ADS-TEC Energy and JOLT Energy announced an extension of their long-standing collaboration to deploy ultra-fast charging stations in major cities in Europe and the United States. JOLT has already ordered a high double-digit number of systems for 2023, and more orders are expected in support of JOLT's roll-out plan. The collaboration reflects the strong demand for a fast, convenient charging experience, especially in inner-city areas.

ADS-TEC Energy's battery-buffered, ultra-fast charging solutions provide charging power of up to 320 kW in power-limited, low-voltage energy grids, without the need for grid expansion. Waiting for grid expansion can take months, and in cities there is typically no space for electrical substations. Charging stations from ADS-TEC Energy, on the other hand, can be quickly integrated into existing sites with a minimum footprint.

In addition to supporting the grid, the ADS-TEC Energy stations store excess renewable energy so it is available for charging and other purposes. As a result, the charging stations turn into energy platforms that enable sustainable site energy management for operators and fast charging for electric vehicle drivers.