Doubleview Gold Corp. report that diamond drill coring at the Hat Polymetallic Deposit in 2023 has exceeded footages achieved in all prior years. Total coring has passed the 7,500 metre milestone and is continuing at full speed.

Doubleview's drilling and other activities are wholly focused on expanding mineral resource by extending the mineralization laterally and to greater depths and learning more about the geology and metallurgy of what appears more and more, to be a deposit of considerable importance. The Company, in addition to the remarkable drilling performance, has been particularly active in laboratory and resource estimation studies and is positioning itself for accelerated exploration efforts in the remainder of the field season. Notably, a team of six archaeologists undertook extensive archaeological fieldwork, including shovel test studies.

The results of this work will contribute to detailed archaeological reports, which will be submitted to the Archaeological Branch of BC and the Ministry of Energy and Mine and Low Carbon Innovation. The Company reported that the initial findings suggest no significant archaeological obstacles on the Hat Polymetallic project. To ensure the integrity of various activities, and in anticipation of greater levels of exploration, company have reviewed and revised quality assurance/quality control (QA/QC) procedures and can confirm that chain-of-control and other measures are working smoothly and satisfactorily.