Vendetta Mining Corp. announced the drill results from the 2022 Exploration drilling program on the Pegmont Lead-Zinc and Killer Bore projects in Queensland. Highlights: PVD209: 8.95 metres of 9.09 % Pb+Zn (8.95% Pb, 2.29% Zn); PVD211: 5.32 metres of 12.43% Pb+Zn (9.38% Pb, 3.05% Zn); PVD213: 4.80 metres of 9.13% Pb+Zn ("6.00% Pb, 3.14% Zn); and PVD218: 5.14 metres of 12.78% Pb+ Zn (8.88% Pb, 3.90% Zn).

Drilling occurred at the north-eastern end of Zone 3 and the western portion of Zone 2. In addition, exploration drilling was conducted at the Killer Bore Zinc project, located approximately 5 km to the west of Pegmont. The program was ended with the early onset of the wet season. The Company drilled two holes out of a planned ten-hole program at Killer Bore before suspending drilling due to the early onset of the wet year.

The first hole, VVD001 (-45 dip towards 270 azimuth) intersected 0.14% Zn over 4.8 metres, from 96.36 metres down hole, at the targeted position of the pyrrhotite iron stone horizon. The second hole VD002 (-45 dip towards 270Azimuth) attempted to drill 100 m down dip of the VD001 mineralised bed however it was suspended above target depth due to the onset of the rain.