Corporate Presentation

August 2021

WWW.SILVERONE.COM TSX-V: SVE FF: BRK1 OTCQX: SLVRF

Forward-Looking Information

This presentation and related documents may contain certain 'forward-looking information' including but not limited to, statements related to interpretation of exploration and drilling results, potential mineralization, future exploration work at Silver One Resource Inc.'s ("Silver One") mineral properties and the expected results of this work. Forward-looking information involves known and unknown risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking information, including, without limitation: risks related to fluctuations in gold and metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that the results of work will not fulfill expectations and realize the perceived potential of Silver One's mineral properties; Silver One's ability to bring its mineral properties into production; uncertainties involved in the interpretation of drilling results and other tests; the possibility that required permits may not be obtained in a timely manner or at all; risk of accidents, equipment breakdowns or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from the exploration operations at Silver One's mineral properties. Forward-looking information contained in this presentation and related documents are based on the beliefs, estimates and opinions of management on the date the statements are made. There can be no assurance that such statements will prove accurate. Actual results may differ materially from those anticipated or projected. Except as required under securities laws, Silver One undertakes no obligation to update these forward-looking statements if managements' beliefs, estimates or opinions, or other factors, should change.

The technical content of this presentation has been reviewed and approved by Greg Crowe, P.Geo, President and CEO of Silver One, and a Qualified Person as defined by National Instrument 43-101.

Historical Resource Estimate on Candelaria Project

The historical resource estimate on the Candelaria Project was reported by SSR Mining Inc. (formerly, Silver Standard Resources Inc.) in a technical report titled "Candelaria Project Technical Report" dated May 24, 2001 (filed on SEDAR on June 20, 2002), prepared by Pincock Allen & Holt. The historical mineral resource estimate used "measured mineral resource", "indicated mineral resource" and "inferred mineral resource", which are categories set out in NI 43-101. Accordingly, Silver One considers these historical estimates reliable as well as relevant as it represents key targets for exploration work by Silver One. The qualified person has not done sufficient work to classify the historical estimate as a current mineral resource. Silver One is not treating this historical estimates as current mineral resources.

WWW.SILVERONE.COM TSX-V: SVE FF: BRK1 OTCQX: SLVRF

2

Silver One - Building a Silver Company

RANKED WITHIN THE TOP 10 PERFORMING MINING SECTOR STOCKS ON THE

"2020 VENTURE 50" OF THE TSX VENTURE EXCHANGE.

  • Since inception (2016), Silver One has added three highly prospective projects
  • Projects
    • Candelaria Mine Project (Nevada) - Flagship Project
      • Past-producingmine (68M oz) with large unexploited historic silver resource
      • Three main ways to create value:

1.) Heap leach pads 2.) High-grade opportunities 3.) Along-strike potential (1-2kmeast and west of historic pits)

      • Option with SSR Mining to acquire 100% interest
    • Cherokee Project (Nevada)
      • 100% ownership, attracting interested parties
      • Extensive epithermal high-gradesilver-gold-copper vein system, traced over 12km strike-length
    • Phoenix Silver Project (Arizona)
      • Option to acquire 100% interest
      • Very high-grade vein fragments with multiple exploration targets
  • Strong financial backing and public market support ($9.5M Financing - July 2020)
  • Proven management team with extensive background in large-scale development projects and negotiation

WWW.SILVERONE.COM TSX-V: SVE FF: BRK1 OTCQX: SLVRF

3

Why Silver - Worldwide Uses Growing - Supplies Diminishing

Other Industrial

14%

Etlylene Oxide

5%

Photovoltaic

8%

Photography

3%

Brazing Alloys & Solders

4%

Electrical & Electronics

21%

Jewelry & Silverware

25%

Coins & Bars 20%

(+35% during Precious Metals Bull Markets)

*2019 data

Silver is both an industrial and a precious metal making it extremely versatile.

WWW.SILVERONE.COM TSX-V: SVE FF: BRK1 OTCQX: SLVRF

4

Driving into the Green Future with Silver

Silver is both an industrial and a precious metal making it extremely versatile.

  • 700-800million ounces mined annually
  • Use increasing to 1 billion ounces annually
  • Solar panels and EV's projected to consume 200+ million ounces annually (2025)
  • Investor demand up as confidence in US$ as world reserve currency faulters

Sources: CPM Group Silver Yearbook 2020 and The Silver Institute

WWW.SILVERONE.COM TSX-V: SVE FF: BRK1 OTCQX: SLVRF

5

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original document
  • Permalink

Disclaimer

Silver One Resources Inc. published this content on 28 July 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 28 July 2021 18:03:03 UTC.