Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 7 - outage
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 502 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 496 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 502 MWe
Electricity production since the beginning of the year: 13 200 224 MWh.
Jiří Bezděk , Spokesman of the ČEZ Group, Nuclear Power Plant Dukovany
Attachments
- Original document
- Permalink
Disclaimer
CEZ a.s. published this content on 01 December 2020 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 01 December 2020 06:54:07 UTC