Encuentro Latinoamericano
Innovación en Tecnología Verde para la Industria Minera X Exposición Internacional: San Juan Minera 2024
21 al 23 de mayo, 2024 Provincia de San Juan, Argentina
O U R S T R A T E G Y T O R E D U C E
CARBON
EMISSIONS
DISCLAIMER
Certain statements contained in this document, other than statements of historical fact, including, without limitation, those concerning the economic outlook for the gold mining industry, expectations regarding gold prices, production, total cash costs, all-in sustaining costs, all-in costs, cost savings and other operating results, return on equity, productivity improvements, growth prospects and outlook of AngloGold Ashanti plc's (the "Company", "AngloGold Ashanti" or "AGA") operations, individually or in the aggregate, including the achievement of project milestones, commencement and completion of commercial operations of certain of AngloGold Ashanti's exploration and production projects and the completion of acquisitions, dispositions or joint venture transactions, AngloGold Ashanti's liquidity and capital resources and capital expenditures, the consequences of the COVID-19 pandemic and the outcome and consequences of any potential or pending litigation or regulatory proceedings or environmental, health and safety issues, are forward-looking statements regarding AngloGold Ashanti's financial reports, operations, economic performance and financial condition. These forward-looking statements or forecasts are not based on historical facts, but rather reflect our current beliefs and expectations concerning future events and generally may be identified by the use of forward-looking words, phrases and expressions such as "believe", "expect", "aim", "anticipate", "intend", "foresee", "forecast", "predict", "project", "estimate", "likely", "may", "might", "could", "should", "would", "seek", "plan", "scheduled", "possible", "continue", "potential", "outlook", "target" or other similar words, phrases, and expressions; provided that the absence thereof does not mean that a statement is not forward-looking. Similarly, statements that describe our objectives, plans or goals are or may be forward-looking statements. These forward- looking statements or forecasts involve known and unknown risks, uncertainties and other factors that may cause AngloGold Ashanti's actual results, performance, actions or achievements to differ materially from the anticipated results, performance, actions or achievements expressed or implied in these forward-looking statements. Although AngloGold Ashanti believes that the expectations reflected in such forward-looking statements and forecasts are reasonable, no assurance can be given that such expectations will prove to have been correct. Accordingly, results, performance, actions or achievements could differ materially from those set out in the forward-looking statements as a result of, among other factors, changes in economic, social, political and market conditions, including related to inflation or international conflicts, the success of business and operating initiatives, changes in the regulatory environment and other government actions, including environmental approvals, fluctuations in gold prices and exchange rates, the outcome of pending or future litigation proceedings, any supply chain disruptions, any public health crises, pandemics or epidemics (including the COVID-19 pandemic), the failure to maintain effective internal control over financial reporting or effective disclosure controls and procedures, the inability to remediate one or more material weaknesses, or the discovery of additional material weaknesses, in the Company's internal control over financial reporting, and other business and operational risks and challenges and other factors, including mining accidents. For a discussion of such risk factors, refer to AngloGold Ashanti's annual report on Form 20-F for the year ended 31 December 2023 filed with the United States Securities and Exchange Commission ("SEC"). These factors are not necessarily all of the important factors that could cause AngloGold Ashanti's actual results, performance, actions or achievements to differ materially from those expressed in any forward-looking statements. Other unknown or unpredictable factors could also have material adverse effects on AngloGold Ashanti's future results, performance, actions or achievements. Consequently, readers are cautioned not to place undue reliance on forward-looking statements. AngloGold Ashanti undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events, except to the extent required by applicable law. All subsequent written or oral forward-looking statements attributable to AngloGold Ashanti or any person acting on its behalf are qualified by the cautionary statements herein.
The information included in this presentation has not been reviewed or reported on by AngloGold Ashanti's external auditors.
Non-GAAP financial measures
This communication may contain certain "Non-GAAP" financial measures. AngloGold Ashanti utilises certain Non-GAAP performance measures and ratios in managing its business. Non-GAAP financial measures should be viewed in addition to, and not as an alternative for, the reported operating results or cash flow from operations or any other measures of performance prepared in accordance with IFRS. In addition, the presentation of these measures may not be comparable to similarly titled measures other companies may use.
