(via TheNewswire)
Stria lithium’s joint venture partner Cygnus Metals has recommenced drilling at Pontax Central. The drill program aims to test the extent of known mineralization through step out drilling.Stria’sjoint venture partner Cygnus Metals has a maiden JORCinferred resource Estimate (MRE) of 10.1Mt at 1.04% Li2O based on the central area of the known mineralisation.
This JORC estimate establishes Pontax Central as a serious player in the
Please see press release link https://wcsecure.weblink.com.au/pdf/CY5/02696744.pdf
About
Stria’s CentralPontax
Stria’s Pontax Central Project Joint Venture with Cygnus Metals now has a maiden JORC inferred resource Estimate (MRE) of 10.1Mt at 1.04% Li2O based on the central area of the known mineralisation.
This JORC estimate establishes Pontax Central as a serious player in the
Cygnus Metals is committed to fully funding and managing the current two-stage exploration and drilling program to a maximum of
Stria’s other significant project,Pontax IIcovers 55 square kilometres, approximately 25 kilometres to the west-south-west of Pontax Central and is located adjacent to the Billy-Diamond paved highway. Stria has added to this project by recently acquiring24 claims, for 1276.5 hectares that are strategically located northeast of Stria’s Pontax II claims.
Pontax II claims are in highly active prospective zones, situated to the west southwest of Stria/Cygnus lithium discovery and situated to the west of the Patriot Battery Metals (PMET.V) Pontax project, and south of Brunswick Exploration (BRW.V).
Stria’s Pontax properties are both situated close to an industrial powerline and a major paved highway, about 310 km north of the North American rail network that leads to the industrial heartland.
As momentum builds for the green energy revolution and the shift to electric vehicles, governments in
Stria is committed to exceeding the industry’s environmental, social and governance standards. A critical part of that commitment is forging meaningful, enduring and mutually beneficial relationships with the James Bay Cree Nation (Eeyouch), and engagingopenly and respectfully as neighbours and collaborators in this exciting project that has the potential to create lasting jobs and prosperity for Eeyou Istchee and its people.
The technical content disclosed in the current press release was reviewed and approved by
Reference:
JORC Mineral Resource Estimate of
Pontax Project ,James Bay Quebec ,Brian Wolfe ;Duncan Grieve ,August 14, 2023 .
For more information about
Follow us on:
Twitter @StriaLithium
Instagram @strialithium
Facebookhttp://www.facebook.com/strialithium
LinkedInhttp://www.linkedin.com/company/stria-lithium/
For more information on
CEO
dhanisch@strialithium.com
+1(613) 612-6060
Investors Relations,
ir@strialithium.com
Neither
Cautionary Note Regarding Forward-Looking Information
Except for statements of historical fact, this news release contains certain “forward-looking information” within the meaning of applicable securities law. Forward-looking information is frequently characterized by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”, “estimate” and other similar words, or statements that certain events or conditions “may” or “will” occur. Although we believe that the expectations reflected in the forward-looking information are reasonable, there can be no assurance that such expectations will prove to be correct. We cannot guarantee future results, performance or achievements. Consequently, there is no representation that the actual results achieved will be the same, in whole or in part, as those set out in the forward-looking information.
Forward-looking information is based on the opinions and estimates of management at the date the statements are made and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those anticipated in the forward-looking information. Please refer to the risk factors disclosed under our profile on SEDAR at www.sedar.com. Readers are cautioned that this list of risk factors should not be construed as exhaustive.
The forward-looking information contained in this news release is expressly qualified by this cautionary statement. We undertake no duty to update any of the forward-looking information to conform such information to actual results or to changes in our expectations except as otherwise required by applicablesecurities legislation. Readers are cautioned not to place undue reliance on forward-looking information.
Copyright (c) 2023 TheNewswire - All rights reserved.
Copyright (c) 2023 TheNewswire - All rights reserved., source