Appia Rare Earths & Uranium Corp. provided an update on the progress of its ongoing drilling program to outline the extent of the mineralized zone at Target IV on its PCH Iconic Clay Project in Brazil. To date, the Company has processed and sent 2,255 samples for analysis, from both the Reverse Circulation (RC) and Auger drill programs, and expects to release results in the near future.

Summary: Completed 232 drill holes for a total of 2847.5 metres, of which: Reverse Circulation drilling: 147 holes totaling of 2,019 metres. Auger drilling: 84 holes totaling of 585 metres. Diamond drilling - Completion of 243.50 metres.

Logging and sampling is ongoing, and currently, 2,255 samples have been sent to SGS Geosol laboratory for assaying. In addition, the company announced the successful conclusion of the 243.50-meter diamond drill hole, which tested a strong magnetic anomaly at depth within the alkali breccia zone. Drill core will now be logged and sampled to be sent to the SGS Geosol laboratory for assaying.

The company's geologists and technicians follow strict quality assurance/quality control protocols for sample preparation and shipment to the SGS Geosol laboratories in Brazil.