Operating Data Preview 2021
Madrid, January 19th, 2022
Key Highlights
EDPR installed capacity increased to 13.6 GW (+1.4 GW YoY), with Europe and North America representing 42% and 52% of the portfolio, respectively.
Capacity additions in 2021 amounted to 2.6 GW and capacity under construction totalled 1.8 GW as of Dec-21(does not include 401 MW of Installed capacity and 162 MW of Under construction capacity as of Dec-21relating to Sunseap acquisition). Following the successful completion of the Asset rotation deals in the US and in Portugal, net additions YoY totalled 1.4 GW.
EDPR generated 30.3 TWh of clean energy in 2021 (+6% YoY), with Europe and North America representing 37% and 56% of total generation output, respectively. In Europe, generation increased 13% YoY, impacted by higher installed capacity and slightly better resource. In North America, output is down -2%YoY reflecting the new capacity in operation offset by low resource and the impact of the one-offERCOT event in 1Q21. In Latin America, production increased 73% driven by higher installed capacity along with higher resource in Brazil.
In 2021, EDPR achieved a 29% load factor (-0.8pp YoY) reflecting a Renewables index of 96% of P50 expected long term average Gross Capacity Factor, following recovery of renewable resource in 4Q21 which stood at 97% of P50 expected long term average Gross Capacity Factor (104% in Europe in 4Q21).
EDPR continues to accelerate growth with 13.6 GW already installed and a higher technology diversification with 1.1 GW of solar and 1.5 GW gross of offshore in operation and/or under construction.
Installed Capacity (1) | Installed Capacity by Region | ||||||||||||||||||||||||||||
0.2% | |||||||||||||||||||||||||||||
6% | |||||||||||||||||||||||||||||
EBITDA + Eq. MW | 2021 | Additions | AR | YoY | U/C | ||||||||||||||||||||||||
Europe | 5,727 | +993 | (232) | +761 | 421 | ||||||||||||||||||||||||
North America | 7,030 | +1,204 | (790) | +263 (2) | 320 | 13.6 GW | 42% | ||||||||||||||||||||||
Latin America | 795 | +359 | - | +359 | 1,084 | 52% | |||||||||||||||||||||||
APAC | 28 | +28 | - | +28 | - | ||||||||||||||||||||||||
EDPR | 13,580 | +2,584 | (1,022) | +1,411 | 1,824 | ||||||||||||||||||||||||
Electricity Generation | Europe | North America | LatAm | APAC | |||||||||||||||||||||||||
Generation by Region | |||||||||||||||||||||||||||||
GWh | 2021 | 2020 | YoY | 6% | |||||||||||||||||||||||||
Spain | 4,979 | 4,346 | +15% | ||||||||||||||||||||||||||
Portugal | 3,049 | 2,624 | +16% | ||||||||||||||||||||||||||
Rest of Europe | 3,329 | 3,054 | +9% | 37% | |||||||||||||||||||||||||
Europe | 11,357 | 10,024 | +13% | ||||||||||||||||||||||||||
US | 15,814 | 16,633 | (5%) | 30.3 TWh | |||||||||||||||||||||||||
Canada | 255 | 78 | +228% | ||||||||||||||||||||||||||
Mexico | 987 | 710 | +39% | ||||||||||||||||||||||||||
North America | 17,057 | 17,421 | (2%) | 56% | |||||||||||||||||||||||||
Brazil | 1,888 | 1,093 | +73% | ||||||||||||||||||||||||||
Latin America | 1,888 | 1,093 | +73% | ||||||||||||||||||||||||||
Vietnam | 23 | - | - | ||||||||||||||||||||||||||
APAC | 23 | - | - | ||||||||||||||||||||||||||
EDPR | 30,324 | 28,537 | +6% | Europe | North America | LatAm | |||||||||||||||||||||||
Load Factor | NCF (%) | vs. P50 GCF (%) | |||||||||||||||||||||||||||
