Quarterly Report for December 2021

Highlights

  • During the quarter Rand and Tribune toll processed 49,399 tonnes of ore at 3.92 g/t from the EKJV operations at two processing plants in the district, with Rand's share equating to 12,350 tonnes
  • 5,204 ounces of gold were produced by Rand and Tribune during the quarter
  • Rand's 25% share of the gold produced was 1,301 oz
  • Significant high grade intercepts from drilling at the EKJV project including results from the Pode lode of 0.5 m @ 19.8 g/t, 0.7 m @ 23.6 g/t, and drilling in the Falcon lode including 0.6 m @ 39.7 g/t and 0.10 m @ 146.1 g/t
  • Continued exploration success at EKJV identifying the Nugget structure including 3.6m @ 164.9 g/t and 1.77 m @ 45.3 g/t

RAND MINING LTD. (ASX:RND)

Pa g e 1 of 21

ASX Announce m e nt

For personal use only

Ore Stockpiles

At the end of the quarter, Rand is entitled to a share of the following stockpiles:

STOCKPILES

ROM Pad

Ore Source

Ore Tonnes

Grade g/t

Rand

Entitlement

Rubicon ROM

EKJV RHP Ore

3,513

4.85

12.25%

Rubicon ROM

EKJV Stockpiles

1.26

12.25%

EKJV RHP Low Grade

62

Mungari ROM

EKJV RPH Ore

64,276

4.23

12.25%

Mungari ROM

EKJV RPH Low Grade

10,104

1.26

12.25%

Rand Share of EKJV Stockpiles

9,549

3.87

100%

Geology and Mining

East Kundana Joint Venture

Raleighl ighremainedUndergronundcareMineandProductionmaintenance throughout the quarter.

AtRaleighthe endUndergroundof the quarter,MinethebottomDevelopmentof the Raleigh Decline remains at 5602 m RL, 743 m from the surface, the top of the Sadler Incline remains at 5989 m RL, 356 m from the surface and the bottom of the Sadler Decline remains at 5944 m RL, 401 m from the surface.

There was no development during the quarter.

ContainedRubicon-Hornetgoldin-stopePegasusandUnddevelopmentrgroudoreMineminedProdduringctionthe quarter is tabulated below:

Rubicon, Hornet & Pegasus

October

36,222

3.75

4,363

Month

Tonnes

Grade

Ounces

November

35,819

4.14

4,764

December

29,251

3.95

3,713

September 21 Q

124,711

4.04

16,216

Dec

021 Q

01 292

3 94

841

Quarterly reconciled gold production was 1,642 oz above the EKJV Managers production forecast.

The outlook for the next quarter is similar production to the December quarter.

Rand's Entitlements to Mined Ore (12.25%)

Rubicon, Hornet & Pegasus

Quarter

Tonnes

Grade

Ounces

t

g/t

troy oz

Dec

021 Q

408

3 94

573

September 21Q

15,277

4.04

1,986

RAND MINING LTD. (ASX:RND)

Pa g e 2 of 21

ASX Announce m e nt

For personal use only

DevelopmentRubicon-Hornperformancet-Pegsus forUndergroundthe quarter Mineis summarisedDevelopmentin the following table

ORE BODY

Rubicon, Hornet & Pegasus

Month

Capital

Operating Lateral development

Decline

Other

Ore

Waste

Paste

(m)

(m)

(m)

(m)

(m)

October

28.6

86.0

142.5

0

5.03

November

21.8

41.0

81.4

31.4

4.7

December 2021

63.4

214.9

298.2

74.6

87.1

December

13.0

87.9

74.3

43.2

32.0

Toll Processing

During the quarter a total of 49,399 tonnes of Rand and Tribune ore at 3.92 g/t was processed under toll Milling contracts to recover 5,204 oz of gold at 93.70% gold recovery. Of this total, 29,495 tonnes were processed at Mungari and 19,904 tonnes were processed at Lakewood Mill.

