Vine Energy Inc. announced the conclusion of the drilling phase of the longest onshore horizontal well in the State of Louisiana. The CHKMIN 20-29-32HC-01 ALT was recently drilled in Sabine Parish to the Mid-Bossier formation with an estimated lateral of 15,240 feet and total measured depth of 27,520 feet. The well was drilled in 35 days and the drilling phase cost approximately $400 per lateral foot, a Vine record for both drilling time and cost. The well is scheduled for completion in January 2022.