Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output - 1088 MWe
- Electricity production since the beginning of the year: 5 299 862 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output - 1096 MWe
- Electricity production since the beginning of the year: 5 136 772 MWh
Attachments
- Original document
- Permalink
Disclaimer
CEZ a.s. published this content on 20 September 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 20 September 2021 11:41:08 UTC.