Dixie Gold Inc. announced that it has commenced its 2021 field exploration at the Red Lake Project located near Red Lake, Ontario. Through its Red Lake Project, Dixie Gold controls and is advancing a large district-scale gold exploration project currently covering 25,269 ha (>60,000 acres) which is situated immediately adjacent and contiguous to the Dixie Project being advanced by neighbouring exploration company Great Bear Resources Ltd. During 2020, and despite restrictions related to COVID-19, Dixie Gold performed significant exploration work at its Red Lake Project and successfully executed multiple exploration programs totaling approximately $400,000 of expenditures, all of which was successfully completed without incurring shareholder dilution. Highlights included airborne surveys ever performed in the Red Lake gold camp and a large-scale multi-thousand SGH soil sample program. The steady and paced progression of its exploration approach has enabled Dixie Gold to methodically advance what it views as a significant gold exploration opportunity at its Red Lake Project while remaining attentive to its exceptional capital structure. Initial exploration planning for the 2021 field season has been guided by the significant gold-in-soil anomalies identified by the results from Dixie Gold's inaugural field season at the Red Lake Project. Follow-on geophysical interpretative work performed earlier this year confirmed that the location of the previously reported gold-in-soil anomalies correspond with interpretated magnetic breaks. Magnetic data at the Red Lake Project is dominated by west-northwest trending magnetic linear features that parallel the trends of the presently defined LP Fault deformation zone on the adjacent property held by Great Bear Resources Ltd. As outlined by Dixie Gold and its retained geological experts, there is a high degree of faulting in various directions within the Corporation's Red Lake Project, which in turn may offer excellent prospective structural traps for gold mineralisation.