Bassari Resources Limited announced focused on discovering and developing multi-million ounce gold deposits in the Birimian Gold Belt, Senegal, West Africa. Mineral tenements over approximately 312km of prospective Birimian Gold Belt, Senegal. Makabingui Gold Project Feasibility Study Initial high grade open pit project of 1Mt a 5.7g/t for 174,000 oz production inventor $678/oz cash cost, USD 90 million pre Capex after tax cash flow in first three years, an expansion anticipated from underground and infill drilling of 8km Makabingui South zone. Makabingui Gold Project Mineral Resource (Prepared and disclosed under JORC Code 2004 and remains unchanged) 1 Moz in 11.9 Mt at 2.6 g/t gold (0.5 g/t cut-off): Indicated: 336,000 oz in 2.6 Mt at 4.0g/t. Inferred: 669,000 oz in 9.3 Mt at 2.2g/t. Makabingui Gold Project open pit JORC 2012 Probable Ore Reserve: 158,000 oz in 0.86 Mt at 5.7 g/t. Senegal, stable democracy since 1960. Well located tenements in a +60M ounce gold province hosting world class deposits. Multiple prospects identified along 60km of partially drilled mineralised strike.