STLLR Gold Inc. announced the remaining assay results from the infill and confirmatory drilling program at the Windjammer South Deposit at the Golden Highway Area (western end) of the Tower Gold Project in Timmins, Ontario, Canada. Tower Gold Project Update: 129,737 m, in 477 drill holes, of the 140,000 m infill drill program completed have been released. Windjammer South Deposit Drilling: The Windjammer South Deposit is located on the Golden Highway Area (western end) of the Tower Gold Project in Timmins, Ontario.

Mineralization at Windjammer South is associated with extensional and stockwork-type quartz veining within Timiskaming age meta-sediments, located between 2 major splays of the prolific Destor-Porcupine Fault Zone. The 2023 drill program at Windjammer South was focused on confirming and infilling (50 m drill-centre spacings) the Tower Gold Project Mineral Resource Estimate (Tower MRE). The results from this batch of drilling appear to confirm the continuity of the Windjammer South mineralization as estimated by the Tower MRE block model.

This is evident particularly with holes MGH23-468, MGH23-478 and MGH23-507. In addition: Drill hole MGH23-484: Intersected significant mineralization in an area previously modelled as waste. Drill holes MGH23-483, MGH23-489, MGH23-490, MGH23-493, and MGH23-494: Geomechanical and Geometallurgical drilling that will benefit future mine designs.

Overall, the drilling at Windjammer South confirmed the Tower MRE block model. The increased drill density provides the potential to upgrade the areas drilled to a higher resource category and further define future geological models.