Brahmaputra Infrastructure Limited informed that Company have received a LOA from the office of Executive Director (T.) ­ National Highway & Infrastructure Development Corporation of India for the execution of the Rehabilitation and Up-gradation of road from design Km 25.250 to Km 36.460 (Total Length: 11.210 Km) of Kailashahar - Kurti Bridge section of NH-208A to two lane with paved shoulder in the State of Tripura on EPC mode (Package III)-Balance work- Letter of Acceptance (LOA)- of an total amount INR 598.4 Million Crores. Nature of order: Engineering, Procurement and Construction (EPC) mode. Time period: 18 Months.

Whether domestic or international; Domestic.