Sun Metals Corp. announced that additional high-grade mineralization has been returned from the southern area of the 421 zone contributing to the previously announced 900 metre (m) corridor of continuous high-grade copper- gold mineralization at the 100% owned Stardust project in northcentral B.C. The latest drill results provide information below the previously announced drill hole DDH20-SD-457M that established continuity from the 421 zone to the overlying Canyon Creek zone. This lower intercept in drill hole DDH20-SD-460D establishes a lower vertical connection of the mineralization into the 421 zone. Drill hole DDH20-SD-460D was drilled as an undercut daughter hole to DDH20-SD-457M to explore the vertical continuity of high-grade copper-gold mineralization in this critical area of the 421 zone. The hole intercepted: 3.34% Copper Equivalent (CuEq) 1 over 40.40m 2 grading 1.74% Copper (Cu), 1.41 grams per tonne (g/t) Gold (Au) and 26.6 g/t Silver (Ag), from 588.00m. Including 6.02% CuEq over 16.00m grading 3.12% Cu, 2.55 g/t Au and 48.2 g/t Ag, from 588.00m. This further supports that Stardust's high-grade copper-gold massive sulphide mineralization has now been traced along one of the continuous pathways in the currently known 900m of plunge length from surface.