(via NewsDirect)
Bibby said: “We have defined a 194.7 million tonne (Mt) resource which when upgraded can produce a concentrate grade of over 67% Fe at Besikopa, which is a premium grade product in increasing demand in a decarbonising world.
“Our ongoing priority over recent drill campaigns has been to better define the DSO tonnage and grade, within that resource, to aid production planning.
“Bekisopa’s scoping study is due at the end of October and will define viable pathways to developing a low-cost DSO start-up operation to generate early cash flows.”
Contact Details
+61 413 713 744
jonathan@proactiveinvestors.com
Copyright (c) 2023 TheNewswire - All rights reserved.
Copyright (c) 2023 TheNewswire - All rights reserved., source