Baroyeca Gold & Silver Inc. announced that it has resumed bulk-sampling at the Santa Barbara Gold Project in Bolivar, Colombia. A first batch of 10,304 kg of mineralized material has been processed through the pilot processing plant, which has recently been upgraded, with a gold dore bar poured on-site as part of preliminary metallurgical and plant efficiency tests. Assay results from the head-grade samples returned 18.20 g/t Au, with 130.4 grams of gold at 99.8% purity recovered on-site from the process (recoveries of 69.53%).