Resource Infill and Extension Drilling Program
ASX RELEASE
29th of April 2022
TITANIUM SANDS LIMITED ACN 009 131 533
Level 11, London House 216 St. Georges Terrace Perth Western Australia 6000
Tel: +61 (08) 9481 0389
Facsimile: +61 (08) 94636103 emailhttp://titaniumsands.com.au
Contact:
Dr James Searle Managing Director Tel: +61 419 949 636james.searle@titaniumsands.com.au
Directors
Lee Christensen Dr James Searle Jason Ferris
Encouraging First Results
_______________________________________________________
The Board of Titanium Sands Ltd is pleased to advise that the first batch of results from the ongoing resource infill and extension drilling program (Figure 1) at its Mannar Island Project have been received. A total of 77 drill holes have been completed. Results from the first 68 drill holes have been received and all holes have returned significant heavy mineral intercepts with intercepts of up to 11m at over 8% Total Heavy Minerals (THM) (Table 1) (Figure 2) and with individual samples returning values in excess of 20% THM.
As previously announced to the market (ASX:TSL 4/1/221), the program consists of about 300 holes 12m deep for a total meterage of around 3,600m (Figure 1). The primary objective of the drilling is to convert more of the resource in the high-grade zone from an inferred to indicated mineral resource category by decreasing the RC aircore drill line separation from a nominal 400m to 200m.
All 77 holes drilled so far in this current program have reached the target depth of 12m. Of the 77 holes completed so far, 33 have been drilled beneath a 2km2 high grade resource zone previously only drilled by 2-3m deep auger drilling. All except two of the 33 12m RC aircore holes in this zone returned intercepts of 2-9% THM below the shallow resource (Figure 2 and Table 1).
The program is contained within the Company's high grade resource zone as outlined in the initial scoping study (ASX:TSL 16/06/20202). This high-grade zone contains a mineral resource3 of 93Mt at 5.24%THM of which 32% is in the indicated category (Table 2). It represents 35% of the total current mineral resource estimate for the project of 265Mt at 4.38%THM (Table 3).
Ticket ASX: TSL
The drilling is being managed by the Sri Lankan Geological Survey and Mines Bureau Technical Services Division ("GSMBTS") using TSL's reverse circulation/aircore drilling rig. Drilling operations have been interrupted several times by issues related to Covid-19 and more recently by political related protests that have resulted in the entire Sri Lankan Ministry resigning and being replaced over recent weeks. Completion of the remaining resource infill and extension drilling program will be completed as soon as practical.
BH ID | WGS84 N | WGS84 E | EOH m | >1mm% | <45 mic% | Fr m | To m | >2% THM |
MAC475 | 9.0755 | 79.831 | 12 | 16.57 | 10.33 | 0 | 12 | 2.54 |
MAC476 | 9.0752 | 79.8308 | 12 | 13.38 | 0 | 0 | 10 | 3.47 |
MAC477 | 9.0741 | 79.8299 | 12 | 14.87 | 4.22 | 0 | 11 | 3.3 |
MAC478 | 9.0716 | 79.8314 | 12 | 24.23 | 1.88 | 0 | 11 | 2.57 |
MAC479 | 9.0742 | 79.8335 | 12 | 22.82 | 2.79 | 0 | 11 | 2.15 |
MAC480 | 9.0725 | 79.8325 | 12 | 10.07 | 6.19 | 0 | 12 | 3.57 |
MAC481 | 9.0734 | 79.8334 | 12 | 28.15 | 0.23 | 0 | 6 | 2.12 |
MAC482 | 9.0751 | 79.8341 | 12 | 21.9 | 10.27 | 0 | 1 | 2.08 |
MAC483 | 9.0728 | 79.837 | 12 | 21.38 | 0.42 | 0 | 11 | 2.74 |
MAC484 | 9.0722 | 79.8366 | 12 | 45.94 | 0.1 | 0 | 8 | 2.71 |
MAC485 | 9.0712 | 79.8364 | 12 | 41.44 | 4.23 | 0 | 12 | 2.74 |
MAC486 | 9.0679 | 79.8334 | 12 | 5.75 | 2.84 | 0 | 11 | 4.06 |
MAC487 | 9.0685 | 79.8337 | 12 | 16.36 | 2.28 | 0 | 10 | 4 |
