Silver Hammer Mining Corp. drill results from the Phase II drilling program at the Silver Strand Project (‘Silver Strand' or ‘the Project'). The Company completed nine drillholes from its previously established underground drilling station that were generally focused on testing the historically mined zone of gold-silver (‘Au-Ag') mineralization at greater depth and further along strike.

Key Highlights and Takeaways: Six of the nine drillholes returned >100 grams per tonne (‘g/t') Ag and/or >1 g/t Au intercepts. SS22-017 intersected 2.9 g/t Au over 8.4 metres (‘m'), including 4.4 g/t Au and 74.5 g/t Ag over 1.8 m, demonstrating the potential for significant gold grades at Silver Strand. SS22-015 intersected three mineralized zones, including 613 g/t Ag over 0.5 metres (‘m') extending mineralization to 65 m below historical workings.

SS22-18 also intersected multiple zones: 212 g/t Ag and 0.67 g/t Au over 1.5 m, and 2.45 g/t Au and 8.9 g/t Ag over 4.4 m. SS22-011 intersected 115 g/t Ag and 2.0 g/t Au over 0.7 m within a broader 5.5 m interval of lower grade Ag mineralization, and an additional 9.9 g/t Ag and 1.7 g/t Au intercept over 2.1 m further downhole in an area with no previous drilling. 2022 drilling results extend mineralization further along strike to the northwest, southeast and to depth.