NCF (%) | 2021 | 2020 | YoY | ||||||||||||||||||||||||||
Spain | 26% | 25% | +1pp | ||||||||||||||||||||||||||
Portugal | 28% | 26% | +2pp | 26% | 98% | ||||||||||||||||||||||||
Rest of Europe | 26% | 27% | -1pp | Europe | |||||||||||||||||||||||||
Europe | 26% | 26% | +1pp | ||||||||||||||||||||||||||
US | 31% | 33% | -2pp | ||||||||||||||||||||||||||
Canada | 28% | 30% | -2pp | 31% | 94% | ||||||||||||||||||||||||
Mexico | 41% | 41% | +0.4pp | N. America | |||||||||||||||||||||||||
North America | 31% | 33% | -2pp | ||||||||||||||||||||||||||
Brazil | 41% | 38% | +3pp | ||||||||||||||||||||||||||
Latin America | 41% | 38% | +3pp | ||||||||||||||||||||||||||
Vietnam | 20% | - | - | LatAm | 41% | 102% | |||||||||||||||||||||||
APAC | 20% | - | - | ||||||||||||||||||||||||||
EDPR | 29% | 30% | -0.8pp | EDPR | |||||||||||||||||||||||||
96% | |||||||||||||||||||||||||||||
Renewables Index (vs. expected L‐T avg. Gross Capacity Factor) | |||||||||||||||||||||||||||||
29% | |||||||||||||||||||||||||||||
(%) | 2021 | 2020 | YoY | ||||||||||||||||||||||||||
EDPR | 96% | 96% | - |
- Does not include 401 MW of Installed capacity and 162 MW of Under construction capacity as of Dec-21 relating to Sunseap acquisition
- The YoY variation considers the decommissioning of the original 151 MW related to Blue Canyon II Repowering
Note: Solar capacity and solar load factors reported in MWac | ||
EDPR Investor Relations | Phone: +34 902 830 700 | |
EDP Renováveis, S.A. | Head office: Plaza de la Gesta, 2 - 33007 Oviedo, Spain | Site: www.edpr.com | Email: ir@edpr.com |
Operating Data Preview 2021
Madrid, January 19th, 2022
Installed Capacity (1) | Installed Capacity by Technology | ||||||||||||
2021 | |||||||||||||
MW | 2021 | Additions | AR | YTD | U/C | ||||||||
Spain | 2,194 | +56 | - | +56 | 141 | ||||||||
Portugal | 1,142 | +135 | (221) | (86) | - | ||||||||
Rest of Europe | 1,894 | +491 | - | +491 | 280 | ||||||||
Europe | 5,230 | +682 | (221) | +461 | 421 | ||||||||
US | 5,908 | +1,142 | (911) | +80 (2) | 224 | 6% | |||||||
Canada | 130 | +62 | - | +62 | - | 13.6 GW | |||||||
Mexico | 400 | - | - | - | 96 | 2% | |||||||
North America | 6,438 | +1,204 | (911) | +142 | 320 | 92% | |||||||
Brazil | 795 | +359 | - | +359 | 580 | ||||||||
Colombia | - | - | - | - | 504 | ||||||||
Latin America | 795 | +359 | - | +359 | 1,084 | ||||||||
Vietnam | 28 | +28 | - | +28 | - | ||||||||
APAC | 28 | +28 | - | +28 | - | ||||||||
EBITDA MW | 12,490 | +2,273 | (1,131) | +990 | 1,824 | Wind Onshore | Solar | Wind Offshore | |||||
Spain | 156 | - | (11) | (11) | - | ||||||||
Portugal | 31 | - | - | - | - | ||||||||
Rest of Europe | 311 | +311 | - | +311 | - | ||||||||
Europe | 498 | +311 | (11) | +300 | - | ||||||||
US | 592 | - | +121 | +121 | - | ||||||||
North America | 592 | - | +121 | +121 | - | ||||||||
Eq. Consolidated | 1,090 | +311 | +110 | +421 | - | ||||||||
EDPR | 13,580 | +2,584 | (1,022) | +1,411 | 1,824 | ||||||||
Wind Onshore | Capacity Additions YTD | ||||||||||||
2021 | |||||||||||||
MW | 2021 | Additions | AR | YTD | U/C | Project | Country | MW | |||||
Spain | 2,194 | +56 | - | +56 | 133 | Corme + Perdiguera | Spain | +40 | |||||
Portugal | 1,138 | +135 | (221) | (86) | - | Las Herrerías | Spain | +16 | |||||
Rest of Europe | 1,843 | +491 | - | +491 | 280 | Overequipments | Portugal | +10 | |||||
