Tudor Gold Corp. announced that significant drilling progress has been made on its 2023 exploration program at its property, Treaty Creek, located in the Golden Triangle of Northwest British Columbia. To date, the Company has successfully completed over 5,400 meters of infill and step-out drilling, which forms part of a larger diamond drilling campaign spanning at least 25,000 meters.

Currently, there are four drill-rigs in operation. The first hole of the season, GS-23-164, a 150-meter step-out to the northeast has successfully reached its intended depth, intersecting the DS-5 Zone. This intersection revealed mineralization and veining from 558 m to 1,083 m, including a consistently observed, strongly altered, stockwork vein zone from 885 m to 972 m, similar to previous DS-5 holes.

Another noteworthy drill-hole GS-23-167, a 170-meter step-out, recently entered the CS-600 Zone intercepting disseminated chalcopyrite with minor copper sulphosalts and several semi-massive chalcopyrite veinlets associated with strong silicification and potassic alteration. The Goldstorm system is now approaching 2,000 meters in length along the NE axis and remains open in all directions and at depth. Based on the exciting results of holes GS-23-164 and GS-23-167, another step-out drill hole, GS-23-169, was collared and is currently at 357 m of a planned 1200 m depth targeting a further 150 m NE step out from GS-23-167 of the CS-600 Zone.

Furthermore, the technical team is planning to construct two additional drill pads for future drilling activities located at approximately 150 and 300 meters further to the northeast. These new drill pad locations will enable continued exploration of gold-copper mineralization targeting the north and northeast extensions of the CS-600 and DS-5 zones. In addition to the step-out holes, two infill holes are currently targeting areas of the Goldstorm Deposit to convert inferred resources to the indicated category.

Hole GS-23-166-W1, is at 570 m of a planned 1150 m depth and targeting a pocket of inferred CS-600 ounces, as well as a northward expansion of the DS-5 zone. Hole GS-23-168 is at 1008 m of a planned 1800 m depth and targeting the deep CS-600 zone infilling between holes GS-22-157 and GS-21-113-W2. Results from the Program will be provided by the Company once final assays are received and compiled.