Website: www.anglogoldashanti.com
2 | X EXPOSICIÓN INTERNACIONAL: SAN JUAN MINERA 2024 |
CONTENT
1. AngloGold Ashanti (AGA) Corporate Profile
2. Cerro Vanguardia (CVSA) Operational Overview
3. AGA Decarbonization Strategy
4. Decarbonization Projects
5. Cerro Vanguardia windfarm - Challenges and Opportunities
3 X EXPOSICIÓN INTERNACIONAL: SAN JUAN MINERA 2024
ANGLOGOLD ASHANTI'S PORTFOLIO
Americas
Nevada
Continental Africa
Silicon
Merlin
North Bullfrog
Mother Lode
Rhyolite
Transvaal
Colombia
Gramalote
Quebradona
La Colosa
AngloGold Ashanti is an independent, global gold mining company with a diverse, high-quality portfolio of operations, projects and exploration activities across nine
Guinea
Siguiri
Brazil
Serra Grande
Brazil
AGA Mineração
(Cuiaba & Corrego do Sitio)
Argentina
Cerro Vanguardia
Ghana | DRC | |
Obuasi | ||
Iduapriem | Kibali | Tanzania |
Geita |
2023 at a Glance* | |
Gold Produced | 2,635 Moz. |
People Employed (1) (2) (3) | 33,658 |
Total Cash Costs** | $ 1,108 /oz. |
Capital Expenditure (2) | $1,127 m |
Total Mineral Reserve (2) | 28.1 Moz. |
Total Community Investment (2) (3) | $ 18.84 m |
Australia
Australia
Sunrise Dam
Australia
Tropicana
countries on four continents.
Operations | Projects | Greenfields |
(bubble size = relative production) |
4 X EXPOSICIÓN INTERNACIONAL: SAN JUAN MINERA 2024
Refer to the Company's corporate profile athttps://www.anglogoldashanti.com/company/corporate-profile/andhttps://reports.anglogoldashanti.com/23/ar/#glance
*All numbers include Corregio do Sitio which was placed on care and maintenance in August 2023. **For a reconciliation of these Non-GAAP financial measures, please refer to "Appendices: Non-GAAP Disclosure - Reconciliations", only relating to producing assets. (1) Average employed, includes contractors; (2) Includes projects; (3) Includes corporate and non-gold producing subsidiaries.
CERRO VANGUARDIA
CVSA has been in operation since 1998…
Operational Profile
Summary
History
- Started operations in 1998 (First Doré Bar).
Ownership
- AngloGold Ashanti has a 92.5% share.
- Fomicruz SE, a state-owned company holds 7.5%.
Location
- 110 Km NNW of Puerto San Julián in the province of Santa Cruz, ~2,300 Km from Buenos Aires, Argentina's capital.
Deposit
- Epithermal, low-sulphidation veins, containing
gold and silver.
Mine
- Multiple small open pits with high stripping
ratios Multiple narrow-vein underground mines - Sublevel Stopping - Started production in 2010.
Process Plant
- Mill throughput ~ 1.25 Mtpa.
- Heap Leach ~ 1.75 Mtpa.
- Production 2023 - Au: 152 Koz / Ag:~ 4.4 Moz.
…producing ~152 Koz. of gold and ~4.4 Moz. of silver in 2023.
5 | X EXPOSICIÓN INTERNACIONAL: SAN JUAN MINERA 2024 |
WHAT DOES REDUCING OUR CARBON EMISSIONS MEAN?
Reducing our carbon emissions…
Our commitment
- A 30% absolute reduction in Scope 1 & 2 greenhouse gas (GHG) emissions*
from energy use by 2030**
• Net zero Scope 1 and 2 GHG emissions by 2050 using renewable-energy technology to deliver full electrification of our operations
- Collaboration with targeted suppliers to reduce material Scope 3 GHG emissions
*Emissions from the consumption of fossil-based energy is the main source of carbon emissions for AngloGold Ashanti ** 2021 Baseline: Combined Scope 1 & Scope 2
Using 2021 carbon emissions as our
baseline:
1.4 Mt CO2e
Targeting a
30%
net reduction by 2030 requires a
46%
absolute reduction from our forecast emissions
…delivers value for our business, our industry and our stakeholders.
6 | X EXPOSICIÓN INTERNACIONAL: SAN JUAN MINERA 2024 |
SCOPE OF DIRECT AND INDIRECT EMISSIONS
Our Roadmap to Net Zero focuses on all sources of energy-related emissions…
Scope 1: Direct emissions from operations that are owned or controlled by AngloGold Ashanti; primarily emissions from fossil fuel combustion activities.
Purchased
goods
Upstream transport
SCOPE 1
Fuel and
energy-related
emissions
Scope 2: Indirect emissions from generation of | SCOPE 3 SCOPE 2 | Fossil fuel |
purchased electricity consumed by managed | combustion activities: Used in | |
heavy mining equipment and | ||
operations. | in electrical power generators | |
at off-grid sites | ||
Scope 3: Indirect emissions from our Supply | ||
Chain; our material Scope 3 emissions occur in | ||
just three of the fifteen GHG Protocol categories, | Generation of | |
namely purchased goods and services, fuel and | purchased electricity | |
energy related activities and upstream transport.
…through a combination of renewable energy projects, fleet electrification and lower-emission power sources.
