Red Pine Exploration Inc. reports new drilling results from its ongoing exploration program. The new results validate the presence and continuity of gold mineralization in the Sadowski Vein Network. There is confirmation of significant gold mineralization continuity in the Sadowski Vein Network located above the Jubilee and the Minto Mine shears.

Near-surface intersection of 2.64 g/t gold over 25.61 metres in SD-23-437 that includes 34.64 g/t Au over 1.75 metres approximately 40 metres down-dip of the intersection of 52.12 g/t gold over 2.29 metres in SD-22-350. Adjacent near-surface intersection contains 1.36 g/t gold over 11.02 metres including 27.1 g/t gold over 0.50 m in SD-23-436. The Sadowski Vein Network and the presence of near-surface gold mineralization is further confirmed with diamond drilling over a strike length of 150 metres with the intersection of 4.95 g/t gold over 1.00 metres in SD-23-438.

Surface grab samples acquitted in the 1990s from Van Ollie Exploration containing between 2.06 g/t Au and 13.38 g/t Au indicate the presence of mineralization associated with quartz veins up to 160 metres east of the currently drill-tested footprints of the Sadowski Vein Network (AFRI 41N15NE0011) This suggests a potential strike length exceeding 300 metres for the Sadowski Vein Network. Mineralization is now known to extend between surface and approximately 90 m vertical depth in the Sadowski Vein Network.