Rand and Tribune gold production for the December 2021 quarter, along with Rands share is tabulated below.

Quarter

Gold (oz)

Rand's share

Au (oz)

Dec

021

5,204

1 301

September 21

16,981

4,245

Rand Share of Ore Processed

Tonnes

Head Grade

Recovery

Fine Au

Campaign Location

Milled

Au (g/t)

(%)

Produced

(Oz)

GMM Lakewood

4,976

3.82

94.18

392

EVN Mungari

7,374

4.11

93.26

909

Total

12,350

3.92

93.70

1,301

ExplorationKJV Underground Exploration

activity in FY22 Q2 across the East Kundana Joint Venture primarily focused on the Pode and Nugget prospects. Exploration being defined by Drill Targeting or Resource Targeting designations. A total of 15 diamond drill holes for 2,763 metres were completed between 1st October 2021 and 31st December 2021.

RAND MINING LTD. (ASX:RND)

Pa g e 3 of 21

ASX Announce m e nt

For personal use only

Project

Prospect

Tenement

DD Metres

DD Samples

EKJV

Nugget

M16/309

1,923

673

EKJV

Pode

M16/309

841

152

Total

2,763

825

EKJV exploration activity for FY22 Q2. Drilled metres includes incomplete drillholes.

ubicon

Results received for holes targeting Nugget down-dip and potential repeat structures at depth, with

RUBDT21041 intercepting mineralisation proximal to K2A lithological contact.

Hole ID

East

North

RL

Dip

Azi

Hole

From

To

DH Width

Grade g/t Au

True

(MGA)

(MGA)

(AHD)

(MGA)

Depth

Width

RUBDT21041

333305

6597564

-227

18

261

213.04

35.94

36.45

0.5

3.2

0.4

64.00

64.70

0.7

5.0

0.6

74.44

75.40

1.0

14.0

0.8

81.86

82.40

0.5

4.9

0.5

173.18

177.00

3.8

3.6

3.3

179.51

182.47

3.0

6.9

2.6

RUBDT21047

333281

6597583

-189

27

219

157.95

125.60

126.00

0.4

4.3

0.2

Summary of significant assays results returned for Rubicon drilling during Q2 FY22.

RAND MINING LTD. (ASX:RND)

Pa g e 4 of 21

ASX Announce m e nt

For personal use only

East-west section of significant results received for Rubicon drilling during Q2 FY22.

ElevenPode diamond drillholes targeting the Pode and associated satellite structures returned significant intercept results during the quarter. A new satellite lode was intercepted in three holes with results from PODRT21174 returning 0.5 m @ 19.8 g/t. Drilling in the quarter also showed potential for the Typhon lode to be extended to the north, with PODRT20379 intercepting 0.7 m @ 23.6 g/t.

Falcon Lodes were also intercepted in PODRT21007 and PODRT21009 with significant results including 0.6 m @ 39.7 g/t and 0.10 m @ 146.1 g/t respectively.

Sections highlighting significant Pode drilling intercepts are shown below.

East

North

RL

Azi

Hole

Grade

True

Hole ID

Dip

From

To

DH Width

g/t

(MGA)

(MGA)

(AHD)

(MGA)

Depth

Width

Au

PODRT20363

332712

6598482

-112

-17

294

636.44

597.77

598.07

0.3

6.8

0.3

636.44

97.75

98.20

0.5

3.6

0.1

636.44

99.06

100.20

1.1

5.7

0.3

PODRT20379

332712

6598484

-112

6

302

600.37

174.50

175.90

1.4

23.6

0.7

600.37

291.26

291.56

0.3

6.3

0.3

PODRT21006

332627

6598094

-201

-33

173

444.04

Assays

Pending

PODRT21007

332627

6598095

-201

-40

131

348.07

168.49

169.95

1.5

39.7

0.6

RAND MINING LTD. (ASX:RND)

Pa g e 5 of 21

ASX Announce m e nt

This is an excerpt of the original content. To continue reading it, access the original document here.