• [ Date:2016-05-30 Visits:1 ]

  •   China Construction Communications Engineering Group Corporation Limited (CSCEC Communications) completed the erection of U-shape beam for Beihu Line Project (Package #2) of Changchun Rapid Transit on May 21, 2016, which is, for the first time, the U-shape beam structure being used for rapid transit in Northeast China.

      With the total length of 13.4km and 13 stations, the Project is done using U-shape beam with the building altitude of one-third of the box girder, which is convenient for the formation of energy-saving slopes.(from CSCEC Communications)

    【print】 【closed】

China State Construction Engineering Corporation Ltd. published this content on 30 May 2016 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 30 May 2016 08:56:11 UTC.

Original documenthttp://english.cscec.com/art/2016/5/30/art_211_277295.html

Public permalinkhttp://www.publicnow.com/view/10E9874E50285CFC3F12EFC4E0D5D4B8450774A2