Winchester Energy Limited announced that the first of three successfully re-completed Group Prospect wells, the Group 15A well, has been connected to oil sales. Over the past week, Group 15A has consistently produced between 25 and 30 bopd. Group 15A was re-entered and swabbed from prospective intervals identified from historic logs and immediately began to produce oil and sporadically flow of its own accord. Winchester then placed a pump on the well and installed power and production facilities at the well site for an all-in cost of approximately USD 60,000. The remaining successful workovers at the Group Prospect (Group 16A and Group 23A) are awaiting final connection to power to enable oil sales to
commence within two weeks. The oil and gas production rate for these wells, along with Winchester's revised total oil and gas production figures will be provided shortly.