Venture Vanadium Inc. provided an overview of the Company's Desgrobois Vanadium Project, including work completed on the property in 2019 and details of the planned 3-phase exploration program to provide a clearer understanding of the project's underlying geologic structure. The project represents potential for the recovery of titanium, iron and vanadium from two zones. In 2009, prior to Venture Vanadium acquiring the Project property, an NI 43-101 report was completed on most of the claims currently held by Venture Vanadium as well as on some claims that Venture Vanadium does not hold due to their undesirable potential for production. The Desgrobois target anomaly forms an irregular titaniferous magnetite mass and is substantially larger than the known Ivry deposit to the immediate south on its property. In 1953, a total of 22 diamond drill holes totaling 3,713 feet (1,132 m) were drilled on the Desgrobois target on a portion of one of the deposit's two anomalies. One diamond drill hole in the second anomaly showed 40 feet (12 m) of massive mineralization. From previous exploration work, prior to 2009, the Desgrosbois Zone represents two zones: a higher-grade exploration target of between 5-6 million tons, grading between 40-42% iron, 10-12% titanium dioxide, and between 0.12-0.15% vanadium, and, a disseminated exploration target of between 900,000 and 1.1 million tons, grading between 25-26% iron, and between 6-7 % titanium dioxide, and between 0.1-0.15% vanadium. The Titanium Development Zone is located in the south-central area of its property, roughly 1.5 miles (2.5 km) south of the Desgrobois deposit. The Titanium Development Zone, from previous exploration, represents an exploration target of between 2,500,000 and 3,000,000 tons grading between 37-39% iron, 29-31% titanium dioxide, and between 0.1 and 0.2 % vanadium. The previous work indicates that there may be a central zone amenable to removal by open pit methods. Two large negative magnetic anomalies lie on the western extension of the company's claim block, representing additional potential targets to explore. As well, the Ivry deposit, located immediately south of the Titanium Development Zone target contains an exploration target as indicated from previous drilling to have an exploration potential of between 2.5 -3 million tons grading between 29-31% titanium and 37-39% iron, with a vanadium content of undetermined level.