MAC488 | 9.0691 | 79.8351 | 12 | 28.61 | 1.4 | 0 | 8 | 6.85 |
MAC489 | 9.0703 | 79.8354 | 12 | 14.89 | 7.05 | 0 | 12 | 3.13 |
MAC490 | 9.0658 | 79.8363 | 12 | 36.83 | 2.34 | 0 | 12 | 6.41 |
MAC491 | 9.0685 | 79.8322 | 12 | 14.46 | 2.56 | 0 | 12 | 2.86 |
MAC492 | 9.0706 | 79.8309 | 12 | 28.67 | 0.55 | 0 | 9 | 3.27 |
MAC493 | 9.0691 | 79.8278 | 12 | 11.74 | 2.27 | 0 | 1 | 2.8 |
MAC494 | 9.0686 | 79.8291 | 12 | 17.86 | 1.93 | 0 | 10 | 2.05 |
MAC495 | 9.0733 | 79.8293 | 12 | 14.69 | 2.53 | 0 | 11 | 3.25 |
MAC496 | 9.0722 | 79.8281 | 12 | 35.69 | 0.81 | 0 | 10 | 3.08 |
MAC497 | 9.0728 | 79.8286 | 12 | 31.23 | 1.44 | 0 | 6 | 4.47 |
MAC499 | 9.0638 | 79.8346 | 12 | 8.73 | 1.47 | 0 | 11 | 2.13 |
MAC500 | 9.0644 | 79.8351 | 12 | 39.65 | 0.31 | 0 | 2 | 2.77 |
MAC501 | 9.0652 | 79.8357 | 12 | 42.86 | 1.53 | 0 | 12 | 3.75 |
MAC502 | 9.0639 | 79.8365 | 12 | 73.41 | 0.38 | 0 | 7 | 4.32 |
MAC503 | 9.0631 | 79.836 | 12 | 14.2 | 3.88 | 0 | 11 | 2.18 |
MAC505 | 9.0626 | 79.8355 | 12 | 57.04 | 0.56 | 0 | 3 | 4.9 |
MAC509 | 9.0562 | 79.8413 | 12 | 59.08 | 0.81 | 0 | 3 | 5.7 |
MAC510 | 9.0564 | 79.8409 | 12 | 22.69 | 0.66 | 0 | 5 | 2.86 |
MAC511 | 9.0603 | 79.839 | 12 | 41.17 | 1.48 | 0 | 10 | 3.33 |
MAC512 | 9.0600 | 79.8388 | 12 | 22.38 | 2.39 | 0 | 12 | 2.53 |
MAC513 | 9.0573 | 79.8421 | 12 | 29.82 | 4.79 | 0 | 12 | 4.86 |
MAC514 | 9.0537 | 79.8451 | 12 | 18.78 | 3.49 | 0 | 12 | 6.55 |
MAC515 | 9.0626 | 79.8355 | 12 | 37.13 | 0.9 | 0 | 7 | 9.2 |
MAC516 | 9.0489 | 79.8488 | 12 | 23.13 | 1.81 | 0 | 8 | 6.85 |
MAC517 | 9.0484 | 79.8483 | 12 | 11.96 | 1.59 | 0 | 10 | 3.22 |
MAC518 | 9.0469 | 79.8468 | 12 | 8.96 | 0.76 | 0 | 10 | 2.14 |
MAC519 | 9.0476 | 79.8477 | 12 | 22.51 | 2.48 | 0 | 9 | 3.03 |
MAC520 | 9.0464 | 79.8463 | 12 | 41.02 | 4.49 | 0 | 12 | 3.58 |
MAC521 | 9.0454 | 79.8458 | 12 | 48.92 | 4.28 | 0 | 12 | 2.07 |
MAC522 | 9.0446 | 79.8453 | 12 | 32.57 | 2.63 | 0 | 11 | 2.32 |
MAC523 | 9.0453 | 79.8434 | 12 | 38.66 | 1.9 | 0 | 2 | 3.87 |
MAC524 | 9.0427 | 79.8436 | 12 | 11.54 | 1.35 | 0 | 1 | 2.24 |
MAC525 | 9.0457 | 79.8515 | 12 | 23.69 | 1.78 | 0 | 10 | 5.61 |
MAC526 | 9.0448 | 79.8507 | 12 | 15.85 | 2.38 | 0 | 10 | 3.64 |
MAC527 | 9.0441 | 79.8501 | 12 | 3.69 | 0.42 | 0 | 7 | 3.23 |
MAC528 | 9.0434 | 79.8496 | 12 | 11.03 | 0.62 | 0 | 7 | 3.76 |
MAC529 | 9.0437 | 79.8495 | 12 | 15.92 | 3.49 | 0 | 11 | 2.43 |
MAC530 | 9.0422 | 79.8485 | 12 | 26.11 | 1 | 0 | 1 | 2.21 |
MAC531 | 9.0408 | 79.8472 | 12 | 14.39 | 2.5 | 0 | 10 | 2.92 |
MAC532 | 9.0402 | 79.8466 | 12 | 33.59 | 1.47 | 0 | 1 | 2.34 |
MAC534 | 9.0393 | 79.8462 | 12 | 5.89 | 0.98 | 0 | 1 | 2.06 |
MAC535 | 9.0382 | 79.8447 | 12 | 16 | 1.07 | 0 | 1 | 2.79 |
MAC537 | 9.0428 | 79.8534 | 12 | 22.62 | 2.41 | 0 | 12 | 6.73 |
MAC538 | 9.0420 | 79.8529 | 12 | 29.27 | 4.14 | 0 | 11 | 4.07 |
MAC539 | 9.0400 | 79.8558 | 12 | 21 | 4.99 | 0 | 12 | 7.07 |
MAC540 | 9.0393 | 79.8552 | 12 | 22.44 | 2.2 | 0 | 9 | 5.48 |
MAC541 | 9.0415 | 79.8548 | 12 | 17.91 | 2.53 | 0 | 10 | 6.03 |
MAC542 | 9.0495 | 79.8542 | 12 | 15.44 | 1.64 | 0 | 11 | 8.03 |
MAC543 | 9.0371 | 79.8513 | 12 | 13.67 | 4.59 | 0 | 11 | 4.82 |
MAC544 | 9.0392 | 79.8532 | 12 | 4.07 | 3.21 | 0 | 9 | 4.47 |
MAC545 | 9.0386 | 79.8525 | 12 | 33.22 | 1.08 | 0 | 9 | 3.82 |
MAC546 | 9.0379 | 79.8519 | 12 | 7.56 | 4.37 | 0 | 9 | 2.15 |
MAC547 | 9.0371 | 79.8518 | 12 | 39.7 | 4.37 | 0 | 11 | 2.81 |
MAC549 | 9.0387 | 79.8569 | 12 | 39.4 | 3.51 | 0 | 10 | 5.71 |
MAC550 | 9.0379 | 79.8563 | 12 | 31.27 | 2.72 | 0 | 10 | 5.07 |
Table 1 Intercepts in excess of 2% Total Heavy Minerals from the first 68 holes analysed.
