Caledonia Mining Plc
NI 43-101 Technical Report on the Blanket Gold Mine, Zimbabwe
NI 43-101 Technical Report on the Blanket Gold Mine,
Zimbabwe
Prepared by: Caledonia Mining Plc
Effective Date: 31 December 2023
Issue Date: 15 May 2024
QUALIFIERD PERSONS:
C HARVEY
NHD Econ. Geol. MAIG (5108), MGSSA (966008)
MS VAN STADEN
B. Eng (Mining), Pr. Eng (20150089). AMMSA (MB3709). SAIMM (20422)
Caledonia Mining Plc
NI 43-101 Technical Report on the Blanket Gold Mine, Zimbabwe
DATE AND SIGNATURE PAGE
This Report titled "NI 43-101 Technical Report on the Blanket Gold Mine, Zimbabwe" was prepared by Caledonia Mining Plc. The Report is compliant with National Instrument 43-101 and Form 43-101 F1. The effective date of this Report is 1 March 2024.
The Qualified Persons responsible for this Report are Mr. C Harvey and Mr. M van Staden.
C HARVEY
NHD Economic Geology
MAIG (5108), MGSSA (966008)
VP Technical Services
Caledonia Mining
M van Staden
B. Eng (Mining)
Pr. Eng (20150089). AMMSA (MB3709). SAIMM (20422)
Technical Services Manager
Caledonia Mining
Signed at Roodepoort, Gauteng, South Africa, on 15 May 2024.
Caledonia Mining Plc
NI 43-101 Technical Report on the Blanket Gold Mine, Zimbabwe
ASSISTANT NON-QUALIFIED PERSONS
D Dube (Mineral Resource Manager, Blanket) | T Matsheza (Exploration Geology Manager, |
BSc (Geol. & Chem.), Cert.Sci.Nat., MGSZ, ZINIRE | Blanket) |
BSc (Geol. & Math.), MGSZ |
P Hill (Safety Manager, Blanket) | G Kadzikano (Metallurgical Manager, Blanket) |
Ndip (Min.), Dip (SHE) | Qualification |
C Mangwezi (Engineering Manager, Blanket) | D Mpofu (Head of Finance, Blanket) |
Ndip (Min.), Dip (SHE) | Bcom Acc (Hons), CA (Z) |
E de Villiers (Mining Engineer, Caledonia) | S Mashego (Resource Geologist, Caledonia) |
B Eng (Min.), MSAIMM | Qualification |
N Spies (Mining Engineer, Caledonia) | D Bleeker (Engineering Manager, Caledonia) |
Qualification | Qualification |
P Greyling (Rock Engineering Manager, Caledonia) | C Parkins (Head of ESG, Caledonia) |
B Eng (Min.), MSAIMM | MSc (Zoology), MBA, Pr.Sci.Nat |
E van Tubbergh (Geologist)
BSc Hons (Geol.), Cand.Sci.Nat., MGSSA
Caledonia Mining Plc
NI 43-101 Technical Report on the Blanket Gold Mine, Zimbabwe
TABLE OF CONTENTS | |||
ITEM 1 | EXECUTIVE SUMMARY | 19 | |
Item 1 (a) | Property Description | 19 | |
Item 1 (b) | Ownership of the Property | 20 | |
Item 1 (c) | Geology and Mineral Deposit | 20 | |
Item 1 (d) | Status of Exploration | 22 | |
Item 1 | (e) | Mineral Resource and Mineral Reserve Estimates | 22 |
Item 1 | (f) | Development and Operations | 24 |
Item 1 | (g) | Economic Analysis | 26 |
Item 1 | (h) | Qualified Person's Conclusions and Recommendations | 30 |
ITEM 2 | INTRODUCTION | 32 |
Item 2 (a) | Issuer Receiving the Report | 32 |
Item 2 (b) | Terms of Reference and Purpose of the Report | 32 |
Item 2 (c) | Sources of Information and Data Contained in the Report | 33 |
Item 2 (d) | Qualified Persons' Personal Inspection of the Property | 33 |
ITEM 3 RELIANCE ON OTHER EXPERTS | 35 | |
ITEM 4 PROPERTY DESCRIPTION AND LOCATION | 36 | |
Item 4 (a) | Area of the Property | 36 |
Item 4 (b) | Location of the Property | 36 |
