Whitebark Energy announced that initial pump assisted flow rates from Rex-3 were substantially greater than those seen in previous wells. Rex-3 averaged 1,278 boepd including 1,084 bopd of oil in the final 6 hours of a continuous 18 hour period which ended when the well was shut in to recover the down hole pump to allow the well to free flow up the production tubing. The oil and gas flows were accompanied by frac fluids which for the same period averaged 1,186 bpd. The oil cut at the end of the flow period was approximately 48%. To date, 12% of the frac fluids used to stimulate the well have been recovered. Like Rex-2, due to its the natural reservoir energy, Rex-3 will be allowed to continue to flow naturally while well cleanup continues.