As stated in the Company's news release dated
ACME's Phase 2 sampling program is designed to focus on the higher-grade Lithium rock anomalies and to expand into adjacent areas of similar geology and alteration in a southwest direction along the range front area. Previous sampling has identified trends where anomalous lithium and boron values show structures that were open and receiving fluids at the time of mineralization. Those structural zones are targets for where lithium and boron mineralization could be hosted in structural blocks such as grabens.
The FLV claim group encompass 144 lode mining claims totalling approximately 2,975 acres, in
On
About
Led by an experienced team,
Contact:
Tel: (604) 564-9045
Email: info@acmelithium.com
This news release may contain forward-looking information within the meaning of applicable securities laws ('forward-looking statements'). Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words 'expects,' 'plans,' 'anticipates,' 'believes,' 'intends,' 'estimates,' 'projects,' 'potential' and similar expressions, or that events or conditions 'will,' 'would,' 'may,' 'could' or 'should' occur and in this news release include but are not limited to the attributes of, timing for and expected benefits to be derived from exploration, drilling or development at ACME's project properties. Information inferred from the interpretation of drilling, sampling and other technical results may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. ACME's project location adjacent to or nearby lithium projects does not guarantee exploration success or that mineral resources or reserves will be defined on ACME's properties. Exploration, development, and activities conducted by regional companies provide assistance and additional data for exploration work being completed by ACME. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from the Company's operations and other risks and uncertainties. Any forward-looking statement speaks only as of the date it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise.
(C) 2023 Electronic News Publishing, source