.90% | 1.56B | |
+3.90% | 1.27B | |
+6.96% | 903M | |
-2.38% | 826M |
- Stock Market
- Equities
- PATELENG Stock
- News Patel Engineering Limited
- Patel Engineering Limited Receives Loa for the Design & Construction of Water Tunnel and Allied Works in Raigad District from City and Industrial Development Corporation