Dolly Varden Silver Corporation announced that drilling has commenced at the Dolly Varden Silver Project, located near tidewater in northwest British Columbia. The initial surface diamond drill program will consist of 10,000 meters split 50/50 between infill and expansion of the high-grade, potentially bulk-mineable silver resource at the Torbrit deposit and regional exploration of multiple, highly prospective targets throughout the Property. The 2021 Drilling Program is the first Phase of a two-year goal to aggressively expand and upgrade the Torbrit Silver Deposit and multiple silver-rich satellite zones with the objective of advancing Dolly Varden to be the next high-grade pure silver mine in British Columbia. Drilling at Torbrit will be targeting areas within the updated block model where a high percentage of inferred resources exist and where the higher silver grade blocks are at the outer edges of the model. It is these areas that have the potential to expand the model out along the Torbrit horizon. In addition, infill drilling from 2020 indicates that a number of lenses that have been modelled out as separate zones coalesce in places into one continuous mineralized body creating an opportunity for expansion.