TGC-1 announced Electricity production results for the nine months of 2019. Electricity output of TGC-1, including PJSC Murmanskaya CHPP, for 9 month of 2019 comprised 20,363.6 million kWh, which is 5.5% lower than for the same period of 2018. At the same time, the comparable electricity output at TGC-1 condensed heat power plants increased by 1.0%, which is due to market situation, as well as the need to ensure reliability of the power system in accordance with the load schedule of the power equipment upon the request of the System Operator of the United Power System. The electricity output by HPPs decreased by 12.8% due to the lower water content in the regions where company operates throughout the reporting period. The volume of heat output from collectors of TGC-1, including PJSC Murmanskaya CHPP, comprised 16,046.5 thousand Gcal, which is 2.4% lower than for the same period in 2018 due to unusually warm weather conditions in the first quarter of 2019.