Item 4 (c) | Mineral Deposit Tenure | 36 |
Item 4 (d) | Issuer's Title to / Interest in the Property | 40 |
Item 4 (e) | Royalties and Payments | 42 |
Item 4 (f) | Net Smelter Royalties | 42 |
Item 4 (g) | Environmental Liabilities | 42 |
Item 4 (h) | Permits to Conduct Work | 42 |
ITEM 5 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY | ||
45 | ||
Item 5 (a) | Topography, Elevation and Vegetation | 45 |
Item 5 (b) | Access to the Property | 45 |
Item 5 (c) | Proximity to Population Centres and Nature of Transport | 45 |
Item 5 (d) | Climate and Length of Operating Season | 46 |
Item 5 (e) | Infrastructure | 47 |
ITEM 6 | HISTORY | 49 |
Item 6 (a) | Prior Ownership and Ownership Changes | 49 |
Item 6 (b) | Historical Exploration and Development | 49 |
Item 6 (c) | Historical Mineral Resource Estimates | 49 |
Item 6 (d) | Historical Mineral Reserve Estimates | 50 |
Caledonia Mining Plc | ||
NI 43-101 Technical Report on the Blanket Gold Mine, Zimbabwe | ||
Item 6 (e) | Historical Production | 50 |
ITEM 7 GEOLOGICAL SETTING AND MINERALISATION | 51 | |
Item 7 (a) | Regional Geology | 51 |
Item 7 (b) | Local and Property Geology | 51 |
Item 7 (c) | Mineralisation | 54 |
ITEM 8 | DEPOSIT TYPES | 58 |
Item 8 (a) | Mineral Deposits Being Investigated | 58 |
Item 8 (b) | Geological Model | 59 |
ITEM 9 | EXPLORATION | 69 |
Item 9 (a) | Survey Procedures and Parameters | 69 |
Item 9 (b) | Sampling Methods and Sample Quality | 73 |
Item 9 (c) | Sample Data | 73 |
Item 9 (d) | Results and Interpretation of Exploration Information | 73 |
ITEM 10 | DRILLING | 74 |
Item 10 (a) | Type and Extent of Drilling | 74 |
Item 10 (b) | Factors Influencing the Accuracy of Results | 78 |
Item 10 (c) | Exploration Properties - Drill Hole Details | 79 |
ITEM 11 SAMPLE PREPARATION, ANALYSES AND SECURITY | 80 | |
Item 11 (a) | Sample Handling Prior to Dispatch | 80 |
Item 11 (b) | Sample Preparation and Analysis Procedures | 80 |
Item 11 (c) | Quality Assurance and Quality Control | 80 |
Item 11 (d) | Adequacy of Sample Preparation | 86 |
ITEM 12 | DATA VERIFICATION | 88 |
Item 12 (a) | Data Verification Procedures | 88 |
Item 12 (b) | Limitations on/Failure to Conduct Data Verification | 89 |
Item 12 (c) | Adequacy of Data | 90 |
ITEM 13 MINERAL PROCESSING AND METALLURGICAL TESTING | 91 | |
Item 13 (a) | Nature and Extent of Testing and Analytical Procedures | 91 |
Item 13 (b) | Basis of Assumptions Regarding Recovery Estimates | 91 |
Item 13 (c) | Representativeness of Samples | 91 |
Item 13 (d) | Deleterious Elements for Extraction | 91 |
ITEM 14 MINERAL RESOURCE ESTIMATES | 93 | |
Item 14 (a) | Assumptions, Parameters and Methods Used for Resource Estimates | 93 |
Item 14 (b) | Geostatistical Analysis and Variography | 112 |
Item 14 (c) | Mineral Resource Statement | 143 |
Caledonia Mining Plc | ||
NI 43-101 Technical Report on the Blanket Gold Mine, Zimbabwe | ||
Item 14 (d) | Mineral Resource Reconciliation | 145 |
Item 14 (e) | Disclosure Requirements for Resources | 151 |
Item 14 (f) | Individual Grade of Metals | 152 |
Item 14 (g) | Factors Affecting Mineral Resource Estimates | 152 |
ITEM 15 MINERAL RESERVE ESTIMATES | 153 | |