Europe | 5,175 | +682 | (221) | +461 | 412 | Sincelo + Tocha II | Portugal | +125 | |||||
US | 5,750 | +870 | (707) | +12 (2) | - | Vaudr. + Preus. + 7 Dom. | France | +30 | |||||
Canada | 130 | +62 | - | +62 | - | Brux + Prouville III + R. Blandey II | France | +26 | |||||
Mexico | 200 | - | - | - | 96 | Serracapriola + A. del Vento | Italy | +44 | |||||
North America | 6,079 | +932 | (707) | +74 | 96 | Breva + Monte Mattina | Italy | +70 | |||||
Brazil | 591 | +156 | - | +156 | 580 | Poland Auct.'19 + Poland 4Q21 | Poland | +272 | |||||
Colombia | - | - | - | - | 504 | Livadi | Greece | +45 | |||||
Latin America | 591 | +156 | - | +156 | 1,084 | Muirake | UK | +5 | |||||
EBITDA MW | 11,845 | +1,769 | (928) | +690 | 1,592 | Headwaters II + Reloj del Sol | US | +237 | |||||
Spain | 156 | - | (11) | (11) | - | Wildcat Creek + Crossing Trails | US | +169 | |||||
Portugal | 20 | - | - | - | - | Indiana Crossroads II | US | +302 | |||||
Europe | 175 | - | (11) | (11) | - | Blue Canyon II Repower | US | +162 | |||||
US | 413 | - | +81 | +81 | - | Nation Rise | Canada | +62 | |||||
North America | 413 | - | +81 | +81 | - | Santa Rosa e Mundo Novo | Brazil | +156 | |||||
Eq. Consolidated | 588 | - | +70 | +70 | - | ||||||||
EDPR | 12,434 | +1,769 | (858) | +760 | 1,592 | Wind Onshore Additions YTD | +1,769 | ||||||
Solar (1) | Capacity Additions YTD | ||||||||||||
2021 | |||||||||||||
MW | 2021 | Additions | AR | YTD | U/C | Project | Country | MW | |||||
Spain | - | - | - | - | 9 | Distributed Solar | US | +72 | |||||
Portugal | 5 | - | - | - | - | Pereira Barreto | Brazil | +204 | |||||
Rest of Europe | 50 | - | - | - | - | Trung Son | Vietnam | +28 | |||||
Europe | 55 | - | - | - | 9 | Riverstart Solar | US | +200 | |||||
US | 158 | +272 | (204) | +68 | 224 | ||||||||
Mexico | 200 | - | - | - | - | ||||||||
North America | 358 | +272 | (204) | +68 | 224 | ||||||||
Brazil | 204 | +204 | - | +204 | - | ||||||||
Latin America | 204 | +204 | - | +204 | - | ||||||||
Vietnam | 28 | +28 | - | +28 | - | ||||||||
APAC | 28 | +28 | - | +28 | - | ||||||||
EBITDA MW | 645 | +503 | (204) | +300 | 232 | ||||||||
US | 179 | - | +40 | +40 | - | ||||||||
North America | 179 | - | +40 | +40 | - | ||||||||
Eq. Consolidated | 179 | - | +40 | +40 | - | ||||||||
EDPR | 824 | +503 | (164) | +340 | 232 | Solar Additions YTD | +503 | ||||||
Wind Offshore | Capacity Additions YTD | ||||||||||||
2021 | |||||||||||||
MW | 2021 | Additions | AR | YTD | U/C | ||||||||
Portugal | 11 | - | - | - | - | ||||||||
Rest of Europe | 311 | +311 | - | +311 | - | ||||||||
Europe | 322 | +311 | - | +311 | - |
EDPR Eq. Consolidated | 322 | +311 | - | +311 | - |
Ocean Winds Gross Capacity | 1,462 | +1,437 | - | +1,437 | - |
Wind Offshore Additions YTD | +311 |
Wind Offshore Gross Additions YTD | +1,437 |
- Does not include 401 MW of Installed capacity and 162 MW of Under construction capacity as of Dec-21 relating to Sunseap acquisition
- The YoY variation considers the decommissioning of the original 151 MW related to Blue Canyon II Repowering
Note: Solar capacity and solar load factors reported in MWac | ||
EDPR Investor Relations | Phone: +34 902 830 700 | |
EDP Renováveis, S.A. | Head office: Plaza de la Gesta, 2 - 33007 Oviedo, Spain | Site: www.edpr.com | Email: ir@edpr.com |