7 | X EXPOSICIÓN INTERNACIONAL: SAN JUAN MINERA 2024 |
WE HAVE SET THE TARGET AND IDENTIFIED OPPORTUNITIES
Initial estimates show we have the opportunity to reduce absolute GHG emissions…
Total AngloGold Ashanti Emissions (Mt CO2-e)
1.8
1.7
1.6
1.5
1.4
1.3
1.2
1.1
1.0
0.9
0.8
0.1
0.0
Our Emissions Profile
-0.8 Mt | |||||||||||||||||||||
CO2-e | |||||||||||||||||||||
1.8 | |||||||||||||||||||||
Further | |||||||||||||||||||||
Opportunities: | |||||||||||||||||||||
0.4 | | Additional | |||||||||||||||||||
electrification | |||||||||||||||||||||
1.4 | | Additional solar | |||||||||||||||||||
with storage | |||||||||||||||||||||
| A larger wind | ||||||||||||||||||||
farm | |||||||||||||||||||||
Australia-:0.6 | -30% | ||||||||||||||||||||
-0.1 | |||||||||||||||||||||
0.02 | |||||||||||||||||||||
Wind & solar hybrid | 0.03 | 1.0 | |||||||||||||||||||
Ghana: Solar PV | -0.1 | ||||||||||||||||||||
plant | |||||||||||||||||||||
Guinea: Solar PV at | |||||||||||||||||||||
Siguiri | |||||||||||||||||||||
Argentina: Wind | |||||||||||||||||||||
farm at Cerro | |||||||||||||||||||||
Vanguardia | |||||||||||||||||||||
2021 | Growth | 2030 | Renewable | Cleaner Grid | Fleet | Efficiency | Additional | Target | |||||||||||||
Actual | Forecast | Energy | Energy | Electrification | Initiatives | (30% | |||||||||||||||
by 2030) | |||||||||||||||||||||
…by ~0.8 Mt CO2-e to ~1 Mt CO2-e by 2030.
8 | X EXPOSICIÓN INTERNACIONAL: SAN JUAN MINERA 2024 |
CARBON EMISSIONS REDUCTION PIPELINE
Our pipeline of initiatives is being tracked to ensure successful implementation…
Australia | Sunrise Dam | ||||||
Wind | |||||||
(Phase 2) | |||||||
Australia | |||||||
BEV | |||||||
Africa | Obuasi | ||||||
BEV | |||||||
Siguiri | |||||||
Geita | Solar / BESS | Siguiri | Ghana | Obuasi | |||
BEV | +60MW | 40 MW | 100MW | VSD | |||
Solar | Solar | Iduapriem | |||||
DGB | |||||||
Latam | CVSA | CVSA | CVSA | Cuiaba | |||
1GW | 10MW | Forest | |||||
Battery | |||||||
Wind | Wind | BEV | Carbon | ||||
Credits | |||||||
Nevada | Col. Electric | Col. Green | |||||
Nevada | Nevada | UG Equip. Col. 100% | Hydrogen | ||||
Rail-Veyor | Nevada | Trolley | Clean | Green Grid | |||
Growth | considered | BEV | Assist | Grid | |||
post 2030 |
AGA Funded / Sourced
Third Party / Split Funded
Target | 25kt | |
Emissions | 100kt CO2-e | |
CO2-e | ||
Reduction | ||
Sunrise Dam | | | ||
Tropicana | ||||
Solar | ||||
Hybrid | ||||
(Phase 1) | ||||
Renewables | ||||
Geita Star & | ||||
Comet to Grid | Obuasi | Obuasi | Geita | |
Tanesco Grid | ||||
Compressors | | |||
UG rail | Swap | |||
Brazil | ||||
Clean Grid |
…with the majority delivering benefits planned before 2030.
9 | X EXPOSICIÓN INTERNACIONAL: SAN JUAN MINERA 2024 |
TROPICANA HYBRID RENEWABLE PLANT
Tropicana has started construction of the wind turbine plinths…
Tropicana Construction Progress | Summary | ||
The Tropicana's Hybrid Renewable Plant is expected to provide ~50% clean energy offsetting ~65 Ktpa CO2-ein emissions through:
+ | ||||||
+ | ||||||
24 MW | 24 MW | 14 MW | ||||
Wind Turbines | Solar Plant | Battery |
We signed an agreement with Pacific Energy to construct the renewable wind and solar project, while continuing to operate the combined renewables-gas power station under a 10-year build-own-operatecontract.
The renewables integration is expected to almost eliminate Tropicana's diesel consumption for power generation and reduce natural gas consumption for power generation by approximately 50%.
…with completion planned for January 2025.
10 | X EXPOSICIÓN INTERNACIONAL: SAN JUAN MINERA 2024 |