Item 15 (a) | Key Assumptions, Parameters and Methods | 153 |
Item 15 (b) | Mineral Reserve Reconciliation - Compliance with Disclosure Requirements | 158 |
Item 15 (c) | Multiple Commodity Reserve (Prill Ratio) | 160 |
Item 15 (d) | Factors Affecting Mineral Reserve Estimation | 160 |
ITEM 16 | MINING METHODS | 161 |
Item 16 (a) | Extraction Methods | 161 |
Item 16 (b) | Long-hole Stoping | 163 |
Item 16 (c) | Underhand Stoping | 164 |
Item 16 (d) | Parameters Relevant to Mine Design | 165 |
Item 16 (e) | Production Rates, Expected Mine Life, Mining Unit Dimensions, and Mining Dilution | 169 |
Item 16 (f) | Requirements for Stripping, Underground Development and Backfilling | 177 |
Item 16 (g) | Required Mining Fleet and Machinery | 179 |
ITEM 17 | RECOVERY METHODS | 180 |
Item 17 (a) | Flow Sheets and Process Recovery Methods | 180 |
Item 17 (b) | Plant Design, Equipment Characteristics and Specifications | 183 |
Item 17 (c) | Energy, Water and Process Materials Requirements | 186 |
ITEM 18 | PROJECT INFRASTRUCTURE | 189 |
Item 18 (a) | Infrastructure | 191 |
Item 18 (b) | Services | 198 |
ITEM 19 MARKET STUDIES AND CONTRACTS | 202 | |
Item 19 (a) | Market Studies and Commodity Market Assessment | 202 |
Item 19 (b) | Contracts | 211 |
ITEM 20 ENVIRONMENTAL STUDIES, PERMITTING AND SOCIAL OR COMMUNITY IMPACT.. | 212 | |
Item 20 (a) | Relevant Environmental Issues and Results of Studies Done | 212 |
Item 20 (b) | Waste Disposal, Site Monitoring and Water Management | 213 |
Item 20 (c) | Permit Requirements | 215 |
Item 20 (d) | Social and Community-Related Requirements | 215 |
ITEM 21 CAPITAL AND OPERATING COSTS | 217 | |
Item 21 (a) | Capital Costs | 217 |
Item 21 (b) | Operating Cost | 219 |
Caledonia Mining Plc | ||
NI 43-101 Technical Report on the Blanket Gold Mine, Zimbabwe | ||
ITEM 22 | ECONOMIC ANALYSIS | 227 |
Item 22 (a) | Introduction and Terms of Reference | 227 |
Item 22 (b) | Principal Assumptions | 229 |
Item 22 (c) | Cash Flow Forecast | 231 |
Item 22 (d) | Net Present Value | 234 |
Item 22 (e) | Sensitivity Analysis | 235 |
Item 22 (f) | Economic Analysis Conclusions | 239 |
ITEM 23 | ADJACENT PROPERTIES | 240 |
Item 23 (a) | Public Domain Information | 240 |
Item 23 (b) | Sources of Information | 241 |
Item 23 (c) | Verification of Information | 241 |
Item 23 (d) | Applicability of Adjacent Property's Mineral Deposit to Project | 241 |
Item 23 (e) | Historical Estimates of Mineral Resources or Mineral Reserves | 241 |
ITEM 24 OTHER RELEVANT DATA AND INFORMATION | 242 | |
Item 24 (a) | Risk Assessment | 242 |
ITEM 25 INTERPRETATION AND CONCLUSIONS | 244 | |
ITEM 26 | RECOMMENDATIONS | 246 |
ITEM 27 | REFERENCES | 247 |
APPENDIX 249 | ||
Appendix 1: Blanket Mine Producing Claims and Mining Lease | 249 | |
Appendix 2: Blanket Mine Non-Producing Claims | 252 | |
Appendix 3: Histograms and Probability Plots | 258 | |
Appendix 4: Variograms | 269 | |
Appendix 5: Swath Plots | 308 |
Caledonia Mining Plc | |
NI 43-101 Technical Report on the Blanket Gold Mine, Zimbabwe | |
FIGURES | |
Figure 1: General Location of Blanket Mine | 19 |
Figure 2: Geology of the Gwanda Greenstone Belt | 21 |
