Awalé Resources Limited reported outstanding assay results at the Odienné Project of 45.7 g/t gold over 32m from a new breccia pipe at the Charger target. Mineralization is consistently high grade throughout the reported interval. Table 1 shows each 1-metre assay within the interval, revealing this intercept's consistent and robust nature.

The core is dusted with very fine gold throughout, along with the +1mm gold grains often seen in previous Charger drilling. This new intercept opens Awale's original interpretation of broader mineralization where the breccia zones may connect at depth which would rapidly increase the volume of the high grade gold mineralization. The Charger Zone is a discovery that has delivered multiple high grade significant intercepts in previous drilling which includes the following high grade intercepts in the breccia pipe to the south of that intercepted in OEDD- 83 OERC-132: 32m @ 3.0 g/t Au from 74m downhole.

Including 4m @ 12.4 g/t Au from 78m downhole. OEDD-45 (step back from OERC 132) contains 3 high grade intervals within a 65 m wide zone of mineralization which included 12 m @ 4.9 g/t gold from 89m downhole, 13m at 1.3 g/t gold from 114m downhole and, And 21m @ 1.3 g/t gold from 133m downhole. Hole OEDD-53 (50m step back from OEDD-45): 32m @ 1.5g/t Au from 215m downhole Including 3m @ 5.2g/t Au from 77m.

4 holes for 699 m were drilled at Charger during this phase, three of these testing a new 3D geologic framework for mineralization at the target. Three holes (OEDD-78, OEDD-79 and OEDD-82) did not intercept significant mineralization. However, hole OEDD-83 was specifically targeted to drill through potential mineralization associated with the newly recognized NE structural control.

This intercept is 60 m north of the 2 previously intercepted breccia pipes, and is under the discovery hole at Charger, OERC-89.