Anglo American Platinum Limited provided production guidance for the full year 2021. For the period, the company expects that M&C PGM production is tightened to between 4.2 - 4.4 million ounces, PGM production guidance (metal-in-concentrate) is tightened from 4.24.6 million PGM ounces, to between 4.2 4.4 million PGM ounces, due to lower third-party receipts and the continuing impact of rising Covid-19 infection rates on production. Refined PGM production (excluding tolling) guidance has been tightened from 4.6-5.0 million PGM ounces, to between 4.8 5.0 million PGM ounces as a result of proven operational stability in the processing assets. However, refined production is subject to rising infection rates from Covid-19, as well as potential Eskom power disruptions in the second half of the year.