Red River Resources Limited reported production results for the first quarter ended September 2021. Thalanga Operations produced 7,539 tonnes of zinc concentrate, 1,984 tonnes of lead concentrate and 4,411 tonnes of copper concentrate. Mining and processing operations were strong throughout the quarter with Far West Mine delivering above reserve Zinc Equivalent (Zn Eq.) grades to the processing plant.