Figure 1 RC-aircore drilling prior to the end of 2019 and the current program.
Figure 2 Results from the current RC-aircore program received to date (see Table 1).
Table 2 Mineral resource estimate for a higher grade zone contained within the resources tabulated below for a 2% (THM) lower cut off. Previously reported to the ASX in full compliance with the JORC 2012 requirements see below 3.
Table 3 Mineral Resource Estimate based on a lower cut off of 2% (THM). Previously reported to the ASX in full compliance with the JORC 2012 requirements see below 3.
Ends-
The Board of Directors of Titanium Sands Ltd authorised this announcement to be given to the ASX.
Further information contact:
James Searle
Managing Director T: +61 8 9481 0389
E:info@titaniumsands.com.au
Footnotes
1 Previously reported to the ASX 4th of January 2022 ''Resource Infill and Extension Drilling Program Commences'' .
2 Previously reported to the ASX 16th June 2020 "Scoping Study Confirms Potential for Major Dredging Project" .
3 Previously Reported to the ASX 24th of September 2020 "Project update and garnet added to resource update" .
Competent Persons Statements
Except where indicated, exploration results above have been reviewed and compiled by James Searle BSc (hons), PhD, a Competent Person who is a Member of the Australian Institute of Mining and Metallurgy, with over 37 years of experience in metallic and energy minerals exploration and development, and as such has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Dr Searle is the Managing Director of Titanium Sands Limited and consents to the inclusion of this technical information in the format and context in which it appears.
Compliance Statement
This report includes information (Table 2 and 3) that relates to Exploration Results and Mineral Resources prepared and first disclosed under JORC Code 2012. The information was extracted from the Company's previous ASX announcement as follows:
Released to the ASX 24/9/2020 "'Project update and garnet added to resource estimate".
This announcements is available to view on the Company's websitewww.titaniumsands.com.au
The Company confirms that it is not aware of any new information or data that materially affect the information included in the relevant market announcement and, in the case of estimates of the Company's Mineral Resources that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply with respect to the resource block model and total heavy mineral content and have not materially changed. The Company confirms that the form and context in which the Competent Persons' findings are presented have not been materially modified from the relevant original market announcements.
This report includes new exploration results and Appendix 1 contains information in compliance with JORC 2012 requirement for reporting of exploration results.
Forward Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning the Company's planned exploration program and other statements that are not historical facts. When used in this document, the words such as "could," "plan," "expect," "intend," "may", "potential," "should", "further" and similar expressions are forward-looking statements. Although the Company believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that further exploration will result in additional Mineral Resources.
This is an excerpt of the original content. To continue reading it, access the original document here.
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
Titanium Sands Ltd. published this content on 28 April 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 29 April 2022 00:41:04 UTC.