Figure 3: Blanket Mine Mineral Reserve Production Profile | 25 |
Figure 4: Blanket Mine Mineral Reserve Production Profile inclusive of Inferred Mineral Resources .. | 25 |
Figure 5: Capital Schedule | 28 |
Figure 6: Undiscounted Cash Flow | 29 |
Figure 7: Project Sensitivity (NPV 15.4%) | 29 |
Figure 8: Access Routes | 46 |
Figure 9: Gwanda Average Annual Temperatures and Precipitation | 47 |
Figure 10: General Location and Infrastructure | 48 |
Figure 11: Blanket Mine Historical Production (1906 to 2023) | 50 |
Figure 12: Geology of the Gwanda Greenstone Belt | 52 |
Figure 13: Stratigraphic Column of the Blanket Mine Area | 53 |
Figure 14: Local Geology of Blanket Mine | 54 |
Figure 15: Blanket Mine All Areas in Long Section, Looking East | 60 |
Figure 16: Blanket Section Orebodies and the Wenlock Fault on 630m Level | 61 |
Figure 17: Blanket Section in Section View, Looking North | 62 |
Figure 18: Section View of Blanket Feudal Hanging Wall in Relation to BQR Hanging Wall, Looking North | |
....................................................................................................................... | 63 |
Figure 19: Blanket Feudal, Blanket Orebodies and BQR at 140m Level | 64 |
Figure 20: Blanket, AR South and AR Main Orebodies on 810m Level | 65 |
Figure 21: Plan View of Section of 140mL ERC and Lima | 65 |
Figure 22: Mine Scale Geological Interpretation, Plan View | 66 |
Figure 23: Interpreted Mine Scale Trends at 810m Level | 67 |
Figure 24: Riedel Shears Showing Dextral Movement | 67 |
Figure 25: Z-Folding observed in the BQR, ERC and ARM Domains | 68 |
Figure 26: Long Section of Blanket Section Showing Location of 2023 Drilled Exploration Holes | 70 |
Figure 27: AMIS0792 Analysed Results vs. Expected Results | 83 |
Figure 28: AMIS0790 Analysed Results vs. Expected Results | 83 |
Figure 29: AMIS0724 Analysed Results vs. Expected Result | 83 |
Figure 30: Duplicate Results for 2023 | 84 |
Figure 31: Comparison of Results with Zim Labs | 85 |
Figure 32: Results of Round Robin | 86 |
Caledonia Mining Plc
NI 43-101 Technical Report on the Blanket Gold Mine, Zimbabwe
Figure 33: Long Section of Blanket Mine Showing the Total Database | 89 |
Figure 34: Achieved Recovery and Budget from 2017 to 2023 | 91 |
Figure 35: Data changes : 2022 Data vs 2023 Data | 95 |
Figure 36: Waterfall and bar graphs representing the change in data per orebody between 2022 and
2023 | 95 |
Figure 37: Section View of ARM Domain and Data | 96 |
Figure 38: Section View of ARS Orebody and Data | 97 |
Figure 39: Section View of ARS_EXT Orebody and Data | 98 |
Figure 40: Section View of BLK1 Orebody and Data | 99 |
Figure 41: Section View of BLK2 Orebody and Data | 100 |
Figure 42: Section View of BLK3 Orebody and Data | 101 |
Figure 43: Section View of BLK4_5 Orebody and Data | 102 |
Figure 44: Section View of BLK6 Orebody and Data | 103 |
Figure 45: Section View of BF Orebody and Data | 104 |
Figure 46: Section View of BQR Orebody and Data | 105 |
Figure 47: Section View of LIMA Orebody and Data | 106 |
Figure 48: Section View of ERC Orebody and Data | 107 |
Figure 49: Section View of JTH Orebody and Data | 108 |
