Celamin Holdings Limited announce results for Chaketma drilling completed since 2014. This includes the flagship Kef El Louz deposit at Chaketma, with drilling extending known mineralisation approximately 1km2 to the south of the 2012 JORC Inferred Resource of 37Mt @ 21% P2O5. Exploration drilling continued for the period 2015-2021, including infill and extensional drilling. This drilling is considered significant due to its potential to add to the previously announced Resources, and a Resource update has commenced. Since the first hole was drilled in 2011, a total of 162 holes for 14,338 metres have been drilled across all prospects at Chaketma. All of these additional holes were drilled at Kef El Louz and Gassaa Kebira. At Kef El Louz the drilling was a combination of infill and extension drilling, while at Gassaa Kebira the drilling was mostly infill, with some extension drilling at Kef El Louz. In 2013 and 2014 Celamin announced combined JORC compliant Inferred Resources of 130Mt at 20.5% at Kef El Louz and Gassaa Kebira. It is expected that the next resource model s due out in early-2022 will reflect an increase in confidence and size at Kef El Louz. Given the consistency in phosphate grade across these prospects the grade is not expected to change much overall.