Beam Global announced that the City of San Jos? in California has deployed four EV ARC solar-powered EV charging systems to charge City fleet EVs. The systems were purchased through the California Department of General Services (DGS) which serves to simplify the government procurement process and make chosen solutions available statewide at the best negotiated pricing. The City of San Jos?s EV ARC? charging systems fit in a standard parking space and are equipped with a dual port charger to serve the City?s growing fleet of electric vehicles. Each EV ARC? system generates and stores its own clean electricity and delivers that electricity to power City EVs day or night, and during inclement weather and power outages. Flood proof to 9.5 feet and wind-rated to 120 mph, the product adds to the City?s energy resiliency and disaster preparedness. The transportable but permanent unit includes the Emergency Power Panel option for first responder use during blackouts or in locations where there is no utility connection available. Transportable, the City?s EV ARC systems can be relocated as fleet charging patterns emerge, for City events, and as an emergency energy source. Requiring no connection to the utility grid, Beam Global products eliminate disruptive construction projects, costly electric circuit upgrades and utility charges to deliver significant long-term savings to city budgets.