Figure 50: Section View of SHT Orebody and Data | 109 |
Figure 51: Probability Plot for the ARM main Domain | 110 |
Figure 52: Histogram for the ARM main Domain | 111 |
Figure 53: Experimental Back Transformed Variogram Created for ARM | 115 |
Figure 54: KNA Analysis for Blanket 1 and Blanket 3 | 115 |
Figure 55: ARM Estimates | 121 |
Figure 56: ARS Estimates (including ARS_Ext) | 121 |
Figure 57: BLK1 Estimates | 122 |
Figure 58: BLK2 Estimates | 122 |
Figure 59: BLK3 Estimates | 124 |
Figure 60: BLK4_5 Estimates | 125 |
Figure 61: BLK6 Estimates | 125 |
Figure 62: BF Estimates | 126 |
Figure 63: BQR Estimates | 126 |
Figure 64: LIMA Estimates | 127 |
Figure 65: ERC Estimates | 127 |
Figure 66: JTH Estimates | 128 |
Caledonia Mining Plc | |
NI 43-101 Technical Report on the Blanket Gold Mine, Zimbabwe | |
Figure 67: SHT Estimates | 128 |
Figure 68: Long Section of Blanket Mine showing Stopes, Drives, Haulages and Shafts | 129 |
Figure 69: Swathe Plot of ERCN Domain in X, Y and Z Directions | 130 |
Figure 70: Swathe Plot of ERCN_FW Domain in X, Y and Z Directions | 130 |
Figure 71: Swathe Plot of ERCS Domain in X, Y and Z Directions | 131 |
Figure 72: ARM Mineral Resource Classification | 134 |
Figure 73: ARS Mineral Resource Classification (Including ARS_Ext) | 135 |
Figure 74: BLK1 Mineral Resource Classification | 136 |
Figure 75: BLK2 Mineral Resource Classification | 137 |
Figure 76: BLK3 Mineral Resource Classification | 138 |
Figure 77: BLK4_5 Mineral Resource Classification | 139 |
Figure 78: BLK6 Mineral Resource Classification | 139 |
Figure 79: BF Mineral Resource Classification | 140 |
Figure 80: BQR Mineral Resource Classification | 140 |
Figure 81: LIMA Mineral Resource Classification | 141 |
Figure 82: ERC Mineral Resource Classification | 142 |
Figure 83: JTH Mineral Resource Classification | 142 |
Figure 84: SHT Mineral Resource Classification | 143 |
Figure 85: Waterfall Graphs Illustrating the Change in Tonnage and Ounces Per Orebody in the Measured | |
Resource Category | 149 |
Figure 86: Waterfall Graphs for Grade, Tonnage and Ounces of Indicated Mineral Resources | 150 |
Figure 87: Waterfall Graphs for Grade, Tonnage and Ounces of Inferred Mineral Resources | 151 |
Figure 88: In Situ Mineral Resource to Mineral Reserve Conversion - Ore Tonnes and Grade | 155 |
Figure 89: Blanket Mine Mineral Reserve Production Profile Based on Measured and Indicated Mineral | |
Resources only | 157 |
Figure 90: Blanket Mine Content Delivered to the Plant | 157 |
Figure 91: Extraction Method: Mechanized | 161 |
Figure 92: Extraction Method: Conventional | 162 |
Figure 93: Schematic Representation of Long-hole Stoping Mining Method | 164 |
Figure 94: Schematic Representation of Underhand Stoping Mining Method | 165 |
Figure 95: Main Blanket Mine Shaft Infrastructure: Plan View (update picture - show active shaft above | |
in different colour to historical shafts) | 167 |
Figure 96: Blanket Mine Shaft Infrastructure: Section View | 167 |
Figure 97: Blanket Mine Simulated Ventilation airflow | 168 |
Figure 98: Diluted Annual Life of Mine Production Schedule on Measured and Indicated Mineral | |
Resources only | 170 |