'Shen 12' of Baoshen Railway Pulls over 5,000 Heavy-haul Trains
Author:Source:Economic Information DailyPubdate:2022-03-18Font size:【LMS

As of February 27, Baoshen Railway's electric locomotive "Shen 12" had pulled 5,031 10,000-ton heavy-haul trains, with over 43.46 million tons of cargo transported, cementing the company's transportation capacity to stabilize energy supply.

To ensure safe and stable operation of the 10,000-ton "2+0" marshalling mode of "Shen 12" locomotive traction unit, which was officially put into operation on Shenmu-Shuozhou Railway in October 2020, Baoshen Railway Group has solved a series of technical problems, such as long ramp starting, curved rail-line and undulating ramps, weak field reinforcement of train tail signals, fatigue detection and prevention of locomotive hitch devices. It has thus explored and formed a set of mature, efficient, safe and scientific "Shen 12" locomotive operation mode.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

CSEC - China Shenhua Energy Company Ltd. published this content on 18 March 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 23 March 2022 09:23:04 UTC.