Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 7 - outage
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 502 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 496 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 502 MWe

Electricity production since the beginning of the year: 13 200 224 MWh.

Jiří Bezděk , Spokesman of the ČEZ Group, Nuclear Power Plant Dukovany

Attachments

  • Original document